Alc 2

Enrique Gomez 10 perguntas

Fazer o quiz

Este quiz tem tempo limite, por isso abre no player de sempre.

Perguntas do quiz (10)

  1. 1The project team and their manager have been working hard to prepare the estimate for the new warehouse project. They have defined the scope of the project and are now working on the Work Breakdown Structure. The Work Breakdown Structure represents what on a project?
    1. Aa. The schedule
    2. Bb. The Decomposition of the task list
    3. Cc. The Decomposition of the work of the project
    4. Dd. The task list of the project
  2. 2Which of the following activities is part of product analysis?
    1. Aa. Value engineering
    2. Bb. Service analysis
    3. Cc. Brainstorming
    4. Dd. Creation of the scope baseline.
  3. 3Validate scope is closely related to:
    1. Aa. Control Quality
    2. Bb. Sequence Activities
    3. Cc. Manage Quality
    4. Dd. Time Management
  4. 4The Project Manager and her team have been working with the Sponsor over the last three weeks to determine what work is needed in the project and any work that is not as well. This is known as what?
    1. Aa. Control Scope
    2. Bb. Validate Scope
    3. Cc. Define Scope Correcta
    4. Dd. Plan Scope
  5. 5The trade show project team has just begun breaking down the pieces of the project into smaller easier to maintain and manage pieces. This is known as what??
    1. Aa. Define Scope
    2. Bb. Validate Scope
    3. Cc. Create WBS
    4. Dd. Plan Scope
  6. 6Which of the following activities is done FIRST?
    1. Aa. Collect requirements
    2. Bb. Creation of the Work Breakdown Structure
    3. Cc. Define activities
    4. Dd. Creation of the scope baseline.
  7. 7The project scope statement is the output of which of the following processes??
    1. Aa. WBS defining process
    2. Bb. Define Scope process
    3. Cc. Create WBS Incorrecta
    4. Dd. Project scope
  8. 8The WBS is the output of which of the following processes?
    1. Aa. Define WBS
    2. Bb. Create WBS Correcta
    3. Cc. Creating the project scope
    4. Dd. Project initiation
  9. 9Which of the following best describes a milestone used on a project??
    1. Aa. It has a duration of no more than one day.
    2. Bb. It has value in the Charter but not in the plan.
    3. Cc. It has a duration of zero (0). Correcta
    4. Dd. It is used to define the phase of a project.
  10. 10Which of the following best describes product analysis?
    1. Aa. Working with the customer to determine the product description
    2. Bb. Mathematically analyzing the quality desired for the project
    3. Cc. Gaining a better understanding of the product of the project in order to create the project scope statement Correcta
    4. Dd. Determining if the quality standard on the project can be met

Informações

Descrição
Alc 2
Idioma
Español
Visualizações
27
Etiquetas
alc 2avza
Avaliação
Ainda sem avaliações
Avalie este quiz
Avalie este quiz

Mais sobre Project Scope Management

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?