Ajude a dar forma ao GoConqr. O que a gente deve adicionar?

Quiz

Sem título

Caroline Dennehy 47 perguntas

Fazer o quiz

Perguntas do quiz (47)

  1. 1The two primary steps in preparing the control matrix include:
    1. Aspecifying control goals, identifying recommended control plans
    2. Bspecifying control plans, specifying input goals
    3. Cspecifying the control environment, identifying information process goals
    4. Dspecifying control procedures, identifying process goals
  2. 2The purpose of ____ control goals is to ensure the successful accomplishment of the goals set forth for the operations process under consideration.
    1. Aefficiency
    2. Beffectiveness
    3. Csecurity
    4. Dinput
  3. 3The purpose of ____ control goals is to ensure that all resources used throughout the business process are being employed in the most productive manner.
    1. Aefficiency
    2. Beffeftiveness
    3. Csecurity
    4. Dinput
  4. 4The purpose of ____ control goals is to ensure that entity resources are protected from loss, destruction, disclosure, copying, sale, or other misuse.
    1. Aefficiency
    2. Beffectiveness
    3. Csecurity
    4. Dinput
  5. 5entity resources that are always considered in efficiency assessments for an AIS are
    1. Acash and equipment
    2. Binventory and cash
    3. Cpeople and computers
    4. Dfixed assets and inventory
  6. 6Teh purpose of input control goals is to ensure
    1. Ainput validity, input completeness, and input accuracy
    2. Bupdate completeness and update accuracy
    3. Cboth a and b
    4. Dall of the above
  7. 7In a control matrix the coding P-1 means
    1. Aprocess 1
    2. Bprocess 1 is present
    3. Cprocess 1 is missing
    4. Dnone of the above
  8. 8In a control matrix, the coding M-1 means:

    1. Aa major control plan
    2. Ba missing control plan
    3. Cprocess 1 is missing
    4. Dnone of the above
  9. 9The most error-prone and inefficient steps in an operations or information process is:
    1. Areport generation
    2. Bmaster data update
    3. Cdata entry
    4. Dnone of the above
  10. 10The columns in a control matrix contain headings listing the business process:

    1. Acontrol goals
    2. Bcontrol plans
    3. Ccontrol environment
    4. Dcontrol procedures

Informações

Descrição
Quiz sobre Sem título, criado por Caroline Dennehy em 17-11-2015.
Idioma
English
Visualizações
0
Avaliação
Ainda sem avaliações
Avalie este quiz
Avalie este quiz

Fale Conosco

Sobre o que é sua mensagem?

O que a gente deve adicionar?