null
US
Entrar
Registre-se gratuitamente
Registre-se
Detectamos que o JavaScript não está habilitado no teu navegador. Habilite o Javascript para o funcionamento correto do nosso site. Por favor, leia os
Termos e Condições
para mais informações.
Próximo
Copiar e Editar
Você deve estar logado para concluir esta ação!
Inscreva-se gratuitamente
1404074
OSA
Descrição
Mapa Mental sobre OSA, criado por pedro.r.garcia em 03-10-2014.
Mapa Mental por
pedro.r.garcia
, atualizado more than 1 year ago
Mais
Menos
Criado por
pedro.r.garcia
mais de 11 anos atrás
28
1
0
Resumo de Recurso
OSA
EOS Tracker
Manufacturing OS
Lean Manager Trained
5S Implentation
Visual Control Implementation at machine / cell / group
SMED Workshop min 1 per quarter
Hoshin Workshop min 1 per quarter
Management Routine Daily Route
QRQC min 1 per quarter
Red Bin Review (daily)
Go 1st Part (daily)
TPM WS min 1 per quarter
Team Based Orga Flash Meeting
Value Stream Mapping Initial performed
MFG Connections
SM & Receiving Area
Receiving Window to balance workforce
FIFO Board or Visiual management (non IT) for A parts
Supermarket for purchased raw material
Delivery Routes
Raw material withdrawal KANBAN or visiual pull for delivery routes by small train or paletts moves
No small train only PULL process (KANBAN) Palette (metal strip)/ Octobins (Resin) move
SFG Production KANBAN small train Shop Stock
FG levelling KANBAN Small Train from shop stock
Leveling Board Kanban Card trigger Prod
Pick FG from production only which was planed inside our Leveling Board or IT system based on Prod Plan
IT system trigger FG Picklist!! Pick from shop stock(box) or palett at press but does not trigger the Production
Shipping Area
POOL to overcome the peaks and balance out customer demand and TPA space needs 1)Sleeping area 2)Excess area on last row marked RED
TPA process to open TOTEM / Truck Shipping Lane (TSL)
Shipping Window to balance the floorspace for TOTEM’s & HC
Customer Service OS
Demand Variation weekly Control vs. SCA or RFQ LT
Waterfall for premium responsibility
Order confirmation according agreement
Scheduling OS
Prod Plan for the upcoming 4 weeks (first week daily) on defined concept BTO or BTF on defined Lot size
Capacity Planning
MPS weekly to review and agree on Prod Plan
Schedule attainment daily review of over/under Production incl Action Plan
EPEI improvement Plan
Tools assigned to the Press
Managment Attainmnet report weekly
Daily attainment report Prod Plan vs. outbound entry
Weekly analysis of DOH per DPN inside the POOL Compare plant vs plant & region vs. region
Logistic & Ordering OS
Short Term by PUS Maker manual daily Milk Run for A parts
LEAN Ordering or Deljit ERP weekly Run for B & C parts
Term FC thru Customer FC incl long term capacity thru GTCP or demand management
Medium Term based on Prod Plan to upload into ERP and ordering raw material based on Prod Plan
EOS IMPLANTATION
Quer criar seus próprios
Mapas Mentais
gratuitos
com a GoConqr?
Saiba mais
.
Semelhante
Resumo ITIL OSA
Estevão Barbato
OSA Simulado Oficial
Estevão Barbato
Explore a Biblioteca