Carlisle flood defences

  1. General

    • With towns flood defences breached
      • Council to find out what why current defences had been inadequate and what needed to be done to limit damage in future
    • The lower Eden strategic and planning appraisal report was prepared to provide an overview of flood management within the wider catchment
    • As part of the strategic and planning appraisal, however a number of generic option or flood management were investigated and discounted for environmental and economic reasons
      • Do Minimum
        • Comprises only maintenance work to ensure no further deterioration in existing structures
          • Thereby sustaining sustaining persent level of flood defences
        • low cost approach assumes over long term, increased flooding would have significant adverse impacts:
          • Human beings
          • economy
          • heritage sites and all types of land use on the floodplain
      • Upstream storage
        • would involve the creation of larger- scale upstream storage reservoirs
          • E.g construction of a larger dam across the river Eden and the excavation at the M6
            • A dam at the M6 would require existing motorway embankment to be rebuilt as a dam structure, requiring temporary diversion of the motorway during its construction
              • The resulting reservoir would effectively double the extent of the existing 100 year flood outline upstream of M6 inundating areas like Low Crosby, Warwick Bridge and potentially Hadrian's wall
                • Estimated construction costs would exceed £300mill- impacts to SSSI
      • Upstream managed realignment
        • Involves moving existing line of flood defence back from the river to provide a larger area of natural floodplain storage
        • Hydraulic modelling demonstrated that the floodplains in the lower catchment are currently almost fully utilised during flood events
          • Even during low return period flood events; and in high return period events, given the volume of water that passes down the Eden,, the benefits would be few
  2. The Decision

    • Council had to balance need for effective flood defences with bearing costs and social and environmental impacts
    • Final appraisal determined that the do nothing/ minimal approach was not acceptable owing to the risk of property and lives.
    • The ambitious upstream storage option was ultimately rejected as it involved unsupportable economic and environmental costs without necessarily dealing with immediate flood risks to town
      • A decision was made to raise existing flood defences while at the same time effecting local realignment
        • This meant the setting back of existing defences on the River Petteril upstream of Butchery Bridge to create a larger storage area on the floodplain
          • These measures were identified as environmentally acceptable with the latter option providing more opportunity for environment enhancement
            • Therefore combined option was identified as the preferred option for eden and petrol flood risk area
  3. Additional financial measures

    • In 2005 council agreed to allocate the £1.5 million govt grant as follows
    • survey of flood- affected homes
    • £325,000 for uninsured vulnerable properties to make good any flood damage
    • £325,000 for insured vulnerable properties to make good any flood damage

Informações

Descrição
Mapa Mental sobre Carlisle flood defences, criado por Alex Skittles em 16-03-2016.
Criado por
Alex Skittles
Visualizações
0
Avaliação

Mais sobre Cumbria Floods

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?