Basic Costing Chapter 3,4,5
Content of the notes (1)
Page 1
Raw materials – the
materials bought by manufacturing organisations and used to manufacture the
finished products.
Work-in-progress – the
name given to partly-completed items in a manufacturing organisation.
Finished goods –
the items that have been manufactured and are ready for sale.
First in first out (FIFO) – a
method of inventory valuation that assumes that goods will be used up in order
that they are acquired (for valuation purposed only). This means that the remaining
balance will be valued based on the prices of more recent purchases.
Last in first out (LIFO) – this
method of inventory valuation assumes that the most recently acquired inventory
will be used first, leaving the earlier acquisitions to make up the value of
the remaining balance. This does not have to correspond with the actual order
of usage.
Average costs (AVCO) – this
inventory valuation method involves calculating a new weighted average cost of
goods each time that a new purchase is made, and using this valuation for
subsequent issues and balances until further purchases are made.
Manufacturing account – this
cost statement is produced at the end of a period to summarise costs under
various categories.
Direct materials –
this is calculated as the total of opening inventory of raw materials, plus
materials purchased, minus closing inventory of raw materials.
Prime cost –
the total of direct costs – in a manufacturing account it is calculated by
adding direct materials used in manufacture to direct labour.
Factory (manufacturing) cost –
a subtotal made up of the total if prime cost (direct materials and direct
labour) and manufacturing overheads.
Factory cost of goods manufactured – the
subtotal is the production costs of goods that have been completed and is made
up of factory (manufacturing) cot adjusted for inventories of work-in-progress.
Cost of goods sold – a
total based on the factory cost of goods manufactured which has been adjusted for
inventories of finished goods.
Chapter 3 Key terms
There are several methods of making labour payments.
These include time rate (including basic rates and overtime rates), time rates
with bonus systems, and piecework rates.
Labour costs can be classified and coded based on
the categories covered earlier in this book; these include cost and profit
centres, direct and indirect costs.
Labour costs can behave as fixed costs, variable
costs or semi-variable costs, depending on the method of payment.
Chapter 4 Summary
Time rate – the
method of remuneration when payment is on the basis of time spent at work; it can
be an hourly rate or based on a longer time period.
Basic rate – a
time rate that is applied to the normal contracted work time, and is usually an
hourly rate.
Overtime rate –
the rate (normally hourly) paid for time worked in excess of the normal
contracted time; it is usually at a higher rate than basic rate.
Piecework –
a payment system when the employee is paid for the work carried out (e.g. per
task or unit); this does not take any account of the time taken.
Bonus system –
a system used in conjunction with another payment method (for example time
rate, which provides additional payment for efficient working, e.g. production
that is more than a set level).
Chapter 4 Key terms
Managers at all levels
require information to enable them to make decisions, plan and control the
organisation. Costing information is an important part of the information that
they need.
Information requests
may need clarification so that the needs of the user are met when supplying the
information.
Comparisons of actual
data with budgeted figures make the actual data more useful for planning and
decision making. Differences between actual and budgeted data (called ‘variances’)
can be calculated in monetary and percentage terms, and significant differences
can be identified and actuated upon.
Reporting of variances
should be made to appropriate manager. This is normally the person who has
responsibility for the costs.
Chapter 5 Summary
Budget – a
financial planning document that is prepared in advance, and can be used to
help monitor and control costs.
Variances – the
difference between the actual data and the budgeted data.
Adverse variances –
these are ‘bad news’
·
In a performance
report when the actual income is lower than budget
·
In a performance
report when the actual cost is higher than budget
Favourable variances – these
are ‘good news’
·
In a performance
report when the actual cost is cost is lower than the budget
·
In a performance
report when the actual income is higher than budget
Significant variance – a
variance that is brought to the manager’s attention for further investigation
due to either its high monetary value or the high percentage of the variance
from the budget data.
Chapter 5 key terms
Basic Costing - Chapter 3
Basic Costing - Chapter 4
Basic Costing - Chapter 4
Basic Costing - Chapter 5
Basic Costing - Chapter 5
Information
- Description
- Accounts (Basic costing) Note on Basic Costing Chapter 3,4,5, created by tomfaulkner on 20/05/2013.
- Created by
- tomfaulkner
- Views
- 1,053
- Tags
- Rating