T022 Design Economics

alison_patey0437 T022 & T074 Inglês

Mind map on design economics: estimating, cost planning, economics of design and sources of cost info

Mind map: Design economics

Conteúdo do mapa

T022 Design Economics

  1. NRM 1 Estimating

    • Purpose of an Order of Cost
      • relates to RIBA A/B & OGC Gateway 1 (business justification) 2 (delivery strategy)
        • RIBA A/ Gateway 1
          • identify clients needs - prepare feasibility
        • RIBA B/Gateway 2
          • iden. client brief/procurement method/ other consultants engaged
      • Est. proposed building project affordability
      • Est. a cost limit
        • Max expenditure a client is willing to make
      • May be a need for alternative scenarios = cost options
      • Information Required fro OofC
        • From Employer
          • location
          • statement of bdg use
          • life span
          • details of enabling wrks
          • initial design brief
          • requirements 4 refurb
          • floor areas
          • site conditions
          • budget/cashflow constraints
          • restraints e.g. planning/stat auth/listed bdg
          • other e.g. CA/ land remediation
        • From Architect
          • sketches e.g. floor plans/ elevation/ sections
          • Sch of areas e.g. GEA/ GIFA/ NIA
          • Min storey height/ sch accomodation
          • suggested ground conditions
          • indicative services
          • initial risks
      • Process of OofC
        • 1. facilitating wks est.
        • 2. Building wrks est.
        • 3. MC prelims
          • they define the scope of the works
          • inc. proj particulars, list of dwgs, des of site,
          • Preliminaries sections A54 - Prov sums; A10 Proj particulars
          • Considerations when assessing preliminaries
            • length of contract
            • location - access/ space res/ accomodation
            • type of proj: refurb/ new build/ large tower
            • size of proj
            • need 4 temp wrks
            • security
            • sectional completion
            • avalibility of services
        • 4. Sub total
        • 5. MC OH&P
        • 6. Works Cost Estimate total
        • 7. Proj/Design team fees
        • 8. Sub-total
        • 9. Other Dev/proj. cost est.
        • 10. Base cost est. total
          • Base Cost Estimate
            • total Bdg wks + MC prelims + MC OH&P + Prj/design fees + other dev est.
        • 11. Risk Allowances estimate
          • 4 nr risk allowances
            • design dev
            • construction risks
            • emp. change risk
            • emp. other risk
            • allowance 4 risk & inflation r calc seperatley + add 2 base cost 2 determine cost limit
        • 12. Cost Limit total (excl Inflation)
        • 13. Tender inflation est.
          • you review inflation through the use of TPIs
            • tender price index
          • TPI reflect changes in level of pricing in lowest accepted tenders for new wks 2 take account of market cond. - compares with base date
        • 14. Cost limit total (excl. construction inflation)
        • 15. Construction inflation est.
        • 16. Cost limit total (inc Inflation)
    • Measurement rules for Building Works
      • Floor area Method
        • Quants determined by measuring the GIFA
        • Measured & multiplied by an appropriate £/m2
        • c = a x b
        • a = GIIFA; b = cost/m2 of GIFA; c = Building cost estimate
        • GIFA in accordance with RICS code of measuring practice 6th ed
        • where building comprises of more than one bdg function = GIFA of each function calc seperately
          • you can then delineate party walls etc.
        • Ext wks measured separately as SA (Site Area)
      • Functional Unit method
        • units of measurement used to represent a prime use
        • each function inc necessary circulation space
        • Cost/ hotel rm; cost/ school child; cost/ hospital bed
        • c = a x b
          • a = no. of functional units; b = £/functional unit; c = building works estimate
      • Elemental method
        • alt approach 2 calc total est cost of bdg wks
        • considers maj elements and provides an OofC based on the breakdown of other similar buildings
        • cat. into group elements and elements
          • 0 - Facilitating works
          • 1 - substructures
            • ELEMENT: Substructure
          • 2 - superstructures
            • ELEMENT: frame/ U.floors/ roof/ stairs & ramps/ Ext walls/ Windows & ext doors/ Int walls & partitions/ Int doors
          • 3 - Internal finishes
            • ELEMENT: wall/ floor/ ceiling finishes
          • 4 - FF&E
          • 5 - Services
            • ELEMENT: Sanitary/ equip/ disposal/ water/ heat/ space heat & AC/ ventilation/ Electrical/ Fuel/ Lift/ Fire+lightning protection/ com, security & co
          • 6 - prefab bdgs
          • 7 - wks 2 ext bdg
          • 8 - ext wks
        • c = a x b
          • a = EUQ; b = EUR; C = cost target
        • used for RIBA C or OGC Gateway 3A
        • provides a basis of the formal cost plan 1
          • EQR/EUR s/s by more detailed measure of elements
    • Measurement Rules
      • MC prelims
        • added as a %
        • derived from a considered assessment of cost analyses of previous bdg proj.
        • subbies Prelims are normally inc into unit rates
        • A list of MC inc in part 9 of NRM 1
        • they define the scope of the work
      • MC OH&P
        • added as %
        • derived from a considered assessment of cost of previous bdg proj.
        • a list is inc in part 10 of NRM1
      • Proj/design fees
        • either inc/exl
        • list of fees in part 4 of NRM 1
        • added as a %
      • other dev/proj costs
        • e.g. insurances/ planning fees/ fees 4 party walls etc.
        • added as a lump sum
          • acertained in conjunction with client
      • Risk
        • risk exposure - as the design dev = more of proj defined & a risk response decided
          • risk avoidance
            • seriousness of risk consequences on proj is unacceptable
            • measures inc review of brief/ re-design
          • risk reduction
            • level of risk unacceptable
              • Action would be to reduce by: redesign/ further site investigation/ diff mat/ diff method of con/ change contract strategy
          • Risk Transfer
            • accepting risk would not be client value 4 money
              • transfer 2 a 3rd party
                • higher premium
                  • e.g. insurance cover
          • Risk Sharing
            • client retains some risk
          • Risk retention
            • risk retained by client = called residual risk
        • risk allowances should NOT be a % but a properly considered assessment of the risk taking in 2 account completeness of design + other uncertainties
          • Allowances should be made for the following
            • Design Development risk
              • e.g. planning/ legal/ covenants/ 3rd party risks
            • Construction Risk
              • e.g. site conditions/ access restrictions/ boundaries/ extg bdgs
            • Employer change risk
              • e.g. chg in scope/ quality/ time
            • Employer other risks
              • e.g. early handover/ acceleration/ avalibility of funding
            • allowance should be made based on formal analysis e.g. risk register and Monte Carlo simulations
      • Inflation
        • its possible to consider future effects of inflation on the base cost est. over a period of time
          • to date of tender
            • t = CL x p
            • p = % tender inflation (published indices TPI), BCI or retail price indices (RPI) or % derived from in-house sources
            • CL = cost limit; p = % for tender inflation; t = tender inflation estimate
          • mid-point of construction
            • c = CL x p
            • CL = cost limit (ex const infla); p = % 4 const infla; c = construction inflation est
      • VAT
        • is complex and recco excluded from OofC
  2. NRM 1 Cost Planning

