Standard costing - Variable & Fixed Overhead Variances.
Flashcards do conjunto (7)
- 1Variable Overhead Expenditure Variancestandard variable overhead cost for actual hours used
-
actual variable overhead cost incurred - 2Variable Overhead Efficiency Variancestandard hours for actual production at standard variable overhead rate
-
variable hours used at standard variable overhead rate - 3Fixed Overhead Expenditure VarianceBudgeted fixed overhead for period
-
Actual fixed overhead for period - 4Planned Fixed Overhead AbsorptionBudgeted cost of fixed overheads
=
budgeted output x absorption rate - 5Fixed Overhead Volume Variance (units)Actual output x absorption rate
-
Budgeted output x absorption rate - 6Fixed Overhead Volume Variance (hours)Standard hours for actual output x absorption rate
-
Standard hours for budgeted output x absorption rate - 7—
Informações
- Descrição
- FlashCards sobre Standard costing - Variable & Fixed Overhead Variances., criado por sinead mccarthy-mason em 17-01-2022.
- Criado por
- sinead mccarthy-mason
- Visualizações
- 30
- Avaliação
Mais sobre Standard Costing and Variance Analysis