Question Answer
Types of construction Minor-Major-Specific ^ Original works-repair ^ Light-heavy-industrial
What is light construction Residential & school building, village of city roads, water supply & sewage works
Heavy construction Tunneling, transportation project as railways, highways, harbors
Stages in construction project Conceptual stage Analysis & development of the idea Design stage Tendering & awarding of the contract Construction of the project Commissioning of the project
What is the conceptual or initiation stage Idea stage Entreprenual efforts to satisfy the need of society Ideas have to be constantly nurtured to reach completion stage
What happens in analysis & development of the idea Analysis of cost and its benefits Initial surveys to be conducted Cost estimate prepared
Design stage Field investigations & survey Drawing of elements Final estimate
Awarding the contract for construction Tender documents Awarding the tender The tender value is economically competitive
The construction stage Finish the project within expected time
Project clean up phase Putting completed facilities into use Keeping up continuous maintenance
Work break down structure Breaking to project into easily identifiable major systems, their subsystems & discrete activities
Steps involved in planning Crystallizing the opportunity or problem Securing & analyzing necessary information Establishing planning premises & constrains Ascertaining alternative course of action Selecting optimum plan Determine derivative plan Fixing the timing of introduction Arranging future evaluation of effectiveness of the plan
Stages of planning Preparing General framework, cost benefits, investment alternative Detailed planning Detailed design, drawing, specifications, bill of quantities, project breakdown Monitoring & control Updating the schedule
Steps in project scheduling phase Calculate-quantity of work Assign- timings to events & activities Give- consideration to the resources (availability is limited) Allocate-the resources
Steps involved in preparing a bar chart Divide project into activities List out the activities Find inter relationship Arrange activities Calculate the quantity of work & time required Draw according to scale
Show full summary Hide full summary

Similar

Midterm 1 diagrams
Cj Alsenay
Romeo and juliet
Patrick N
Tips for IB History Paper 1
enyarko
An Inspector Calls - Themes
mhancoc3
Animal Farm
010534
Mapas mentales con ExamTime
julii.perci
AQA GCSE Physics Unit 2 Mindmap
Gabi Germain
“In gaining knowledge, each area of knowledge uses a network of ways of knowing.” Discuss this statement with reference to two areas of knowledge_1
shobha nayar pan
Months of the Year in Korean
Sabine Callebaut
Computer science quiz
Ryan Barton
Diseño de Software
Verny Fernandez