    • Purpose of cost planning
      • intrinsic with RIBA C/D, E/F & OGC gateway 3A & 3B
        • RIBA stage C & Gateway 3A
          • concept: implement concept design and outline proposals 4 structural & building services, outline spec, formal cost plan 1
        • RIBA stage D
          • Design development: update design, planning, completion of brief
        • RIBA Stage E & Gateway3B
          • Technical Design: prep of tech design and spec 2 coordinate components and elements of proj & info for stat standards
        • RIBA Stage F
          • Production Info: prep info ready for tender
      • main purpose
        • ensure emp. are provided with value for money
        • make clients & designers aware of cost consequences of their desires/ proposals
        • provide advice 2 designers to help them arrive 2 practical designs withn budget
        • keep expenditure within cost limit
        • robust cost info which the client can use 2 make informed decisions
    • Elemental cost planning/ cost planning
      • budget breakdown of the cost limit into cost targets for each element
      • its a statement of how the proj team proposes to distribute the availible budget amougst the elements of the building
      • its an iterative process which is performed in steps of inc detail as design develops
    • Constituent of a cost plan
      • it takes the same shape as the cost estimate
    • Formal cost plan stages
      • formal cost plan 1 = RIBA stage c
      • Formal cost plan 2 = RIBA stage D
      • Formal cost plan 3 = RIBA Stages E & F
    • Cost control in procurement
      • CP become a important cost control mechanism when work is procured by the use of seprate wk pack
    • Reporting of elemental cost plans
      • cost expressed as £/m2
      • items in CP reports
        • 1. Exec summary/ prj title/ description/ status of CP
        • 2. statement of cost inc cost limit
        • 3. details of info/ spec on which CP was prepared/ statement of floor areas
        • 4. Cost Plan
        • 5. assumptions/ base date/ reason for change from previous CP
        • 6. VE options/ conclusion/ recommendations
        • 7. inclusions & exclusions
  3. State of the construction market

