  1. ESTIMATE ACTIVITY DURATIONS IS THE PROCESS OF ESTIMATING THE NUMBER OF WORK PERIODS NEEDED TO COMPLETE INDIVIDUAL ACTIVITIES WITH ESTIMATED RESOURCES
    1. ROLE OF THE PROJECT MANAGER IN ESTIMATING IS TO:
      1. 1. PROVIDE THE TEAM WITH ENOUGH INFORMATION TO PROPERLY ESTIMATE EACH ACTIVITY
        1. 2. LET THOSE DOING THE ESTIMATING KNOW HOW REFINED THEIR ESTIMATES MUST BE
          1. 3. COMPLETE A SANITY CHECK OF THE ESTIMATES
            1. 4. PREVENT PADDING.PADDING IS EXTRA TIME OR COST ADDED TO AN ESTIMATE BECAUSE THE ESTIMATOR DOES NOT HAVE ENOUGH INFORMATION
              1. 5. FORMULATE A RESERVE
                1. 6. MAKE ASSURE ASSUMPTIONS MADE DURING ETIMATING ARE RECORDED FOR LATER REVIEW
              2. 1. SHEDULE MANAGEMENT PLAN
                1. 2. ACTIVITY LIST
                  1. 3. ACTIVITY ATRIBUTESS
                    1. 4.ACTIVITY RESOURCES REQUIREMENTS
                      1. 5. RESOURCES CALENDARS
                        1. 6. PROJECT SCOPE STAMENTS
                          1. 7. RISK REGISTER
                            1. 8.RESOURCES BREAKDOWN
                              1. 9. ENTERRPRISE ENVIRONMENTAL FACTORS
                                1. 10. ORGANIZATIONAL PROCESS ASSETS
                                  1. 1. EXPERT JUDGMENTS. GUIDED BY HISTORICAL INFORMATION FROM SIMILAR PROJECTS
                                    1. 2. ANALOGOUS ESTIMATING. TO ESTIMATE COST OF AN ACTIVITY OF A PROJECT OF HISTORICAL DATA. USED WHEN THERE IS LIMITED INFORMATION. GENERALLY NOT AS ACCURATE AS OTHER ESTIMATING TECHIQUES
                                      1. 4. THREE POINT ESTIMATING. TRIANGULAR DISTRIBUTION AVERAGE (P+O+M)/3 P=PESSIMISTIC, O=OPTIMISTIC,M=MAS PROBABLE. TRIANGULAR DISTRIBUTION BETA (P+4M+O)/6 BETA ACTIVITY STANDARD DEVIATION =P-O/6
                                        1. 3.PARAMETRIC ESTIMATING. HISTORICAL RECORDS FROM PREVIOUS PROJECTS. USES AN STATISTICAL RELATIONSHIP BETWEEN HISTORICAL DATA AND OTHER VARIABLES
                                          1. 5. GROUP DECISION-MAKING TECNIQUES. USES BRAINSTORMING, AND DELPHI.
                                            1. 6. RESERVE ANALYSIS . TIMES RESERVES IN THE GLOBAL SCHEDULE F THE PROJECT.
                                              1. 1. ACTIVITY DURATION ESTIMATES
                                                1. 2. PROJECT DOCUMENTS UPDATES
                                                  Show full summary Hide full summary

                                                  Similar

                                                  The Rock Cycle
                                                  eimearkelly3
                                                  Biology Unit 1
                                                  hannahsanderson1
                                                  FCE Practice Quiz - B2
                                                  Christine Sang
                                                  Quick tips to improve your Exam Preparation
                                                  James Timpson
                                                  Summary of AS Psychology Unit 1 Memory
                                                  Asterisked
                                                  Edexcel Additional Science Biology Topic 2- Life Processes
                                                  hchen8nrd
                                                  Biology B1
                                                  Kelsey Phillips
                                                  Biology Unit 1a - GCSE - AQA
                                                  RosettaStoneDecoded
                                                  AN ECONOMIC OVERVIEW OF IRELAND AND THE WORLD 2015/16
                                                  John O'Driscoll
                                                  New GCSE history content
                                                  Sarah Egan
                                                  Repaso Revalida PR 2016
                                                  Rodrigo Lopez