ENVS2006

Pippa Holman Inglês 191 flashcards

What is the EIA process? (NB consideration of alternatives should be included in proposal identification and subsequent…

Flashcards do conjunto (191)

  1. 1What is the challenge for the UK for environmental policy?- Pressure for new development to support a greener and more sustainable economy and improve society
    e.g. 1. at least £110 bn invested by 2020 in new energy infrastructure to support transition to a low carbon economy
    2. £20bn over next 5 years to maintain/ improve water supply
    3. £15bn by 2020 to divert waste from landfill and generate energy from waste
    4. Spending on flood defences to double to £1bn by 2035 to maintain current risk level
    5. UK pop to rise from 61mn to 72mn by 2033 - more demand on homes and transport infrastructure
  2. 2What is the importance of fracking in relation to EIAs?- Benefits should outweigh the costs for environmental impacts
    - Fracking means we may not be able to meet Kyoto carbon targets
    - Short term rather than long term sustainability
    - Pressure groups try to stop developments (also seen in HS2 - backlash from Oxford professors)
  3. 3What has been the pressures towards HS2 development?- Many groups oppose it
    - 50 accent woodlands thought to be 'under threat'
  4. 4What is the definition of EIA?1. An assessment of a planned activity on the environment - UN Economic Commission for Europe (1991)
    2. A technique and a process by which information about the environmental effects of a project is collected, both by the developer and from other sources, and taken into account by the planning authority in forming their judgements on whether the development should go ahead - UK department of environment (1989)
  5. 5What is the UKs take on EIA?- Over 10,000 projects subject to EIA in the UK
    - Almost every country in the world has an EIA system
    - UK system derived from EU system - most global systems are similar
  6. 6What is the Great Barrier Reef Dredging case study?Gladstone, OZ
    - Dredging in the harbour sees metals dissolved in the mud having a potential effect in the ecosystem
    - Biologists suggest its only turbidity
    - Dredged material to reclaim 200ha.
    - Bouys and sonar constantly monitor water quality
    - The Cu concentration in the water hasn't breached Oz water quality targets (like 10 years ago hadn't either)
    - There is natural and legacy pollutants in marine and riverine environments
    - Loss and change of habitat needs habitat surveys and knowledge of how important it is (rare habitat/ changing currents)
    - Changing tidal areas could increase flood risks
  7. 7What is the definition of sustainable development?'Meeting the needs of the present without compromising the ability of future generations to meet their own needs'
    (Resolution 42/187 of the UN general assembly)
    NB. Has only come into the spotlight in last 20/30 years
  8. 8What are the 5 'guiding principles' of sustainable development that EIA maps onto?1. Living within the planet's environmental limits
    2. Ensuring a strong, healthy and just society
    3. Achieving a sustainable economy
    4. Promoting good governance
    5. Using sound science responsibly
    (UK sustainability development strategy - 'Securing the Future')
  9. 9What was the definition given to EIA by the UK ' EIA: guide to procedures' document?EIA is a procedure that must be followed for certain types of project before they can be given 'development consent'
    The procedure draws together, in a systematic way, an assessment of a project's significant environmental effects
    It helps to ensure importance of the predicted effect and scope for reducing them are properly understood by the public and the relevant competent authority before it makes its decision
  10. 10What are the key points to the EIA description?1. PROCEDURE - Systematic from early project planning to planning authority decision and beyond (developer to design to decision to life of project)
    2. PROJECT - The sort of project is set out in legislation (screening used to decide whether EIA is needed)
    3. ENVIRONMENTAL EFFECTS - What is the environment - scoping used to show where to focus
    4. SIGNIFICANCE - How is this decided on, the science being qualitative and quantitative
  11. 11What is the EIA process? (NB consideration of alternatives should be included in proposal identification and subsequent stages)What is the EIA process? (NB consideration of alternatives should be included in proposal identification and subsequent stages)
  12. 12What are the 5 key stages of EIA?1. Screening
    2. Scoping
    3. Preparing an Environmental Statement
    4. Application and consultation
    5. Decision making
  13. 13What is meant by screening?*Determining whether a proposed project needs EIA
    *Whether it falls within the remit of the legislation
    *Whether it is likely to have a significant effect on the environment - will then need EIA.
  14. 14What is meant by scoping?*Determining the extent of issues to be considered in the assessment
    *The applicant can ask the local planning authority for their opinion on what information needs to be included ('scoping opinion')
    *Need to work out which parts of the environment would be affected
  15. 15What is meant by preparing an environmental statement?*Where EIA is required, the applicant must compile information to assess the likely significant environmental effects of the development
    *Public authorities must make available any relevant environmental information in their possession
    *Mitigation of significant effects must be proposed
    *Alternatives must be considered (design and location)
  16. 16What is the Environmental Statement/ Environmental Report?- EIA based on technical reports typically around 300 pages each
    - Executive summary is based on the EIA (still around 300 pages)
    - Looking at real world ones can give case studies
  17. 17What are the component parts of the environment?The main environmental issues (and can interlink) needed to be thought of;
    1. Population
    2. Flora/ fauna
    3. Soil
    4. Water
    5. Air
    6. Climate
    7. Material assets (architectural and archeological heritage and socio economic)
    8. Landscape
    (These can vary from project to project)
  18. 18What is meant by application and consultation?*Where the findings of the EIA are compiled into an ES (with requirements for consultation and the public/ government agencies
    *This is then submitted as part of the planning application
    *The government and public are then given the right to comment
  19. 19What is the decision making stage?- Environmental Statement and associated documents are considered by a decision making body either,
    1. The LPA
    2. Larger projects may go to the national planning inspectorate (decision taken away from LPA - for projects of national importance) and made available for stakeholders to comment on before the decision is made
    3. For the largest projects, consent may be given by Act of Parliament, sometimes following a public enquiry (Hinkley Point/ HS2) and evidence is given to an inspector
  20. 20What is the role of the developer, the consultants, the LPA, statuary consulates, the government and the court?1. DEVELOPER - Must produce the EIA
    2. CONSULTANT - Work for the developer (cost from £30,000 - £1mn+)
    3. LPA/ INSPECTORATE - Give opinions on screening, scoping and the decision on pp
    4. STATUTORY CONSULTEES - give advice at each stage, share publicly available data
    5. GOVERNMENT - can 'call in' major developments to parliament - give public enquiry
    6. COURTS - (domestic and EU) decide in cases of appeal on legal and procedural grounds
  21. 21What has been the general history of EIA?1. Grassroots
    2. Pressure groups- FOE/ greenpeace in the 1960s
    3. From government - sophistication of industry showed issues in the environment/ concern for the growth of nuclear. Acid rain and air pollution an issue
    - UN Stockholm 1972 - first major environmental conference
    - Brundtland report 1987 - sustainable development first defined
    - UNCED Rio 1992 - international convention of biodiversity. EIA first endorsed as something that does help meet sustainable development
  22. 22What was the UKs approach to EIA?- UK has had a sophisticated planning system (world leaders) since the 1947 Town and Country Planning Act. It was used in the redevelopment of cities and to regulate sprawl and restructure industry
    - There was little provision for dealing with large projects (usually dealt by the Secretary of State via public enquiry)
    - EIA was informal only - no systematic scrutiny
    - In the 1960s, environmental and industry growth and planning couldn't keep up
  23. 23What was the US's approach to EIA?- In 1969, the National Environmental Policy Act was passed
    - USA had high pressures, a lot form the hippy movement
    - Even though Nixon wasn't particularly concerned with the environment, the act was used to show willing (and keep people quiet)
    - A major turn from cost/ benefit to making sure the environment is given a large weighting
  24. 24What did NEPA require federal agencies to do?- Use a 'systematic and interdisciplinary approach'
    - Develop procedures and methods so that unqualified environmental amenities and values are given appropriate consideration, along with traditional economic and technical considerations
    - Include a detailed statement on
    1. The environmental impacts of proposals
    2. Any adverse environmental effects
    3. Alternatives
    4. Irreversible commitments of resources (big part of sustainable development)
  25. 25What was the procedure for NEPA?1. Screening - is an EIA needed?
