Mapa mental
PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES

Conteúdo do mapa
PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES
DEFINITION
- COMMON USING TERMS
- WORK
- Deliverables that are the result of effort
- BREAKDOWN
- Divition in parts
- STRUCTURE
- Something arranged
- in a definite pattern organization
- Something arranged
- OTHER TERMS
- THE DEFINITION TERMS
- facilitate understanding
- of the integral role the WBS plays
- in project management practice
- of the integral role the WBS plays
- facilitate understanding
- WORK
- CONCEPT
- DELIVERABLES
- Any unique and verifiable product, result, or capability
- DELIVERABLES ORENTED WBS BENEFITS
- Better communication
- More accurate estimation
- Increased confidence
- A foundation for the control
- DELIVERABLES ORENTED WBS BENEFITS
- Any unique and verifiable product, result, or capability
- DESIGN
- Provides a graphical representatio of the Project scope
- ORGANIZATIONAL PERSPECTIVE
- Defined clearly organizational responsabilities
- MANAGEMENT
- WBS support effective Project management
- WBS LEVELS
- Depend upon the size and complexity
- DELIVERABLES
- CHARACTERISTICS FROM THE DICTIONARY DEFINITION
- Supports the definition of all work required
- to achieve an objective
- illustrate and define the hierarchy of deliverables.
- organized into ‘‘parent-child’’ relationships.
- Has an objective or tangible result
- Supports the definition of all work required
- THE 100% RULE
- is a core characteric
- captures ALL deliverable deliverables
- includes 100% of the work
- defined by the project scope
- REPRESENTATION OF WBS
- EXAMPLE: CONSTRUCTION A BIKE
- COMMON USING TERMS
IMPORTANCE
- INTEGRATION WITH PROJECT MANAGEMENT PROCESSES
- WBS plays an integral role
- in other project management processes
- WBS plays an integral role
- RELATIONSHIP TO OTHER TOOLS
- PROJECT MANAGEMENT TOOLS
- PROYECT CHARTER
- takes the project charter as its starting point
- PROJECT SCOPE STATEMENT
- Describe
- PROGRAM AND PORTFOLIO WBS
- Can be used to define scope for projects, programs, and portfolios
- THE RESOURCE BREAKDOWN STRUCTURE
- In conjunction with the WBS
- to define work package assignments.
- In conjunction with the WBS
- ORGANIZATIONAL BREAKDOWN STRUCTURE
- Reinforces the guideline
- WBS DICTIONARY
- accompanies the WBS and carries critical project information
- PROJECT SCHEDULE NETWORK DIAGRAM
- is a sequential arrangement of the work defined by the WBS
- essential to uncovering project dependencies and risks.
- PROJECT SCHEDULE
- The various elements of the WBS
- are used as starting points
- for defining the activities
- are used as starting points
- The various elements of the WBS
- PROYECT CHARTER
- WPS DEVELOPMENT TOOLS
- Promote and enforce
- the principles of the WBS standard
- promote
- Consistency and Repeatability
- Reduce
- the development effort
- Promote and enforce
- PROJECT MANAGEMENT TOOLS
- WBS INTEGRATION AND USE BY OTHER STANDARS
- Identifies the WBS as a tool that can be used to develop a program WBS.
- The Standard for Portfolio Management
- The Standard for Program Management
- INTEGRATION WITH PROJECT MANAGEMENT PROCESSES
WBS QUALITY DEFINITION
- PRINCIPLES
- PRINCIPLE 1
- Satisfies all of the requirements for its use in a project
- Sub Principle 1
- Describe
- a set of 16 core characteristics
- that must be present in every WBS
- to satisfy project needs
- that must be present in every WBS
- a set of 16 core characteristics
- Describe
- Sub Principle 2
- Define
- a set of 7 use realated characteristics
- that can vary
- from one WBS to another
- that can vary
- a set of 7 use realated characteristics
- Define
- PRINCIPLE 2
- WBS quality characteristics apply
- at all levels of scope definition.
- differ only in
- the content
- the scope
- differ only in
- at all levels of scope definition.
- WBS quality characteristics apply
- PRINCIPLE 1
- PROBLEM DIAGNOSTIC CHECK LIST
- There are abou 7
- Project problem
- resulting from WBS keys defects
- Project problem
- There are abou 7
- EXAMPLE OF HIGH QUALITY
- LEVEL 1
- comprises the full scope of work
- necessary to produce the bicycle
- comprises the full scope of work
- LEVEL 3
- integration is decomposed
- into interim deliverables
- integration is decomposed
- LEVEL 2
- The first level of decomposition
- LEVEL 4
- testing into 3 descpmponent elements
- Customer test
- Component test is pre-assembly testing
- Product test is quality control and pre customer test
- testing into 3 descpmponent elements
- LEVEL 1
- PRINCIPLES
INTRUDUCTION
- OBJECTIVES
- to provide a common ground
- for understanding the concepts and benefits of the WBS
- to present a standard application
- of the WBS as a project management too
- to provide a common ground
- OBJECTIVES
Imagens e arquivos do mapa
Informações
- Descrição
- Mapa Mental sobre PRACTICE STADANDAR FOR WORK BREAKDOWN STRUCTURES, criado por Carla Sotil Chauca em 15-04-2018.
- Criado por
- Carla Sotil Chauca
- Visualizações
- 0
- Avaliação
Mais sobre Project Scope Management












