Contracts
Essentials of a valid contract
- 1. Intention to create legal relations
- 2. Consideration
- 3. Agreement = offer + acceptance
Types of Contract
- Traditional
- 1. Fixed price/lump sum
- Simple projects
- Traditional methods of tendering
- Client requires total control of costs
- 2. Measurement
- Approximate BoQ used then remeasured at completion
- 3. Cost reimbursement
- Work goes ahead on basis of labour and materials and a target cost is aimed for
- Kidderminster and LMH
- 1. Fixed price/lump sum
- Design and Build
- Contractor designs and builds, designer is often novated to the contractor
- Disadvantages
- Quality of design can be sacrificed
- Cost reductions
- Employer's Requirements need to be sturdy
- Landscape design can be done by sub-contractors!
- Advantages
- Single point of responsibility
- Final cost virtually guaranteed
- Fewer claims
- CUBRIC
- Management
- Client needs speedy completion of project
- Management contractor works alongside design team but does not carry out the work
- Works are let to specialist sub-contractors
- Partnering
- Large multidisciplinary projects
- Joint venture, consortia, alliance, project/strategic partnering, PPP, PFI, D+B finance + operate
- All parties collaborate
- Grangegorman
- Commitment to cost reduction
- Can begin earlier than tender stage or at construction stage
- Team works for contractor or developer
- Client seeks tenders through OJEU and usually selects three teams to bid for the contract
- Traditional
Contract Documents
- 1. Agreement
- Parties
- Recitals
- Articles
- Witnesses
- 2. Specification (qualitative)
- 3. Schedules or Bills of Quantities (quantative)
- 4. Drawings (illustrative)
- 5. Conditions of Contract
- 1. Agreement
Forms of Agreement
- JCLI
- Works
- Maintenance Works
- Home Owners and Occupiers
- Works and Maintenance combined
- Works with Contractor's Design
- JCT (Joint Council of Tribunals)
- Standard Building Contract (SBC)
- Design and Build
- Intermediate (IC)
- Minor Works (MW)
- Major Projects (MP)
- Framework Agreements (FA)
- Measured Term Contract (MTC) - Maintenance
- GC Works (Government Contracts)
- Government/Local authorities now prefer NEC
- NEC (New Engineering Contract)
- Non-adversarial approach to contracts
- Encourages the team to work together
- Infrastructure Conditions of Contract 2011 (ICC formerly ICE)
- Predominantly used for civil engineering projects
- Engineering and Construction Short Contract (ECSS)
- JCLI
Why are standard forms important?
- 1. Certainty: required performance is known and clearly stated
- 2. Standardisation: enables contractors and professionals to be familiar with the rules laid down and therefore saves time and avoids confusion
- 3. Suited for Purpose: each form of agreement has been designed for particular types of project