    2. Scoping - what are the key impacts?
    3. Environmental statement
    4. Non- technical summary
    5. Public consultation at all stages
    (All this is carried out by government agencies)
  26. 26What was the Westway, NY case study?- About NEPA and the courts
    *NYC proposed a West Side Highway (6 lanes, mainly below ground), including landfill on banks of Hudson River, road, parks and real estate development
    * ¢1.3 bn committed by Federal Gov
    *Approval was given at all levels, but the 1980 initial approval was delayed by air quality issues (CO and particulates in tunnels)
    *Obstacles overturned by courts despite objections from NGOs and EPA
    *Then in May 1984, Army corps of engineers EIA showed there would be 'significant adverse impacts on the rare striped bass'
    *The term 'significant' carried legal weighting and court hearings ruled authorities had failed to comply with clean water act and NEPA
    *Project was dropped - first time environment beat development
    *Environment had stronger protection than those that created NEPA may have thought
  27. 27What was happening at the time of NEPA in the UK?1947 - Town and Country planning act
    1960s - cost benefit approach to decisions
    1970s - North Sea oil and gas= first UK EIAs - done voluntarily by companies (show willing, good for reputation and operation)
    1976 - Government report to recommend incorporating EIA into existing system, but response was minimalist and grudging
    Early 1980s - 200+ EIAs prepared (on ad hoc basis) - many were deficient
  28. 28What happened in Europe that became a turning point for EIA?*1985 directive 85/337 from the '1st Action Programme on the Environment', aiming to prevent pollution or nuisance at the source and take into account the environmental effects and the 'earliest possible stage in planning and decision making'
    *Aimed to make sure all countries had the same policy and prevent long distance pollution (transnational acid rain as seen in UK power stations causing issues for German forests)
  29. 29How did the 1988 EU directive 85/337 become implemented into UK planning regulations and what was its issues?- Given 3 years to implement from document being drawn
    - EIA is produced by the developer, which gave issues in cost reduction
    - Screening was confusing and subjective
    - Scoping reports not mandatory in UK or Spain
    - Alternative proposals weren't necessary
    - Some omissions by individual countries (Nuclear power in UK)
    - UK called it EA (word impact apparently put developers off)
  30. 30What was the issue with the initial EIA in the UK?- In the 1990s, there were up to 300 EIAs a year
    - There was limited public consultation
    - Local authorities were under qualified - a new and complex system brought from the outside (no qualifications or professional body at the time)
    - Many EISs unsatisfactory, but improving
    - Poor quality statements led to delays, many flawed and not good enough, so planning refused and all gone through again
  31. 31What was the levels of dissatisfaction of statements in the first roll out of the directive?- A system between A and F was created - A was wholly satisfactory reports, compiling with all policies, F totally inadequate
    - A-C was then confirmed as satisfactory, D-F unsatisfactory (accounted for 45% in first few years)
    - Most countries became better at getting the reports to reach a satisfactory rating over the next years
  32. 32What was the revised direct of 1997?- Came into force in the UK in 1999
    1. Changes to screening
    2. Scoping introduced
    3. Trans-boundary effects
    4. Alternatives
    5. Decision making
    - Many of the reports were then considered satisfactory
    - There was also a directive on strategic EIA
    - Directive has a 'wide scope and broad purpose' - even if type of development is not expressly mentioned, (housing estate) it could come under others (urban development) - scope and purpose of the project is more important than its label
  33. 33What has happened in the UK for the EIA regulations in recent years?- UK planning laws were streamlined (2011- 2012)
    - 2014 saw another revised EU directive - should be coming into force 2017, changes will be happening (Brexit may mean things change again soon..!)
    - 2004 study showed planning authorities had limited practical experience of EIA and Oxford Brookes suggested 10% of LPA may never had undertaken screening to determine whether a proposed development required EIA, and 50% have limited experience
  34. 34What were the 2 schedules used from 1988 to help with screening?- Schedules are just lists
    1. Developments have compulsory EIA (oil refineries/ integrated chemical installations/ large power stations/ large airports and harbours)
    2. EIA may be required (extractive industries/ smaller power stations/ food processing works/ smaller livestock plants/ holiday villages)
    - The system was clear for schedule 1 developments, but confusion arose for LPAs for schedule 2 developments
  35. 35What is schedule 1?EIA is compulsory
    - 23 categories in total, including waste, transport, energy, heavy industry (chemical works/ cement works)
    - Usually scale dependent- typically size and height etc
  36. 36What are the examples of schedule one developments?1. CRUDE OIL REFINERIES - installations for the gasification and liquefaction of 500 tonnes or more of coal or bituminous shale per day
    2. THERMAL POWER STATIONS - (or other combustion installations) with a heat output of 300 MW or more
    3. NUCLEAR POWER STATIONS - except research installations for production/ conversion of fissionable and fertile materials whose power doesn't exceed 1 kilowatt continuous thermal load
    4. INLAND WATERWAYS AND PORTS - permitting passage of vehicles over 1,350 tonnes
    5. TRADING PORTS - taking vessels over 1,350 tonnes
    6. INTENSIVE REARING OF POULTRY/ PIGS - with more than 60,000 hens/ 3,000 places for pig production/ 900 places for sows
  37. 37What is schedule 2?- EIA is not compulsory - decision is made by LPA or Secretary of State - a request for a screening option accompanied by
    1. A plan sufficient to identify the land
    2. Brief description of the nature and purpose of the development and its possible effects on the environment
    3. Other such information or representations as the person making the request may wish to provide or make
    - Decision from LPA is required within 3 weeks
    - A 'screening direction' from SoS can be requested if deadline not met or is the developer thinks a requirement for EIA is not correct
  38. 38What is the content of schedule 2?- 13 categories, all with lengthy subcategories including agriculture, extractive industry, energy, infrastructure, tourism and leisure
    - Some omissions (hospitals/ shopping malls/ education/ defence activities and list isn't exhaustive
    - Uses thresholds (which has been seen to lead to 'salami slicing' developments (completing in parts for one large project)
    - Decision is discretionary and with guidance
  39. 39What is the guidance for screening criteria?*Initially there was 3 general criteria
    1. Size - whether a project was of more than local importance in terms of scale
    2. Location - Whether it was intended for a particularly sensitive area (SSI/ NP)
    3. Nature - Whether it will give rise to complex or adverse effects (pollution)
    This is subjective or difficult to asses without the information an EIA would provide - in the early years problems worse from lack of EIA experience in LPA
    **Screening was made clearer by 'processes and outputs' and 'thresholds' that were developed for each type of schedule 2 development
  40. 40What are processes and outputs in screening?*Significant effects were likely if:
    - 'Scheduled processes' will be operating (for purpose of air pollution control)
    - Discharges to water that require consent
    - If theres presence of 'environmentally significant quantities of potentially hazardous or polluting substances'
    - Producing radioactive or other hazardous waste
    - If development falls under the COMAH directive 96/82/EC (control of major accident hazards) involving dangerous substances
  41. 41What are the thresholds in screening?1. Applicable Threshold - triggers examination if EIA is needed
    2. Criteria - helps decision makers if applicable threshold is exceeded
    *These remain both subjective and open to discretion: the LPA must still decide whether it is likely to have significant environmental effects before any formal assessment
  42. 42What are examples of thresholds?1. AIRPORTS - applicable threshold: runway extensions or works exceeding 1ha
    Criteria: main impacts to be considered in judging significance - noise/ traffic/ emissions. New airports will usually require EIA
    2. MOTORWAY SERVICE AREAS - Applicable threshold: works exceeding 0.5ha
    Criteria - impacts likely to be significant - traffic/ noise/ air quality/ ecology and visual impact. EIA likely to be required for previously undeveloped sites and for areas over 5ha
  43. 43What is meant by scoping?- All about what to include in the EIA
    - 'Determining all of the projects possible impacts and all the alternatives that could be addressed, especially significant ones
  44. 44What did the 1988 regulations say of scoping?They did not require a formal scoping process in the UK
    This was in spite of the fact scoping was widely held to be a vital stage in the EIA process
  45. 45What are the advantages of scoping?1. Consultation at an early stage saves time and money
    2. Can involve all stakeholder groups from the start - can share ideas (if bird people say area is the only habitat in country, can change/abandon the project at an early stage
    3. Deals with the key impacts that will be addressed in the main EIA
    4. Target resources
    5. Opportunities to change the project at an early stage
  46. 46What is the history of scoping?1. Originally wasn't compulsory
    2. 1999 updated regs allowed developers to requests formal (scoping) opinion on what needed including in the ES from the LPA or secretary of state
  47. 47What is the LPA's role within scoping?- LPA formally required to consult with statutory consulates before giving their opinion within 5 weeks
    - Developers provide a 'scoping report' for the LPA to consider and they create a 'scoping opinion' back to the developer
    - Have to take into account the 'scoping requirements' - 1. Specific characteristics of the development (location)
    2. Specific characteristics of development type concerned (specific to actual project)
    3. Environmental features likely to be affected by the development
  48. 48What are the figures used to show whether the change to making scoping part of the process made a difference?- 50% of projects now involve a formal scoping opinion
    - 18% involve an informal discussion
    - 32% have no scoping stage
    - 62% of developers request a scoping opinion submit a scoping report for consideration by the
    - 48% of LPAs manage to meet the 5 week deadline, can be a tight turn around, especially if statutory consulates are slow to respond (takes about 3 days)
    - 67% of LPAs think the quality of EIA is improved with scoping as creates early opinion and discussion
  49. 49What is the Bournemouth case study for scoping?Primetower Properties (Bournemouth)
    - A brownfield development for residential
    - Scoping involved English nature and 2 wildlife NGOs (statutory consulates)
    - Area surrounding is heathland has rare reptiles inc. sand lizards protected by national and international law
    - Issues regarding the reptiles on and offsite were raised
    - People who would live on the site had to be considered (families may have bikes or accidental fires and pets (cats) that may cause issues in the food chain)
    - Project redesigned at the early stage (to business and office space) which wouldn't have major off site impacts
    - An 18 month delay, but resolved major issues and permission granted (could have got much further and been rejected)
  50. 50What main changes (other than including scoping) were there to the original directive?1. Trans - boundary effects: Member states had to consult with others if impacts would have an effect on them
