Mapa mental
SAB5#47_Monitoring-Controlling_Scope

Conteúdo do mapa
SAB5#47_Monitoring-Controlling_Scope
- TIP#1: Control Scope can happen at any time ( either before or after Validate Scope), because project changes can happen at any time. TIP#2: Validate Scope is usually the last Scope Management process that you’ll do in a project.
Work Performance Data
Scope BaseLines
Iterative
- Control Quality
- Validate Scope
- Monitor Project Work
- Close Project
Variance analysis
- Analyzing the difference between the baseline and the actual work to figure out if the plan needs to be corrected
Updating :
- 1.- Scope
- 2.- Plan BaseLine
- 3.- WBS info
- 4.- Work performance information
- 5.- Lessons Learned
- 6.- Project Management Plan
Project Management Plan
Requirement documentation
Requirements traceability matrix
Change requests
Monitoring & Controlling
Imagens e arquivos do mapa
Informações
- Descrição
- Certificacion SCOPE MANAGEMENT Mapa Mental sobre SAB5#47_Monitoring-Controlling_Scope, criado por Maria Gonzalez em 10-04-2015.
- Criado por
- Maria Gonzalez
- Visualizações
- 14
- Avaliação
