Flashcards
Team Roles
Flashcards do conjunto (8)
- 1Who is on the project team?Project manager
Systems analyst
Systems designer
Programmer
Tester - 2The project manager is responsible for only part of the team?No, they are responsible for everyone.
- 3The system analyst is responsible for the .......... and ......... stageInvestigation and analyst
- 4The system designer must follow the .....................................Requirement specification
- 5What is a general task of the systems designerCreating a test plan.
Creating the design specification.
Choosing the hardware and software to be used.
Co-operating with clients for feedback.
Co-operating with the programmer before and during the developing stage. - 6The ......... are responsible for the implementation/developer stageProgrammer
- 7What are the three stages for the test plan1.Selecting test data,
2. Creating black box testing
3. Creating white box testing - 8The aim of the tester is to find errors?Yes
Informações
- Descrição
- FlashCards sobre Team Roles, criado por Izzy R em 29-06-2016.
- Criado por
- Izzy R
- Visualizações
- 1
- Avaliação