    2. Alternatives - Have to be considered and reasons for the choices made given
    3. Reasons for decision - Decision letters to be made public for reasons on approval/ refusal (LPA/ SoS)
    4. Process now known as EIA...!
  51. 51What were the changes to EIA in 2011/ 2014?2011
    - Mainly consolidating minor changes since 1997
    - Some additions to schedules 1 and 2 (e.g. including carbon capture
    - Right of 3rd party appeal on screening decisions
    2014
    *Implemented 2017
    *Changes to simplify the process (inc. screening), to raise the quality and make EIA more accountable
    *Improvements to monitoring of significant effects and mitigation
    *Environmental statements renamed EIA reports (changes in terminology)
  52. 52What is the structure of Environmental Statements like?- Content of Environmental Statements is set out in the UK regulations (part 2 of Schedule 4)
    1. Area - general description and some baseline data (what are the limits of the proposal and its impacts?)
    2. Need for the development (why is it required? Inc. gov. policy drivers)
    3. The proposals (with explicit detail) - could include maximum and minimum boundaries
    4. An outline of the main alternatives and mitigation measures
    5. Identifying the policy context
    6. Impacts
    7. Monitoring - can be required as a 'planning condition' and supported by an 'Environmental Management Plan'
    + glossary/ abbreviations/ bibligraphy/ references
    8. Non- technical summary - easy to read and understand for the public
  53. 53What is meant by the 'Rochdale Envelope?'A case study...
    *Where the proposal part of the Environmental Statement wasn't set out well - outline plans were insufficient
    *EIA for industrial unit on the plan (buildings/ construction/ road networks), not for who'd lease the buildings and the impacts they'd create)
    *Environmental effects weren't clearly laid out - level of detail needed for the proposals such that a proper assessment of likely environmental effects and necessary mitigation is covered
  54. 54What is meant by the consultation process?- Who did you talk to?
    - Did this have a role in the scoping process?
    - Consultation is an iterative process under the Planning Act 2008 and places a duty upon developers to engage meaningfully with
    1. Affected communities
    2. Local authorities
    3. Other statutory consultees over their proposals at pre- application stage
    - Consultation can have many stages that go back an alter the project and cycle round
  55. 55What is meant as the Statement of Community Consultation as part of the consultation process?- Developer must produce and publicise a Statement of Community Consultation
    - In preparing this, they must consult and have to regard the views of any relevant local authority on the context of the statement
    - LPAcan approve whether there has been enough community consultation
  56. 56What are the typical contents of each section for setting out the different impacts?1. Introduction to the area
    2. Importance and designations
    3. Scoping findings
    4. Methodologies
    5. Baseline data
    6. Impact prediction
    7. Suggested mitigation (brings impacts down to a level of insignificance
  57. 57What has been the change in how EISs have been documented?1980s - EISs poorly put together, mixed documentation
    1990 - early 2000s - Professionally produced, often a single volume, available free or at a nominal charge
    2006 onwards - All documents online via LPA planning websites and paper copies only by request at a large cost (£200+)
    2014 (new directive) - All documents online across the EU (available to all... older generation?)
  58. 58What is meant by 'baseline data'?How sensitive is the area?
    Making predictions constructing the past
    - E.g. if there is a change in the baseline number of birds in an area even long after construction finishes, there may be a major issue with the project
    - The difference between short term and long term changes have to be judged for significance
  59. 59How is baseline data collected?- Looks at selected parameters (human beings, flora, fauna, soil, water, air, climate, material assets and cultural heritage by;
    - Collecting existing information (desk study and consultation)
    - Gather existing additional information by survey work
  60. 60What are the aims of baseline data?1. Assess the value of the baseline environment (regional or national importance)
    2. Provide data to predict changes to receptors which the development may cause
    3. Provide a baseline for future monitoring
  61. 61What is the general model for gather ing baseline data?1. Draw up limits to area
    (of development and of potential impacts)
    2. Desk study
    3. Field work - phase 1 and then phase 2&3
  62. 62What can be considered limits to environmental impacts?1. The site
    2. The immediate locality (impacts going beyond the site e.g. noise)
    3. Wider effects (national, international and global) (consideration of things going beyond the scope of the project - tourism etc.)
    (The 3 phases (construction/ operation and decommission) should be assessed)
  63. 63How can a major airport extension have local, national and international issues?The site itself: has land take and therefore conservation impacts and hydrology (lots of concrete increases run off and production of it is carbon intensive)
    LOCALLY - Road improvements, employment, noise (local and on flight paths)
    NATIONALLY - Status of impacted conservation areas, economy, local and national effects
    INTERNATIONALLY - Greenhouse emissions, trade benefits and tourism impacts
  64. 64What is the case study for Heathrow T5?- Planning processes cost £63mn over 14 years, including 46 month public enquiry
    - £4.2bn construction costs
    HOWEVER, there was a need for development....
    *Failure to build would cost the UK £600mn in exports
    *Larger planes need bigger infrastructure and modern planes can reduce air and noise pollution while still increasing passenger numbers (Airbus 380 = 555)
  65. 65What were the issues for the Heathrow T5 construction phase?- Construction took 6 years (2002 - 2008) for phase 1, with a further phase in 2011
    - 60 contractor workforce created noise, traffic, dust, security, land take, hydrological issues, wider infrastructure (road and rail links/ car parks), radar disturbance (SATNAVs!), use of resources and cultural heritage issues
  66. 66What were the issues for the Heathrow T5 operation phase?- Traffic - 28.1mn expected to travel by car, 11.9 by taxi in 2016
    - Noise (traffic and planes)
    - Air pollution (Heathrow contributing to poor air quality in London)
    - Run off
    - Economy had more jobs and services
    - Global impacts (climate change and trade)
  67. 67What are the issues associated with the channel tunnel?- The site itself is a major land take
    - Locally there is difficulty in finding an acceptable route (through Kent and London)
    - Nationally, there is short term increases in road traffic and long term potential shift to freight on rail
    - Internationally there could be improved trade with EU, but national security and health risks (stray dogs and migrants walking down it)
  68. 68What were the issues with the IKEA store for Southampton?- Land take is of limited importance, a brownfield site in an urban area (4 storey building) 600 seat restaurant, 891 space car park opposite leisure world
    - There were impacts for the immediate area and some for beyond
  69. 69What are the impacts in the immediate and area and beyond for IKEA?IMMEDIATE -
    1. Construction - noise, dust, odours, traffic, infrastructure, landscape and heritage
    2. Operation - traffic (15% increase predicted, junctions improved as a mitigation), council suggesting for bus links, landscape and heritage issues and potential economic impacts on other local businesses (John Lewis objected)
    BEYOND IMMEDIATE AREA:
    - Traffic (cruise ships unloading also lead to huge increases in traffic), in operation as far as regional motorways and interactions with docks operations and events (economic benefits (£55mn per annum turnover predicted and 500 jobs locally) business across the region could be impacted
  70. 70Who can be contacted for desk study materials in baseline assessments?1. STATUTORY CONSULTEES - Natural England/ EA (for water and air quality)/ Local authority/ Highways/ Marine Management Organisation (developments of the coastal zone/ offshore projects)
    - Not obliged to collect the data for the developer, but release what they have
    2. NON STATUTORY CONSULTEES - RSPB/ National Trust/ Local Chamber of Commerce, business groups, public that use area (cyclists etc.)
