OPERATIONAL RISK

aeri baek Inglês

Conteúdo do mapa

OPERATIONAL RISK

  1. PROCUREMENT

    • BUDGET EXCEEDS
    • INCORRECT INFORMATION FROM THE INVESTOR
    • LACK OF SUCCESSION PLANNING
    • SCHEDULE OVERRUNS
    • OVER-OPTIMISTIC WORKLOAD
    • ACCEPTANCE TOWARDS UNREALISTIC DEADLINE
    • REMUNERATION PROBLEM (LATE SALARY)
    • UNDOCUMENTED CHANGE ORDER
    • DEFECTIVE DESIGN
    • INCOMPLETE QUANTITY ESTIMATE
    • CONTRACTOR INSOLVENCY
    • DIFFICULT TO OBTAIN PERMIT
    • CLAIM SETTLEMENT
    • INADEQUATE LEAD TIME
    • INADEQUATE SUPPLY SOURCE
  2. LOGISTICS (SYSTEM)

    • OVERLOADING
    • TRAFFIC CONGESTION
    • PROJECT DELAY
    • ACCIDENT DURING LOADING AND UNLOADING AT SITES
    • ROAD ACCIDENT
    • MATERIAL DELIVERY DELAY
    • PRIME MOVER TYRES EXPLODES
    • SCAFFOLDING FALL DOWN
    • FORKLIFT BREAKDOWN
    • STRUCK BY EQUIPMENT DURING LOADING AND UNLOADING
    • CRANE BREAKDOWN/DEFECTIVE
    • WEATHER CONDITION (FLOOD, EARTHQUAKE)
    • ROAD CONDITION (SLIPPERY, HOLES, DAMAGE)
    • LORRY AND TRUCK BREAKDOWN
    • ACCIDENT ON WORKERS
  3. HUMAN RESOURCES

    • WORKERS NOT ABIDE THE REGULAR WORK HOURS
    • WORKERS ARE INJURED IN WORKING HOURS
    • CONFLICT AMONG WORKERS IN CONSTRUCTION SITES
    • CUSTOMER COMPLAIN
    • POOR LEADERSHIP
    • CORRUPTION IN WORKERS
    • POOR ETHICS AMONG WORKERS
    • HIGH ABSENTEEISM AMONG EMPLOYEE
    • WORKER'S STRIKE
    • SHORTAGE SKILLS
    • SHORTAGE LABOR
    • FRAUD
    • HUMAN ERROR
    • WORKERS TURNOVER
    • SABOTAGE
  4. RESOURCES

    • WEAR AND TEAR MACHINE
    • WASTE OF RESOURCES
    • MATERIAL SHORTAGE
    • EQUIPMENT NOT PROPERLY HANDLE
    • MACHINERY NOT AVAILABLE
    • LOW OPERATING PRODUCTIVITY
    • WRONG MATERIAL ORDER
    • SKILL GAPS BETWEEN WORKERS
    • INCOMPLETE DESIGN DOCUMENTS
    • INTERRUPTING DURING DELIVERY RESOURCES
    • UNABLE ADAPT WITH NEW TECHNOLOGY
    • NATURAL DISASTER (FLOOD, EARTHQUAKE)
    • MATERIAL/LABOUR AVAILABILITY
    • DEFECT MATERIAL/EQUIPMENT
    • NON-QUALITY MATERIAL
  5. CONSTRUCTION

    • POOR AND INADEQUATE LIGHTING
    • NATURAL DISASTER FLOOD AND EARTHQUAKE
    • FALL FROM HEIGHT
    • ABSENTEEISM OF TRAINED MANPOWER AT SITES
    • CHANGES IN PROJECT IS POORLY MANAGED
    • CUTS FROM SHARP OBJECTS
    • INJURY / DEATH AT CONSTRUCTION SITES
    • FALLING OBJECTS
    • LACK OF COMMUNICATION BETWEEN TOP LEVEL, MIDDLE LEVEL AND BOTTOM
    • INEXPERIENCE PERSONNEL ON SITE
    • BUILDING ON FIRE
    • CONFLICT AMONG DESIGNING TEAM
    • UNTRAINED PILING RIG MACHINE
    • FALL DOWN STACKING MATERIAL
    • POOR QUALITY WORKMANSHIP
    • COLLAPSE (NOT SUITABLE)

Informações

Descrição
Mapa Mental sobre OPERATIONAL RISK, criado por aeri baek em 05-11-2017.
Criado por
aeri baek · nov 2017
Atualizado
5 nov 2017
Visualizações
0
Avaliação

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?