Ajude a dar forma ao GoConqr. O que a gente deve adicionar?

Flashcards

Cockermouth

Imogen Raper Inglês 9 flashcards

Flashcards do conjunto (9)

  1. 1Introduction to CockermouthOne of the largest urban areas in cumbria susceptible to river flooding
    Extreme rainfall event, 19th November 2009, flooding was widespread throughout Cumbria.
    In Cockermouth, torrent of water (2.5m high) cascaded down the main road
  2. 2What was the cause of the flood event?Weather front stalling over NW England = feed of warm/moist air from S.Atlantic. Forced to rise by mountains of Lake district, the saturate air readily condensed.
    Mountain slopes transferred water to flatter lowlands with readily overtopped riverbanks
  3. 3How was Cockermouth affected by the series of precipitation?Cockermouth is located at mouth of R.Cocker, where it joins the R.Derwent. Lots of water therefore covering at confluence.
    Rock type was predominantly impermeable/soils were already saturated - rain was overland flow
    Rivers had not been dredged which may have exacerbated flooding
  4. 4What was the nature of the flood event?Extreme event - 1:1000 year flood
  5. 5What were the social impacts of the event?Bridges collapsed/others damaged
    Loss of water/power
    Directly affected 1300 people
    Homes were flooded by 1.8m of muddy water
    Local schools forced to close
    Dislocation of local roads increased transport difficulty
  6. 6What were the economic impacts?Cost of damage in excess of £100 million
    Reduction in local economy - business were unable to operate properly
  7. 7What were the environmental impacts?Agriculture ruined from inundation of land
    Livestock killed
    Pastures saturated with rocks
  8. 8What was the response?Search and rescue: 200 people airlifted from rooftops / rescued via boat
    Temporary shelters
    Electricity re-established
    Reconstruction - property damage repaired
    Insurance payments - the industry paid out £175m of claims - total cost = £275m
  9. 9What has been introduced to prevent flooding post 2009?Environment agency designed flood defences (EG. raising sections of flood walls/embankment)
    Construction commenced in 2012 - scheme is likely to cost approx. £4.4m

Informações

Descrição
FlashCards sobre Cockermouth, criado por Imogen Raper em 27-04-2017.
Criado por
Imogen Raper
Visualizações
2
Avaliação

Mais sobre Cumbria Floods

Fale Conosco

Sobre o que é sua mensagem?

O que a gente deve adicionar?