SAB7#09_PROJECT_LIFE_CYCLE

Oscar De la O PM - 000 a 055 Project Manager Professional Espanhol

Conteúdo do mapa

SAB7#09_PROJECT_LIFE_CYCLE

  1. A) Predictive Lyfe Cycle

    • Plan-Driven
      • Require, Scope, Scheduller and Cost, before the work begins to produce the project deliverables
      • Structure implementation and good analisis
  2. B) Iterative Life Cycles

    • Change-Driven
      • Will have varying levels of early planning for Scope, Scheduller and Cost
      • Allow preliminary of time and cost, Scope is developed with each interaction
  3. C) Incremental Life Cycle

    • Change- Driven
      • Allow preliminary of time and cost, Scope is develope with each interaction
      • Will have varying levels of early planning for Scope, Scheduller and Cost
  4. Life cycle life is a progression through a series of developmental stages

  5. D) Adaptive Life Cycle

    • Change-Driven
      • Tehe client Require Scope, Scheduller and Cost documented and priorized, these can be adjusted as the project progress
      • Involve fixed time and cost, the scope will be refined as the project progresess
  6. Life Cycles Types; Predictive, Interative, Incremental, Adaptive

  7. The Project Life Cycle Interacts with the Project Management Process

    • Initiating, Planning, Executing, Monitoring and Controling, Closing
      • Estos son Grupos de Procesos, no procesos
  8. The Life Cycle is what you need to do to do the work

  9. 1) Starting the Project ; Definitions & Scope

    • a) This need the Project Charter
  10. 2) Organizing and preparing the Project; Project management team selection, kick-off & Planning

    • b) Generate the Project Management Plan
  11. 3) Carrying out the Project Work; Execution, Monitoring & Control.

    • c) Carrying out the Work, accepted Deliverables
  12. 4) Closing the Project; Aceptance, Close-out activities, Post Support

    • d) Archived Project Documents

Informações

Descrição
Project Manager Professional PM - 000 a 055 Mapa Mental sobre SAB7#09_PROJECT_LIFE_CYCLE, criado por Oscar De la O em 21-08-2015.
Criado por
Oscar De la O
Visualizações
1
Histórico
  • Criado por gcabello50 · 21 ago 2015
  • Copiado por gcabello50 · 21 ago 2015
  • Copiado por Oscar De la O · 21 ago 2015
Avaliação

Mais sobre Project Life Cycle

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?