    - Not obliged to give the data, can charge for its release
  71. 71What sources of data could be used for desk study?1. Census
    2. Population records
    3. Employment data
    4. Habitat maps and databases (National Biodiversity Network, Hampshire Biodiversity Information Centre)
    5. Schedule of Ancient Monuments
    6. Other surveys, reports and environmental statements
  72. 72What is the importance of field data collection and use?- Filling in the gaps and checking existing data
    - Needs an APPROPRIATE DESIGN for data collection e.g. rocky shore = random stratified or random?/ social survey - user groups?
    - APPROPRIATE MEASUREMENTS - water quality - physical vs. chemical vs. biological
    - Physical- turbidity, sediment loads, flows and waves
    - Chemical measurements - dissolved oxygen, pH, salinity, pollutant concentrations
    - Biological indicators - water quality indicies or indicator species (habitat surveys have to be done at appropriate times, migratory birds may need years of data to establish a baseline
    - Number of samples taken a trade off between resources and quality
    - Detail has to be based on scoping and initial findings
    -e.g. Phase 1 - ecology habitat mapping, Phase 2 - species lists, Phase 3 - counts of individual organisms
  73. 73How should significant effects be assessed?- EIA must include description of likely significant effects
    - Direct and indirect effect to be covered and any indirect, secondary, cumulative, short, medium and long term, permanent and temporary, positive and negative effects of the development from;
    1. Existence of development
    2. Use of natural resources
    3. Emission of pollutants, creation of nuisances and elimination of waste
    - Reporting this should include the forecasting methods used to assess the effects on the environment and mitigation measures to include
  74. 74Why is there such a challenge for determining significance and what is meant by significance?*Many different methods for predicting environmental impacts, as not standardised (1984 Netherlands report identified 150 different methods alone)
    * Significance defined as an effect there the predicted net impact of the activity will not exceed normal variation in baseline conditions (this doesn't by itself indicate the importance of an impact)
  75. 75What are the different approaches to assessing significance?1. Use of matrices, multi- criteria analysis
    2. Cost - benefit analysis (economics)
    3. Standardised generic levels of significance specific to each impact (or for all all together...)
    3. Measurements against benchmarks, guidelines or standards (noise measures in decibels and compared to accepted levels)
    4. Ad hoc methods (characterising significance with qualitative text or in tables, including expert views)
  76. 76How is significance established?** It is a difficult and subjective task **
    e.g. Dibden Bay measures of significance were based on the sensitivity of the receiving environment, the magnitude of the impact, the extent of the impact and the timescale of the impact
  77. 77Why is ecology of importance and how is it's significance calculated?- The conservation status of the site (locally/ nationally and internationally designated)
    - The presence of valued, protected or rare species
  78. 78Why is air quality of importance and how is it's significance calculated?- Predicted pollutant levels are relative to certain levels...
    *Air Quality Regulations 2000 (for Nix, SO2 and particulates) areas already near the guidelines may be pushed further into issues by the developer
    *Additional reference comes from other guidelines (WHO - more stringent cut offs than British)
    *Some pollutants, (dust and odours) have no forma regulations or standards
  79. 79How is significance a function of impact magnitude and importance/ sensitivity?How is significance a function of impact magnitude and importance/ sensitivity?
  80. 80What might the Western Australia EPA have to regard as to determining whether there is significant effects?*Decision has to be made using professional judgement, gained through knowledge and experience in the application of EIA...
    1. Values, sensitivity and quality of the environment likely to be impacted
    2. Extent (intensity/ duration/ magnitude/ geographic footprint) of the likely impacts
    3. Consequence of the impacts
    4. Resilience of the environment to cope with change
    5. Cumulative impact with other projects
    6. Level of confidence in predicted impacts
    7. Objects of the Act, policies, guidelines, procedures and standards the proposal can be assessed against
    8. Public concern
    9. Presence of strategic planning policy framework or the extent other statutory decision making processes meet the EPA's objectives and principles for EIA
  81. 81What is meant by the significance spectrum?What is meant by the significance spectrum?
  82. 82What did the Briggs and Hudson (2012) report into improvements of the determination of significance in Ecological impact assessments find?- Evaluated 30 ES's from three time periods (pre-1999, 2001-2005 and 2007-2011)
    - Used Lee and Colley grading methodology (using criteria to give a standard of A-F)
    - Interviewed professionals and surveyed the membership of the Institute of Ecology and Environmental Management (IEEM)
    - Found there were generally improvements over time
    - Main change has been the guidelines, especially with tougher regulation from the IEEM, but also changes of legislation and case law (2006 guidelines created a standard method for ecological assessment)
    - Lack of good data and resources still seen as a limiting factor
    - Limited significance gives lack of confidence in the EIA
  83. 83What results did the Briggs and Hudson report yield?What results did the Briggs and Hudson report yield?
  84. 84What types of alternatives are there?1. No action
    2. Locations
    3. Scale of the project
    4. Processes or equipment
    5. Site layouts and designs
    6. Operation conditions
    (May be limited by commercial considerations (developer has only the land they have) and should be developed in consultation with stakeholders)
  85. 85What is the Dibden Terminal case study?- Primary use of the terminal would be to import and export/ distribute unitised freight in containers. Terminal also be used for import of aggregates for roll-on/roll-off cargo and lift-on/lift-off cargo
    - To have a 202 hectare operational area
    - 185 hectares of environmental measures (planting/ landscaping and nature conservation enhancements and agriculture)
    - 1.8km of quay providing 6 deepwater berths, cranes, storage areas, railway yards, offices, parking and landscaping
    - Orignial location to be placed on reclaimed land (always to be developed) but near internationally protected wetland and salt marsh
  86. 86What were the Dibden alternatives?1. Increase existing capacity - decking, change of use and efficiency
    2. Extend existing docks - little space and scope for reclamation
    3. Develop elsewhere - None viable - reclamation and transport links needed
    4. Do nothing
  87. 87How is the Southampton Biomass Power project an example for alternative designs and sight layouts?- Initial design was badly received by the local community
    - The Still No Southampton Biomass group campaigned saying it was too big, too close and not green
    - Redesigns considered with consultation said smaller stacks and building, more sensitive and alternative designs (marine - to mimic container ship (sloping profiles, external features echoing masts or containers)/ wave - curves to soften appearance, flows between components and blocks of colour to break up visuals/ high tech - inspired by modern high technical equipment, highlights industrial nature of the plant) and there should be further consultation with community
    - Further community consultation gave their views on the alternative design scheme (52% voting for marine)
    ALTERNATIVES HAVE TO BE REASONABLE
  88. 88What alternative A303 improvements were suggested for the route around Stonehenge?1. 2.1km bored tunnel (rejected because of costs (£510mn)
    2. Northern route (£283mn)
    3. Southern route (£246mn) - both having impacts on monuments, landscape, biodiversity and residences
    4. Cut and cover tunnel (£389mn) - potential damage on landscape and heritage (9m high embankment)
    5. 'Partial solution' (£159mn) - some traffic improvements and improvements to setting
  89. 89What was the decided alternative for the Stonehenge route?- A344 road closed that went very close to the site and grassland is being restored
    - 2009 = new visitors centre opened after being relocated to Airman's corner
    - Other schemes still being looked into, but setbacks as NGOs feel even a tunnel is too close to the site
  90. 90What were the changes made for alternative in the 2014 directive?- Requirements should be clearer
    'a description of the reasonable alternatives studied by the developer, which are relevant to the project and its specific characteristic
    - Instead of: 'an outline of the main alternatives studied by the developer'
  91. 91What are mitigation approaches?'Measures envisaged to avoid, reduce and, if possible, remedy significant adverse effects' (from Directive 97/11)
    1. Avoid the impact by not taking action
    2. Reduce/ minimise the impact overtime by maintenance or preservation (change layout/ site)
    3. Restore/ remedy the impact by repair or restoration
    4. Compensate by replacing resources - funding habitat restoration or people for noise financially
    (+Enhance = positive changes)
  92. 92What is the hierarchy for mitigation?What is the hierarchy for mitigation?
