  1. Configuration Management System

    • A subsystem of the overall project management system. It is a collection of formal documented procedures used to apply technical and administrative direction and surveillance to: identify and document the functional and physical characteristics of a product, result, service, or component; control any changes to such characteristics; record and report each change and its implementation status; and support the audit of the products, results, or components to verify conformance to requirements. It includes the documentation, tracking systems, and defined approval levels necessary for authorizing and controlling changes.
    • collection of formal documented procedures used to apply technical and administrative direction and surveillance to:
      • identify and document the
        • functional and physical characteristics of a product,
        • result,
        • service,
        • or component;
      • control any changes to such characteristics;
  2. Work Authorization System

    • A subsystem of the overall project management system. It is a collection of formal documented procedures that defines how project work will be authorized (committed) to ensure that the work is done by the identified organization, at the right time, and in the proper sequence. It includes the steps, documents, tracking system, and defined approval levels needed to issue work authorizations.
    • It is a collection of formal documented procedures that defines how project work will be authorized (committed) to ensure that
      • the work is done by the identified organization,
      • at the right time,
      • and in the proper sequence.
  3. Change Control System

    • A set of procedures that describes how modifications to the project deliverables and documentation are managed and controlled.
    • A set of procedures that describes how are managed and controlled.
      • modifications to the project deliverables
      • and documentation
  4. Project Management Information System

    • An information system consisting of the tools and techniques used to gather, integrate, and disseminate the outputs of project management processes. It is used to support all aspects of the project from initiating through closing, and can include both manual and automated systems.
    • An information system consisting of the tools and techniques used to
      • gather,
      • integrate,
      • and disseminate
        • the outputs of project management processes. It is used to support all aspects of the project from initiating through closing, and can include both manual and automated systems.

Imagens e arquivos do mapa

  • SAB2#34 Detalles de PMIS
  • SAB2#34 Detalles de PMIS
  • SAB2#34 Detalles de PMIS
  • SAB2#34 Detalles de PMIS

Informações

Descrição
Mapa Mental sobre SAB2#34 Detalles de PMIS, criado por Gerardo Rodríguez em 02-08-2014.
Visualizações
25
Avaliação

Mais sobre Organizational Influences on Projects

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?