Tolerate, treat, transfer and terminate

helen_woolford
Mind Map by , created over 6 years ago

A-Levels 4. Risk Response Mind Map on Tolerate, treat, transfer and terminate, created by helen_woolford on 05/22/2013.

1564
0
0
Tags
helen_woolford
Created by helen_woolford over 6 years ago
Enterprise Risk Management
helen_woolford
German- Intermediate
PatrickNoonan
Bayonet Charge flashcards
katiehumphrey
An Inspector Calls- Quotes
ae14bh12
MAPA MENTAL
blanca beatriz m
Control of selected hazard risks
helen_woolford
Risk control techniques
helen_woolford
Risk Appetite
helen_woolford
Insurance and risk transfer
helen_woolford
Chapter 4
helen_woolford
Tolerate, treat, transfer and terminate
1 The 4Ts of hazard management
1.1 Significant risks
1.2 Board level of risk
1.3 Risk Treatment
1.3.1 ISO 31000 BS31100
2 Tolerate risk
2.1 Comfortable zone
2.2 Legal or regulatory
2.3 Detective control
3 Treat risk
3.1 cost effective treatment
3.2 Inherent level
3.3 Corrective control
4 Transfer risk
4.1 Insurance
4.2 Joint ventures
4.3 Contractual agreement
4.4 Directive control
4.5 Risk financing
5 Terminate risk
5.1 Preventative controls
5.2 Unacceptable level of risk
5.3 Elimination may not be possible
5.4 Public sector
6 Project and Strategic responses
6.1 The 4As of project management
6.1.1 Contractual arrangements
6.1.2 contingency plans
6.1.3 Avoid high risks
6.2 The 4E of strategy
6.2.1 risk and reward
6.2.2 Joint ventures
6.2.3 Enter text here

Media attachments