MATERIAL REQUIREMENTS PLANNING

  1. MRP

    • A system used to plan and control
      • Production
      • Material flow
        • Based on the fact that demand for materials, components, and parts depends on the demand of the final product
    • MPS
      • Specifies when a finish product must be assembled for delivery
    • INVENTORY STATUS FILE
      • Record of current inventory level of each part and item
      • lead times
    • BOM
      • Information about parts (relationship with sub assemblies/finish product, quantity need per part)
    • DRIVEN BY CHANGE
      • MRP consider lead-time of each part
      • Thanks to modern software it can be updated weekly/ daily as required
      • Can correct data if it was wrong
    • ADVANTAGES
      • Keeping priorities straigh
        • Frees up time and capacity for other jobs
        • Prevents problems like the “hurry up and wait”
        • Rescheduled deliveries for purchased parts
      • Keeping inventory low
      • Early warning
        • Show us if we can produced for the promised date
        • Allow to warn the customer for a delay
      • Long-range planning

Informações

Descrição
Mapa Mental sobre MATERIAL REQUIREMENTS PLANNING, criado por Maria Magdalena Canseco em 13-10-2016.
Criado por
Maria Magdalena Canseco · out 2016
Atualizado
14 out 2016
Visualizações
1
Avaliação

Mais sobre Material Requirements Planning

Fale Conosco

Sobre o que é sua mensagem?

O que a gente deve adicionar?