  93. 93What does avoidance aim to do?- In the extreme, don't build or avoid land take
    - Change site layout (avoid destruction of hedgerows)
    - Schedule lorry movements to avoid traffic congestion or late night noise
  94. 94What can be done via reduction?- Reduce visual impacts (heights of buildings/ plant trees/ build earth banks/ designs to fit in with existing landscapes)
    - Reduce area of greenfield with housing to protect nature conservation or amenity
    - Generally better to abate at source rather than abate at receptor
  95. 95What can be done to restore/ remedy?- Repair ot reseed a meadow used for temporary storage of construction materials
    - Resurface access roads damaged by heavy vehicle use
  96. 96What can be done to enhance as a form of mitigation?- Projects can have positive effects as well as negative, these could be further advanced to make them less of an issue
    1. By innovative design (Stonehenge visitor centre)
    2. By net gain habitat (Dibden) - more intertidal wetland habitat
    3. Generate local improvements that support the project and the local area (road or other infrastructure improvements) - provide incentives for communities
  97. 97How is mitigation included in the EIA?- Practice and effectiveness varies
    - Mitigation is now usually included as a 'planning condition' or 'section 106 agreement', these conditions are subject to the approval
    - Actual implementation is still not always monitored or effectiveness established
    - Environmental Management Planning is now more widespread, as a planning condition
  98. 98What are Environmental Management Plans?World Bank definition:
    An EMP outlines that mitigation, monitoring and institutional measurements to be taken during project implementation and operation to avoid or control adverse environmental impacts and the actions needed to implement these measures
    - EMP should be a structured plan for ensuring mitigation measures are implemented 'on the ground', as mitigation measures identified in the pre- consent phase may be subject to planning conditions or
    - DAVID HINDE, Highways Agency - 'a vehicle to ensure the commitment or promises made at the design stage are carried through - locking in the benefits'
  99. 99What are EMS? (Environmental Management Systems)- A structured and documented system to manage a company's overall environmental performance and responsibility
    - Includes company commitments on managing environmental impacts
    - Often accredited to ISO14001 standard
  100. 100What is the link between EIA, EMS and EMP?What is the link between EIA, EMS and EMP?
  101. 101What is the importance of EMP?- Focuses on the project itself
    - Includes ALL contractors, consultants if they have a role
    - Can include construction and operation phases
    - Includes protection, restoration and monitoring
  102. 102Who are the key parties for preparing the EMP?1. Project proponent - developer, design team, environmental consultants, contractors
    2. Regulators - planning authority, statutory consulates
    3. Stakeholders - community and interest groups
  103. 103What are the regulations for having to have an EMP?- The UK has no statutory requirement (Netherlands and Oz etc. do)
    - Planning authorities may request EMP to secure mitigation measures included for planning conditions
    - Little guidance from government other than 'planning authorities can require a scheme of mitigation covering matters of planning concern'
    - EMP allows conditions set to be framed effectively and with clarity on monitoring and reporting
    - May overlay with other related consents or licences and would be integrated into the EMP
  104. 104What is a typical structure of an EMP?1. Contents
    2. Introduction
    3. Project team - roles and responsibilities
    4. Emergency procedures (in case of breach consent)
    5. Consents and permissions
    6. Environmentally significant changes (and responsibilities)
    7. Generic environmental actions (legal requirements/ EMS documents)
    8. Register of site specific environmental actions
    9. Liaison and consultation
    10. Register of variations
    11. Technical schedules (monitoring methodologies)
    12. Appendices
    (All spheres written within the EMP (air quality etc. etc.))
  105. 105What is the London Array?- Offshore wind farm of 100km2
    - 175 turbines
    - 2 offshore substations
    - One onshore substation
    - 630 MW of electricity - enough power for around 480.000 homes a year 2/3 of homes in Kent
    - CO2 savings of 925,000 tonnes per year
    - Phase one competed end of 2012
  106. 106How is EMP seen in action on the London array project?- Offshore wind farms in Thames Estuary
    - Connection to National Grid at Cleve Hill, Kent - a substation, cabling, onshore works compound and realignment of overhead power lines
    - Ecological mitigation and management plan produced to address the ecological impacts of onshore works, as on particularly sensitive coastal zone
    - Habitat for Grey crested newt, slowworms and water voles that are all protected under national and international law (normally illegal to disrupt their habitat)
  107. 107What happened for the London Array project?1. Clearance of vegetation
    2. Onshore bird monitoring methodology
    3. Works in pits and ditches
    4. Great Crested Newt mitigation strategy
    5. Reptile surveys and habitat clearance
    6. Pre- construction water vole surveys
  108. 108What is within each schedule for an EMP?- Each schedule contains a description of habitat. species and locations, mitigation strategy and proposed monitoring and reporting
    - LPA consulates stakeholders including Natural England and wildlife groups
    - Schedules used as reference points for contractors and specialist ecologists throughout construction work - logging there is no intended deviation from the agreed mitigation
  109. 109What are the sources for UK law?1. HISTORICALLY - via 'public controls' e.g. the Alkali Act 1863 to control the caustic soda industry/ Public Health Act 1875 to regulate housing and sanitation
    2. COMMON LAW - such as nuisance and negligence, where private redress could be sought for environmental harm
    3. CENTRALISED LAWS - emerged in the mid 20thC (town and country planning act/ wildlife and country act)
  110. 110What happened from the 1970s onwards for the growth of environmental laws?- In response to
    1. Increasing awareness of the environment
    2. Greater potential damage by pollution
    3. International conferences and policies
    4. THE EU - EIA common law is derived because of the EU
  111. 111What is the importance of the EU directives?- Must be passed by the EU parliament
    - Binding on member states
    - Must be implemented by individual member states
    - Usually come with a time limit for implementation (e.g. 3 years for the 1985 EIA directive)
    - Breaches are punishable by the European Court, which also rules on appeals
  112. 112What is the history of EIA directive amendments?1. EC directive 85/337 = on the Assessment of the Effects of Certain Private and Public Projects on the Environment was adopted on the 27th of June 1985 (after about 15 years of negotiation and implemented in the UK on 3rd July 1988
    2. Amended by directive 97/11/EC implemented in the UK as the Town and Country Planning (EIA) Regulations 1999 and subsequently in 2011
    3. A new directive in 2014
    NB. There's been minor amendments (2003/35/EC sought to align the provisions on public participation with the Aarhus convention and 2009/31/EC added carbon capture and storage
  113. 113What has to be produced as part of an EIA?1. An Environmental Statement - has to address the direct/ indirect effects of the development on a series of 'factors' (population/ fauna/ flora/ soil/air / water/ climate/ landscape/ archeology) - should be one document and not a paper chase!
    2. Alternatives and mitigation - have to be considered. LPA to enforce via 'planning conditions'
    3. A non-technical summary must also be included
  114. 114What is the Dutch Dykes case in relation to projects that aren't listed in EIA?- The directive has 'wide scope and broad purpose', list illustrative and not exhaustive, so any type of project could require EIA
    - A lot can come under 'infrastructure' or 'urban development'
  115. 115What is the Big Yellow Property Company case study?- Big yellow property company Ltd. proposed to construct a storage and distribution facility (Goodman and another vs. Lewisham London Borough Council)
    - The LPA took the view that as such a development was not specifically described in either the Directive or Regulations, there was no need to consider an EIA
    - This was challenged in court and it was decided EIA was necessary and even though the proposal type wasn't under that listed in legislation
  116. 116What is the role of the LPA?1. Screening - decision in 3 weeks
    2. Scoping - opinion within 5 weeks, based on discussion between applicant, statutory consulates and the authority
    3. Consultation - with statutory consulates, public and others who have a view (must be alerted via publicity and have access to ES). The public are often consulted by the developer as part of the pre- application consultation. 'Community consultation plan' agreed in advance
    4. Evaluation environmental information
    5. Advertising
    6. Setting planning conditions
    7. Publicising the application and decision
  117. 117What is the Aarhus convention (1998)?- Links environmental and human rights
    - Acknowledges we owe an obligation to future generations
    - Establishes sustainable development can be achieved only through involvement of all stakeholders
    - Links government accountability and environmental protection. Gov accountable for their decisions on the environment and the people
    - Focuses on interactions between the public and public authorities in a democratic context
  118. 118What are the 3 pillars of securing citizens rights?1. Access to information
    2. Public participation
    3. Access to justice
  119. 119When is the Aarhus convention needed to be acknowledged?- Any EIA project (and others with significant effects) are subject to the convention
    - The convention lists an annex of the types of activities that need public participation before making approval decisions on projects
    - (e.g. licensing of nuclear power station/ smelter/ chemical plant/ road construction project)
  120. 120W1. Planning act 2008 places a duty upon developers to engage meaningfully with affected communities, local authorities and other statutory consulates over their proposals at pre- app stage
    2. Developer must produce and publicise a Statement of Community Consultation (take account of iterative process of design, EIA and mitigation etc.
