Flashcards
V1 Unit 2 URE's
Flashcards do conjunto (32)
- 1What organization is responsible for submitting, controlling, and monitoring difficulty report?AFMC SCM-R Quality Assurance Activity
- 2Which difficulty report (DIREP) category code is assigned when problems include system loops, lost audit trails, and incorrect accountable record updating?I
- 3Which difficulty report (DIREP) category code is assigned when problem stops the computer from processing input, but it does not cause looping or destroy accountable records?II
- 4A category III difficulty report (DIREP) does not stop processing and is correctedin the next scheduled release
- 5Which difficulty report (DIREP) category code is assigned when there are misspelled words and other minor program deficiencies?IV
- 6Where do you start your research before you conduct a surveillance visit of a function?Directives that apply to the function
- 7Which is a basic ground rule for conducting a surveillance visit to an accountable office function?Check in and out with the flight chief
- 8A function that receives a surveillance visit report must send a reply within how many days of the date on the surveillance report?15
- 9What organization is the primary point of contact for special topics designated by the materiel management officer or logistics readiness squadron (LRS) commander?Quality assurance
- 10An effective analysis program must be based onorganizational objectives
- 11What type of analysis identifies favorable or unfavorable deviations when compared to established factors, standards, and norms?Trend
- 12What item(s) are needed by quality assurance to perform an analysis?Statistics and source documents
- 13Which is a common material management indicator?Warehouse refusal
- 14In addition to management reports, what other sources of information can help in identifying problems when gathering data after the management indicators have been selected?Training reports
- 15What are the keys to deficiency identification?Analysis and special analysis program
- 16Who will be held liable for the loss, damage, or destruction of government property caused by negligence, willful misconduct, or deliberate unauthorized use?All Air Force members and employees
- 17Within how many hours must the receiving activity submit a supply discrepancy report for a shortage of a controlled item?24
- 18Where are all supply discrepancy report (SDR) suspense copies kept?Customer support
- 19How many days after the first follow-up is a second follow-up sent to an action activity that has not replied to a supply discrepancy report (SDR)?45
- 20How many days after the initial submission of the supply discrepancy report (SDR) will the discrepancy details appear on the SDR listing?55 to 109
- 21What system prepares supply data reports for off-base distribution?Automated Data Reports Submission System (ADRSS)
- 22Storing all supply interface system (SIFS) images for the purpose of backup into a local user file is a duplication of effort and an abuse of system resources becauseSIFS has built-in recovery and contingency procedures
- 23Which type of Supply Interface System (SIFS) files are designed to ensure any inbound or outbound images that could not be identified or dispatched are cleared in a timely manner?Residue
- 24Who must review the residue portion of the Supply Interface System end-of-day report to ensure users clear residue images in a timely manner?Functional systems management section
- 25Edits made to the NARRATIVE file willcorrupt it
- 26What is the term used to define the steps a base takes when the materiel management system is temporarily inoperative or when other circumstances impose significant limitations on normal processing capabilities?Degraded operation
- 27How often are supply inventories completed?Once per fiscal year
- 28What do deployed kit personnel rely on to prevent confusion and maintain normal operations?R43 list accuracy
- 29Which program in the Materiel Management System takes control of computer processing when an error is detected during processing of a transaction?Reject
- 30What supply management listing reflects all accountable rejects and the number of times reprocessing was attempted for each reject?D818
- 31Who may force-delete rejects using the reject processor program?Reject monitors
- 32What supply management listing shows all rejects that have been cleared?D20
Informações
- Descrição
- CDC 7 LVL V1 FlashCards sobre V1 Unit 2 URE's, criado por itaylorncoa em 16-01-2016.
- Criado por
- itaylorncoa · jan 2016
- Atualizado
- 19 fev 2016
- Visualizações
- 0
- Avaliação
Mais sobre Logistics, Distribution and Warehousing