    • Trends and forecasts 2013
      • Tender price index
        • The second half of 2012 saw prices come under renewed pressure. 2013 little respite
      • Building cost index
        • Employers faced higher wage bills at the end of last year and will have to fund a small wage increase at the beginning of 2013
      • Retail price index
        • Higher utility costs caused retail prices to move back up. Higher food prices coming through will stop consumer price measures falling towards target.
      • Generally
        • 2012 ended with construction prices continuing their slide
        • Provisional fig 4 4thQ GDP = economic activity fell by comparison with 3rdQ, = Speculation trple dip recession (NB* confirm narrow avoidance)
        • Deloitte CFO survey 2013: market has cautious optimism
        • The Bank of England held interest rates at 0.5% since 03/09 & some suggest they will stay until 2017.
        • The Autumn Statement 12/12 recog need 2 restore capital spending & announced an add £5bn of investment for roads, rail and edu
        • Infrastructure pipeline: 550 projects est. @ £330 billion to 2015
          • An xtr 50 proj compared 2 2011 & £70m
          • problem: gov think 85% will be privately funded
        • BofE 4thQ Credit survey: banks offereing more cheaper credit due to the funding 4 lending scheme
          • downside: bank reduced interest on savings - no need 2 attract savers money
        • Construction products Assoc: lowered expectations of construction output 4 2013/14
          • trimmed by more than 4%
        • The recently released Construction Skills annual report does not anticipate a return to the 2007 levels of construction activity until 2022.
        • competition will remain intense keeping a lid on underlying cost inc
        • A prediction of MC turning down works due to slim est depart - picking job 2 put effort into rather than buying jobs at a loss
        • Material cost increases are likely to remain subdued in 2013
        • EUROPE
          • (IMF) forecasting a further small contraction (-0.2%) for the Eurozone, before achieving a small 1.0% inc
        • GLOBAL
          • Global economy: stabilise in 2013; Global economic growth not expected 2 pick but neither slow again.
          • weak Eurozone & slow Japan offset US growrh
          • US should pick up if uncertainty of fiscal cliff & debt reduction is resolved
          • China: regain momentum in 13 & surpass 8% growth
          • Emerging market construction growth to lead the industry
            • construction demand is likely to be highest in high risk areas, including Latin America, Africa and the MENA region.
  4. Economics of design

    • Wall: Floor ratio
      • relationship between wall and floor
      • Shows efficiency of a bdg
      • Lower the ratio = cheaper the bdg
    • The most efficient bdg shape is a circle but has poor lettable area = square is best
  5. Sources of cost info

    • In-house historical data
    • BCIS
    • Cost indices
    • cost analyses published in trade journals
    • Price books SPONS/LAXTONS
    • Building cost models
    • Sub-contractors & Suppliers

Informações

Descrição
T022 & T074 Mapa Mental sobre T022 Design Economics, criado por alison_patey0437 em 27-04-2013.
Visualizações
259
Avaliação

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?