    3. In prep for SoCC, must consult with local authorities on the statement content
    4. 2008 Act seeks to ensure there are opportunities for the public, local authorities, consulates and other interested parties to get involved and have their say during pre- app stage
  121. 121What is meant by 'material considerations' for public comments?- The only type of comment considered by planning authorities. Not overly personal, bringing things to attention of LPA
    1.Highway issues (traffic and safety)
    2. Noise, loss of light, smells
    3. Impacts on trees
    4. Lack of infrastructure
    5. Fitting in with national and local (as, if not more important than national- local development plans.. 'in this area...') policies
    (NOT - disputes between neighbours/ loss of view/ loss of property value)
  122. 122What is considered when making a decision?1. Contents of the ES
    2. Views of the public (but 'material considerations')
    3. Submissions from Statutory Consultees
    4. Planning Policy
  123. 123What is the context for planning policies?1. NATIONAL POLICY - (e.g. National Planning Framework/ National Policy Statements - on infrastructure (energy/ waste/ water etc.)
    2. EMERGING POLICY IN GOVERNMENT STATEMENTS - Ministerial statements, white papers
    3. LOCAL SPATIAL PLANS - 'Local development frameworks' and 'core strategies' (formerly 'development plans') e.g. policies on land use, conservation, economy, landscape and housing etc.
    POLICY HAS TO BE CONSIDERED IN SCOPING
  124. 124What is the role of statutory consultees?**Screening only done by LPA, statutory consulates only involved at scoping and beyond**
    - Are consulted prior to scoping opinion
    - Usually included in ongoing consultation through the process
    - Must supply relevant data/ information during the EIA, but not required to gather new data
    - Must have opportunity to comment on ES
    **Involved via law - NGOs/ charities not (RSPB)**
  125. 125Who are the statutory consultess (in England)?1. Principal council for the area (if not the planning authority)
    2. Natural England
    3. Environment Agency
    4. English Heritage (if a scheduled monument or listed building is likely to be affected)
    5. Marine Management Organisation
    6. Any other body required to be consulted under 2011 EIA regs part 1, section 2 (highways/ harbour authority/ crown estate)
  126. 126What are the legal challenges in court?DOMESTIC COURTS - Rule on whether the Regulations have been compiled with, including whether sufficient information has been provided for 'individual citizens; to make representation about possible effects
    EUROPEAN COURTS - further rulings on adherence to directive
  127. 127What are the recent UK developments in law?- National Planning Policy Framework - defines 'sustainable development' and establishes core principles (established around 2012)
    - Consolidation of EIA regulations as Town and Country Planning Environmental Impact Assessment Regulations in England and Scotland 2011
  128. 128What are the EIA regulations 2011?- No major changes, consolidates several EIA legislative tools (development, minerals, costal)
    1. Duty to give reasons for negative screening decisions
    2. Dealing with 'salami slicing' -
    - Clarify the handling of subsequent applications for EIA development
    - Changes to the screening of modifications or extensions to projects
    - Confirmations that screening directions for sche.2 development may be requested from SoS by any person and can apply to developments below sche.2 thresholds
    - Also now includes sites for geological storage of CO2 and installations for capture of CO2
  129. 129What is thought to be in the revised EU Directive?- Formalises 1 framework for the whole EU
    - Anyone can do EIA currently - may introduce qualifications and a professional body
    - Make monitoring more prominent and make EIA think more about climate change
    - Quality of EIA process - check data used
    - Harmonisation of assessment of requirements among Member States, including mandatory scoping and independent,publicly available monitoring
    - Development of synergies with other EU environmental legislation and policies (climate change, resource efficiency and biodiversity)
  130. 130Whats the importance of whether looking at biodiversity matters?- Since ecosystem services have come to light, biodiversity importance is increasing, as seen to have an impact of health, social relations, security and freedom of choice
    - 2005 survey suggested 60% of Britain's ecosystems declining in quantity/ quality unsustainable (Millennium Ecosystem Assessment)
    - Farm birds declined to 1/2 of what they were
    - 1 in 7 species face extinction in UK (one of least natural countries in the world)
  131. 131What are meant by indicator species, and how are they important?- Listed under national biodiversity action plans (now are showing signs of reversing biodiversity loss)
  132. 132Is EIA the answer to biodiversity loss?- Only partly; it helps to conserve species and habitats from developments
    - Doesn't address large scale land use change, pre- existing developments, introduced species, climate change etc.
    - However is clearly written into EIA law (fauna and flora)
    - EIA has halted Dibden Bay Harbour and London Array phase 2 expansion
  133. 133What stages does an EcIA include? (As stated IEEM, 2006)1. SCOPING - involving consultation to ensure the widest possible input for determining the scope of EcIA
    2. An identification of the expected zone of influence
    3. A determination and evaluation of ecological resources
    4. A description of expected biophysical changes (which could affect valuable ecological resources)
    5. Assessment of those changes if they are able to cause a significant ecological impact
    6. The development of ecological improvement and mitigation measures for avoiding any negative impacts
    7. An assessment of ecological impacts and their significance
    8. Summing up of consequences for decision making
    9. Monitoring and implementation of mitigation measures and ecological outcomes
  134. 134What are the limits to impacts for quarrying?- All ecological features or resources occurring within the area to be worked on are affected by changes in land cover (topsoil stripping/ excavation)
    - Noise, dust and changes in human activity also affect species in adjacent habitats
    - Major, long term dewatering operations could cause consequences for water- dependent habitats distant from the quarry (hydrological/ hydrogeological modelling may be necessary)
    - New infrastructure could have ecological consequences beyond the boundaries (especially in dewatering)
    - ZONE OF INFLUENCE should include all features of sufficient value to be included in the assessment
  135. 135What is meant by a desk study?*Information on protected areas and habitats created from
    -Local authorities, natural England, EA, wildlife trusts, specific groups (birders, wildfowlers, bat groups (have particular implications in developments) etc.)
    *Spatial investigations from
    - OS maps, geological maps, land use maps, habitat maps, remote sensing, county resources or Magic (a DEFRA online mapping system that shows designation areas within the UK)
  136. 136What are the national protected areas?- National laws date back to 1940s (updated by the Countryside Rights of Way Act (2000) and Natural Environment and Rural Communities Act (2006))
    - Conservation in the UK is run by Nature Conservancy Councils (Natural England)
    1. SSSI
  137. 137What are Sites of Special Scientific Interest (SSSIs)?- Scientific basis for selection - part of a national series to maintain the diversity of plants and animals in the UK
    - Often on privately owned land
    - Old system (pre 2000) not very effective (e.g. 45% of SSSIs in 'unfavourable condition')
    - All SSSIs have a management statement that can extend to land outside the site
    - Decline more often due to neglect rather than intentional damage
    - Not entirely delivering its aims...
