Chapter 4: Plans Theme

Lynsey Dalgleish Prince 2 Professional Inglês 3 slides

Slides do conjunto (3)

  1. Chapter 5: Plans Theme

    • 1. Project Plan
    • Top level plan
    • Project Manager creates during Initiating a Project
    • Describes the main products to be delivered and the activities and resources required to deliver
    • How project will be split into stages
    • At the end of each stage the Project Manager updates the plan - Managing a Stage Boundary
    • 2. Stage Plan
    • Project Manager creates & provides lower level of detail than the project plan
    • Allows Project Manager to track and control work done in the stages
    • Project Board reviews each stage plan (Directing a Project) when deciding to authorise the next stage
    • 2 processes where Project Manager creates a stage plan:
    • Starting up a Project: during Initiation Stage to show work that needs to be done to create the Project Initiation Documentation
    • Managing a Stage Boundary: All other stage plans created to show work for each delivery stage and updates during Controlling a Stage
    • 3. Team Plan
    • Used to forecast and track/control work being completed
    • Team Manager creates and updates team plan under Managing Product Delivery
    • 4. Exception Plan
    • How the project will recover from any breach in tolerances
    • Constraints: cost, time, quality, scope
    • Tolerance: acceptable level outside of constraints
  2. Planning Steps

    • 1. Design the Plan
    • Project Manager decides how to present the plans & estimating techniques
    • 2. Define and Analyse Products
    • Product based planning techniques used to identify all products that will be delivered
    • Project Manager tracks and monitors work completion - main output is Product Descriptions
    • Internal Dependencies: when one activity cannot start until another is finished
    • External Dependencies: when Project Management Team needs something from outside the project
    • 4. Prepare Estimates
    • Project Manager forecasts how long tasks will take, how much cost & resources required
    • Estimates changes as the project progresses
    • 5. Prepare the Schedules
    • Forecast dates, Project Manager considers resources & team availability
    • 6. Analyse the Risks
    • All plans have an element of risk, threats and opportunities are identified and dealt with
    • 7. Document the Plan
    • All outputs collated into a single plan and contains overall schedule and risks (known)
  3. Product Based Planning Techniques

    • 1. Write the Project Product Descriptions
    • Final outputs of project are documented using Project Product Description by the Project Manager (Starting up a Project)
    • 2. Create Product Breakdown Structure
    • Graphical tool that helps Project Management Team identify products that will be delivered
    • Can be hierarchical, mind map or list
    • 3. External Products
    • Identify 'external products' such as those that already exist or are being created outside the plan
    • 4. Write Product Descriptions
    • Product Description of specifications written for every product
    • Measurable characteristics - Quality Criteria
    • Project Manager creates and is used by Project Board to approve
    • 5. Create Product Flow Diagram
    • Order in which products will be created
    • Project Manager identifies dependencies

Informações

Descrição
Professional Prince 2 (Prince 2 Study Cards) Slides sobre Chapter 4: Plans Theme, criado por Lynsey Dalgleish em 03-07-2016.
Visualizações
9
Avaliação

Mais sobre PRINCE2 Themes

Fale Conosco

Sobre o que é sua mensagem?

O que a gente deve adicionar?