Mapa mental
SAB7#62_Optimization Resources
Conteúdo do mapa
SAB7#62_Optimization Resources
Resource Leveling
- Leveling lengthnes the schedule and increases cost in order to deal with a limited amount of resources, resource availability and other resources constraints.
- Allows to level the peaks and valleys of the schedule.
- Balanced resources according to availability. Usually increase the critical path
Resource Smoothing
- The resources are leveled only within the limits of the float of their activities, so the completion dates of activities are not delayed.
- It doesn't change the critical path
- It doesn't have resources optimization
Find ways to adjust the use of resources
Informações
- Descrição
- Mapa Mental sobre SAB7#62_Optimization Resources, criado por anahi2306 em 12-08-2015.
- Criado por
- anahi2306
- Visualizações
- 31
- Avaliação