    - Financial rewards for following management actions (worst case for not doing something = compulsory purchase by the council following a 'management notice')
    - Offence of 'reckless damage' now covered for 3rd parties
    - Development isn't permitted without satisfactory mitigation agreed by Natural England
  138. 138What are National Nature Reserves?- Scientific and research basis of national importance
    - Usually owned or managed by NCC
    - 400+ designated sites = <1% of land area, but Ratcliffe (1977) suggests should be around 900
    - General importance higher than SSSI (impacts likely to be more significant)
    - National parks can be designated for cultural activities (not just ecological)
  139. 139What are local nature reserves?- Similar basis for selection to SSSIs - 'local importance' only
    - Usually on land owned by local authority
    - Designated by local authorities
    - Possible a different objective to National Nature Reserves
  140. 140What are non- statutory nature reserves?- Wide range of individual local authority designations
    - SINCs (Sites of Importance for Nature Conservation)
    - In Southampton this is 'greenways'
  141. 141What are the internationally protected areas?1. Ramsar sites (national and international importance in parallel)
    2. Special Protection Areas (SPAs) (in parallel with SACs, designated because of presence of priority habitats)
    3. Special Areas of Conservation (SACs) - Natura 2000 sites designated to safeguard the wildlife most at risk
    - If impacts likely, these will usually need Appropriate Assessment
    - Development is possible if IROPI (Imperative Reasons of Overriding Public Interest)
  142. 142What are Ramsar sites?- Ramsar convention on wetlands of international importance (1971)
    - Covers wetlands under a broad definition
    - Supports monitoring and conservation
    - General and probably unenforceable
    - Protection in UK via national and EU laws
    - 140 UK sites
  143. 143What is the EC Wild Birds Directive 1979?- SPAs designated to safeguard habitats of migratory and threatened species
    - 240 UK sites
  144. 144What is the Habitats Directive 1992 and how are they designated?Special Areas of Conservation (600 sites in UK)
    - Need to have a presence of a priority habitat types or species
    - Has a rare habitat or species for the UK
    - Hs the presence of a diversity of listed habitats and/ or species
    - Presence of a large proportion of the European resource
  145. 145What is used for boundaries of land and sea for implementation of habitat designations?- Nationally, NNR and SSSI use up to mean low water
    - Marine Nature reserves (only 3 in UK (Lundy, Skomer and Stranford Lough) plus voluntary (Kimmeridge) have broadly same protection as NNR
    - Heritage coasts have no legal protection, but considered by planning authorities in matters like development
    - Hard to asses where to stop the protection.. marine protection can go from terrestrial to marine environments
  146. 146How are 'European Marine Sites' given international protection?- Protected under European law and include SACs and SPAs
    - Part of the wider Europe- wide network (Natura 2000)
    - Can extend from terrestrial to marine (as 'coastal and marine SACs')
  147. 147What is the hierarchy for sites for their protection status?What is the hierarchy for sites for their protection status?
  148. 148What is the UK Biodiversity Framework?- Initiative from Earth Summit (Rio, 1992)
    - Creates an action plan for species and habitats
    - Wider remit than traditional UK protection
    - Funding with corporate partners
    - 1150 priority species
    - 65 priority habitat types (heathlands, mires, brackish lagoons (Hampshire has many saline lagoons and issues arise from rising sea levels)
  149. 149How are individual species given protection?Traditionally, protection via Wildlife and Countryside Act 1981 has since been strengthened by CRoW (Countryside Rights of Way Act), consolidated in Conservation of Habitats and Species Regulations 2010 (and habitats directive)
    - Scheduled species include;
    1. All birds (unless specifically exempted)
    2. All reptiles and amphibians
    3. Named plants and animals
    4. Licences needed for disruption, handling and certain survey types
  150. 150What individual species are protected?- Hazel dormouse
    - Reptile species
    - Some amphibians
    - Bat species
    - White clawed crayfish
    - Nesting birds
    - Badger
    - Water vole
    - Otter
  151. 151What regulatory bodies are there for ecology?- Natural England (dispense European Protected Species Licenses, consult with
    1. Councils
    2. Planning Departments
    3. County Ecologists
    4. EA
  152. 152What are the implications for bats and developers?- Developments are halted and planning is often refused on ecological issues
    - Bat species most common ecological issue
    - Biodiversity Action Plans/ National Planning Framework
    - European Protected species licence needed for survey and management
    - Costs and delays often result
  153. 153What are the facts of bats?- 17 species (breeding in the UK)
    - Hunt by echolocation
    - Diet consists of invertebrates
    - Hibernate during winter months
    - Roost during day, hunt during the night
    - Roost types include day, transient, hibernation, feeding perch, maternity and mating
    - Emerge from hibernation in may (weather dependent)
    - Have a single pup in June (disperse come August), mate in October (females store sperm over hibernation)
    - Go into torpor depending on weather conditions
  154. 154What are the common bats?- 17 breeding species in UK
    - Common Pipistrelle - most common in UK, often affected by planning applications, as likes to roost under external features, such as hanging tiles and loose lead flashing etc. Gets into v. small gaps!
  155. 155What is the influence of bats for EIA?- Probably the most common ecological problem for developers
    - Survey work has to be done overnight and care taken for the complicated patterns (out of hibernation in spring, reproduce in summer)
    - Come into conflict with humans as make use of man made features
    - Some species listed on biodiversity action plans as priority species
    - Under current UK/EU legislation, its illegal to disturb/ kill/ harm bats and damage their breeding/ resting places
  156. 156What implications do bats have for buildings?- It could be illegal to re-roof houses if pipistrelles were roosting there (and you knew - A GREY AREA)
    - Extend the property if bats were present in areas which would be disturbed/ impacted
    - Demolish or convert a building where bats were roosting
  157. 157What is the protocol for assessing whether bats are present?1. INITIAL SURVEY - carried out at any time of year
    EXTERNAL - access points/ droppings/ suitable habitats/ flight lines
    INTERNAL - feeding remains, droppings, scratch marks, urine staining
    2. PHASE 2 - during active bat season
  158. 158What are the methods for phase 2 bat surveys?- Emergence/ re-entry
    - Sonogram analysis
    - Visual observation
    - Species, type of roost (maternity/ day/ hibernation/ mating)
    - How big is the populations, how often is roost used?
    - Can include 'destructive search' under licence (often needed during development) - removes bats that don't leave on their own accord (very sensitively)
  159. 159What can be mitigation for bats?- Avoidance - leave the bats
    - Compensation - Replacement with like for like or similar. Bat boxes/ restoration of roost (£20k bat house an extreme!)
    - Enhancement - additional features to what is already present to promote biodiversity and protected species - bat boxes/ hedgerows and linear features/ water features/ increased access to roost areas/ enlargement of roost areas
  160. 160What are habitat surveys?- Baseline studies to establish the nature of a site
    - The NCC Phase 1 habitat survey is widely accepted as the standard approach for assessing the ecological condition of a site during EIA
    - Recent and up to date surveys can be used rather than always collecting new data
    - Standardised classification so developers/ planners know what they are looking at
  161. 161What is a NCC phase 1 habitat survey?- Desk study may provide sufficient information to make a field site unnecessary, but they can be good to verify information collected
    - It is unlikely detailed ecological information will be available and an initial survey using the NCC phase 1 method should be carried out
  162. 162What is a JNCC phase one survey?- Provides a record of the vegetation and wildlife habitat using a reproducible method based on a standard classification of vegetation types and referring to topographic and substrate features
    - Method developed with conservation aims, but is equally applicable to baseline studies in an environment assessment prior to development
  163. 163What methods are used in habitat surveys?- Aerial photography
    - GIS generated base maps
    - Ground truthing (direct measurements if needed)
    1. Vegetation types mapped - (usually on OS 1:10,000) based on 90 specified habitat types
    2. 'Target notes' - made in the field to give a brief account of particular areas of nature conservation interest (rare plants/ animals, management regimes, geological features/ recreational uses)
    3. Habitat areas estimated using GIS - hard to find boundary (especially as will change at different times of year)
    *Mapping gives highly visual presentation of the data gathered - useful for other EIA members*
  164. 164What are the limitations of the NCC phase 1 habitat survey?- Inaccuracy (<5%?)
    - Observer error: wrong habitat categories assigned
    - Boundary error: difficulty of separating unbounded habitat units
    - Temporal variations over different scales
    - When to survey? (Account for successional changes, timings varying with habitat, limitations may be developer- driven)
  165. 165What are phase 2 and 3 habitat studies?Phase 2 - Usually restricted to single habitat types or major groups, more detailed species level identification, more exact habitat classification, National Vegetation Classification (Rodwell, 1991) and diversity evaluations: assesses range of variation within a particular habitat
    PHASE 3 - highly detailed (specialists required), extent and distribution of plant and animal species on sites, produces detailed information on frequency or abundance of communities and species. Implications for site management
  166. 166How are habitat surveys undertaken in EIA, how well is it done?Treweek and Thurling (1997) found in 197 ESs...
