CHAPTER 5 : Part 1
Conteúdo do mapa
CHAPTER 5 : Part 1
Types of project constraints
- Technical or Logic Constraints
- related to the networked sequence in which project activities must occur
- Resource Constraints
- absence, shortage, or unique interrelationship and interaction characteristics of resources that require a particular sequencing of project activities
- People, Materials, Equipment, Working Capital
- Technical or Logic Constraints
Scheduling Problem
- Time Constrained Project
- Resource Constrained Project
Resource allocation Methods
- Limiting Assumptions
- Splitting activities is not allowed
- Level of resource cannot be changed
- most slack pose the least risk.
- Reduction of flexibility does not increase risk.
- Time-Constrained Projects
- completed by an imposed date
- leveling techniques
- Peak resource demands are reduced
- Resources over the life of the project are reduced.
- Fluctuation in resource demand is minimized.
- Disadvantages
- Loss of flexibility occurs from reducing slack
- Increase in criticality of all activities
- Limiting Assumptions
Splitting Activities
- Scheduling technique to get a better project schedule or to increase resource utilization
Benefits of Scheduling Resources
- Leaves time for consideration of reasonable alternatives :
- Cost-time tradeoffs Changes in priorities
- Provides information for timephased work package budgets to assess:
- Impact of unforeseen events.
- Amount of flexibility in available resources
- Leaves time for consideration of reasonable alternatives :
Multi-project Resource Schedule
- Problem
- Overall project Slippage
- Inefficient resource application
- Resource bottlenecks
- Solution
- Create Project Offices or departments
- Use a project priority queuing system
- Centralized project management
- Outsource
- Problem
Rationale for Reducing Project Duration
- Time to Market
- Adaptability
- Unforeseen Delays
- Incentive Contracts
- Imposed Deadlines
Accelarating Project Completion
- Resource Constraints
- Do it twice – fast and correctly
- Fast-tracking
- Critical chain
- Reducing Project Scope
- Compromise Quality
- Resource Not Constraints
- Adding resources
- Outsourcing Project Work
- Scheduling Overtime (OT)
- Advantages
- Avoid additional cost
- Fewer distraction
- Disadvantages
- 2x / 3x payment
- productivity decline
- Advantages
- Establish a Core Project Team
- Resource Constraints
Cost
- Direct Cost
- Normal costs that can be assigned directly to a specific work package/project activity
- Labor, materials, equipments, and subcontractors
- Crashing will increase direct costs
- Indirect Cost
- Cannot be associated with any particular work package
- Supervision, admin, consultant, machinery
- (crashing) will reduce indirect costs.
- Direct Cost
Priority Rules
- ASAP
- Minimum Slack First
- ALAP
- Shortest task duration first
- Most Successor
- Most critical followers
- Most Resource first