Ajude a dar forma ao GoConqr. O que a gente deve adicionar?

Mapa mental

Problems faced

Tahmid Ali Inglês

Conteúdo do mapa

Problems faced

  1. Major height difference in the group

    • Impact
      • Reduced the flexibility within the group. Since the height of the total station tended to be proportional to the individual sets up. Furthermore, due to obstacles within the site, taller total stations where a must. Therefore, accessibility to the equipment was impossible to certain members of the group
        • How was it overcome?
          • Task allocations where rearranged accordingly. This meant if someone was unable to use their total station, they would try to input their time somewhere else
            • Possible Improvements
              • More time should have taken during the survey reconnaissance. As more thought in choosing those point may have resulted in better placed total stations. Thus, making it more sutiable for other members in the group
  2. Balancing work from Task 1 and Task 2

    • Impact
      • Minimial time remaining to complete task 1 activities. Furthermore, due to the troubling recordings made in task 2,there was a possibility that task 2 may need to be repeated. Nethertheless, this was not the case but still was a major road block for task 1.
        • How was it overcome
          • At the time it was thought the best course of action would be to all work on task 2 together. The reason for this was due to the fact that it required at least two people due to the nature of task two (Task 2 comprised of two sections in the dam where two different type of measurements where made)
            • Possible Improvements
              • Greater planning in advance should have been made. This would have meant a more efficient timetable could have been prepared. In addition talking to groups who have done task 2 before, would have also been beneficial. This is due to the fact it would have resolved common misunderstanding thus reducing time spent on task 2 and allowing greater time for task 1.
  3. Delaying levelling

    • Impact
      • Detailing had to be delayed as a consequence. Furthermore, since it was delayed, team 8 could not ask a supervisor incase a problem was to occur. Furthermore, detailing is very difficult during the evening as readings are impossible to see without a flash light.
        • How was it overcome
          • This problem could not be dealt with straight away due to timing of the day. Therefore, it was delayed to tomorrow morning where team 8 asked the supervisor for a brief overview of leveling
            • Possible Improvements
              • Being honest with tasks by realising what prerequisite are required before beginning it. Essentially follow the moto "if it might happen, it will happen" will ensure tasks are carried out in a smoother fashion
  4. Constantly having to repeat the 3 peg test

    • Impact
      • It held back the teams progress. Also due to the shear number of repeats, the general moral of the group lessened, resulting in a decrease in the overall performance of the group
        • How was it overcome?
          • After a few repeats, team 8 stopped traversing and consulted each member for possible solutions. Job roles where also switched between members in the group to get a change of perspective. After exhausting all these measure, it was found that the prism constant was not changed. Once changed, we got a fairly accurate reading, from an error of 30mm to 2mm.
            • Possible Improvements
              • In hindsight, all problems experienced at the site have been mentioned within the lectures. Therefore, a possible suggestions may be to make a list of all common errors and bring it to the field. This should speed up the identification of mistakes, thus making it faster to solve problem.

Informações

Descrição
Mapa Mental sobre Problems faced, criado por Tahmid Ali em 12-06-2015.
Criado por
Tahmid Ali
Visualizações
1
Avaliação

Fale Conosco

Sobre o que é sua mensagem?

O que a gente deve adicionar?