    1. 93% identified impacts and only 9% attempted to quantify them
    2. Of the ecological impacts, only 45% based findings on new survey information
    3. Only 48% consulted with statutory consulates for nature conservation
    4. Only 23% provided detail of mitigation methods (although 78% mentioned them)
    5. A 'universal failure' to make any commitment to future monitoring
  167. 167Does international law always protect from development?- Natura 2000 sites are strongly protected- development which damages the conservation objectives or the integrity of the site is not usually permitted
    - An Appropriate Assessment (AKA habitats regulation assessment) is needed where a site is threatened, but they can be developed in some circumstances (under IROPI)
  168. 168What is Appropriate Assessment?- A report assessing the potential effect on a designated European site
    - UK government planning policy also extends the same levels of protection to Ramsar sites
    - Not done by the developer, but the local planning authority and statutory bodies
    - In parallel with E.S and may overlap with it because of that
  169. 169What is involved in Appropriate Assessment?- Aims to asses the implications a proposal would have on a site's 'conservation objectives'
    - To ascertain whether the integrity of a protected site would be adversely effected
    - Carried out by a 'competent authority' (LPA), usually guided by natural England
    - Developer must supply information (survey data/ impact prediction)
    - Considered in parallel to the ES at the time of decision
    - Can inform decisions involving IROPI
  170. 170What is the Appropriate Assessment case study for Trump International Golf Links, Scotland?- Meine Estate, Aberdeenshire, 12 miles north of Aberdeen, taking approximately 1400 acres
    - Two 18-hole championship courses set admit soaring dunes on Scotlands NE coast, with fully array of resort and member activities (inc. practice facilities, golf driving range, golf academy and short game practice area)
    - Issue with distance from SPA and map of the site in relation to the SPA, projected number of additional residents and visitors, and type of resident dwellings proposed
    - Managing recreational pressure with bird disturbance the main issue
    - Population of pink footed geese (+ terns/ eider etc.) a viable component of the EU estuary site (SSSI within site too)
    - Education and management of visitors to minimise disturbance on and off site used as mitigation
  171. 171What is Imperative Reasons of Overriding Public Interest (IROPI) for 'Natura 2000' sites?- If, in spite of -ve assessment of the implications of the site and the absence of alternative solutions, a plan or project must be carried our for IROPI, (including those of economic issues), member state should take all compensatory measures necessary to ensure overall coherence of Natura 2000 is protected and shall inform the commission of compensatory measures adopted (e.g. if EU permission is needed)
    - IROPI circumstances for when theres no alternative solutions + all compensatory measures are adopted (EU have to be consulted over it - national Government vs. EU commission)
  172. 172What are the considerations for IROPI when the site concerns hosts of priority natural habitat type and/ or a priority species?- Only considerations which may be raised are those relating to
    1. Human health/ public safety
    2. Beneficial consequences of primary importance for the environment
    3. Further to an opinion from the Commission to other imperative reasons of overriding public interest
    (only very important human factors override the presence of key wildlife)
  173. 173What is cultural heritage?1. Archeological (historical)
    2. Architectural (cultural)
    3. Aesthetics (landscape)
    (More of the human impacts)
  174. 174Why is cultural heritage important?- Defines a place, associations give identity
    - Easy to find 'where in the world'
  175. 175What is cultural heritage?- Not just historical buildings/ history of the place
    - Things that have taken place in past and present
    - Characteristics of the location, how development may change the 'sense of place'
    - e.g. 'ugly' pylons proposed to be put underground by national grid (national parks/ ANOBS made better as currently have 355 miles of lines going through them)
  176. 176What are the issues associated with putting pylons underground?- Require a 50m wide trench thats 2m deep to accommodate 6 lines carried by pylons (engineering issues)
    - Hard rocks/ archeological sites can present obstacles
    - Alternatives include moving the pylons to less obtrusive locations (in the High Weald ANOB, 50m pylons to be moved down the hill, so there is wooded slopes behind them rather than sky)
    - Pylons cheap
    - Scheme to add £500m to electricity bills over 8 years (22p a year on average bill)
  177. 177What is the legal background for EIA cultural heritage?- Require description of effect on 'material assets, including architectural and archeological heritage, landscape...'
    - Also used if assessing schedule 2 developments need EIA 'landscapes of historical, cultural and archeological significance'
    - Developers have to address the issue
  178. 178Why does cultural heritage matter?- Defines identity (regionally or nationally)
    - Tells us about the past
    - Used for education and research
    - Can be used as a revenue source (e.g. Richard III found in Leister car park (visitor centre for it)- then worth £45m to the local economy)/ Paris = Disney most visited place (not eifell tower etc.)/ London = British Museum
  179. 179What sort of things are considered in cutlas heritage?1. Buildings (including the ruins)
    2. Historical artefacts
    3. Landscapes
    4. Activities (past and present)
    5. Cultural association - Shakespeare country/ Dorset (Hardy county)
  180. 180What archeological/ architechtual features are there?Archeological sites include ruined buildins/ earth works/ field system (Dartmoor from 1400BC)/ roman remains (in lower 2/3 of England)
    - Chalk downlands - systems visible from 300BC
    - Boxgrove near Chichester has Hominid remains from 500,000 years ago
    - Wiltshire = stone henge/ stone circles/ hill (identity given)
    - London = Gurkin etc. in square mile, activities can also be considered (spitfire/ Craig David in Southampton)
  181. 181How is cultural heritage assessed?1. Baseline data - a desk study
    2. Nature of site
    3. Field work and mitigation
  182. 182What can be found in baseline data?1. Listed buildings
    2. Scheduled monuments
    3. Protected wreck sites
    4. Registered parks and gardens
    5. Registered battlefields
    6. World heritage sites (UNESCO designated)
    7. Heritage areas/ 'conservation areas' locally
    8. Data is held by government departments/ local authorities and local interest groups may be consulted
  183. 183How can the nature of sites protect their perseveration?**Have to think of more**
    1. Wetlands - (peat bogs) organic materials tend to be well preserved ('bog bodies - Saxon worriors')
    2. Coastal sites - 7000 years ago there was a much larger land area (Doggerland)- many landscapes and remains still present below sea level (Woodhenges on the Norfolk coast)
  184. 184What are Scheduled Ancient Monuments?- Over 600,000 known archeological sites in England
    - 2% of which (over 18,000) are protected by law as SAM
    - Protected under Ancient Monuments and Archeological Areas Act (1979)
    - Over 200 classes of monument including standing stones, burial mounds, castles, ruined monitories, collieries, wartime 'pillboxes' (pillbox study group restore them - can use them to help development)
    - Only those 'nationally important' are protected by law
  185. 185How is architecture acknowledged?Listed buildings - Department of Culture, Media and Sport maintains a list of Buildings of Architectural importance/ historic buildings. Identified by Historic England and can be Grade I/II/III
    - Almost all buildings pre 1800
    - Many pre 1900 (depending on architectural importance/ cultural association)
    - Some 20th century (defences/ art nouveau/ factories)
    - Over 500,000 nationally
  186. 186How is global designation important in baseline data?- World heritage sites/ UNESCO adopted the Convention concerning protection of the World Cultural and Natural Heritage in 1972
    - Encourages the identification, protection and preservation of cultural/ nature to maintain network of heritage around the world considered to be of outstanding value to humanity
    - Includes 'cultural' and 'natural' (wetland sand wildlife) sites
    - In UK there is the 'National Heritage List' - (on Historic England)
  187. 187How are different aspects of the environment cut across?- Not just that the historic setting exists, but how the development near a designated or important site may have to take into account the
    1. Noise/ vibration
    2. Impacts on visual setting
    3. Pollution
  188. 188How is field work and mitigation carried out?- Specialists called in;
    - Archeologists do geophysical surveys, dig exploratory pits/ trenches and cataloging things
    - Visual assessment or survey of users and local people for architecture and landscape
    - Significance largely about establishing importance and context
  189. 189What examples of mitigation are there?- Maintaining things during construction
    - Preservation
    - Fences, barriers/ pillows away from diggers etc.
    - People on site 'watching briefs' during some stages of construction (ammunition or important pieces of archaeology)
    - Management of water table
  190. 190—
  191. 191—

Informações

Descrição
FlashCards sobre ENVS2006, criado por Pippa Holman em 01-02-2017.
Criado por
Pippa Holman
Visualizações
9
Avaliação

Mais sobre Environmental Impact Assessment

Fale Conosco

Sobre o que é sua mensagem?

O que a gente deve adicionar?