Sab9#43y44_Scope Levels_Category Requirements

Descrição

Mapa Mental sobre Sab9#43y44_Scope Levels_Category Requirements, criado por Jou M em 24-02-2016.
Jou M
Mapa Mental por Jou M, atualizado more than 1 year ago
Jou M
Criado por Jou M mais de 10 anos atrás
23
0

Resumo de Recurso

Sab9#43y44_Scope Levels_Category Requirements
  1. Scope Levels
    1. Activity
      1. These are the actions or tasks to be performed in a work package
      2. Work Package
        1. It consists of a set of activities or tasks to be performed
        2. Control Account
          1. it is made up of a set of work packages which analyzes the scope, time and cost to a higher level
        3. Category Requirements
          1. Business
            1. need for high level of the company
            2. Stakeholders
              1. need for a person or group
              2. Functional
                1. product performance
                2. Nonfunctional
                  1. environmental conditions required to produce the product
                  2. Transition
                    1. need to adapt to operate the product
                    2. Project
                      1. Processes and devices required to operate the project
                      2. Quality
                        1. criteria necessary to meet project requirements
                        2. Technical
                          1. Definition of how the product will be built