Contracts

  1. Essentials of a valid contract

    • 1. Intention to create legal relations
    • 2. Consideration
    • 3. Agreement = offer + acceptance
  2. Types of Contract

    • Traditional
      • 1. Fixed price/lump sum
        • Simple projects
        • Traditional methods of tendering
        • Client requires total control of costs
      • 2. Measurement
        • Approximate BoQ used then remeasured at completion
      • 3. Cost reimbursement
        • Work goes ahead on basis of labour and materials and a target cost is aimed for
      • Kidderminster and LMH
    • Design and Build
      • Contractor designs and builds, designer is often novated to the contractor
      • Disadvantages
        • Quality of design can be sacrificed
        • Cost reductions
        • Employer's Requirements need to be sturdy
        • Landscape design can be done by sub-contractors!
      • Advantages
        • Single point of responsibility
        • Final cost virtually guaranteed
        • Fewer claims
      • CUBRIC
    • Management
      • Client needs speedy completion of project
      • Management contractor works alongside design team but does not carry out the work
      • Works are let to specialist sub-contractors
    • Partnering
      • Large multidisciplinary projects
      • Joint venture, consortia, alliance, project/strategic partnering, PPP, PFI, D+B finance + operate
      • All parties collaborate
      • Grangegorman
      • Commitment to cost reduction
      • Can begin earlier than tender stage or at construction stage
      • Team works for contractor or developer
      • Client seeks tenders through OJEU and usually selects three teams to bid for the contract
  3. Contract Documents

    • 1. Agreement
      • Parties
      • Recitals
      • Articles
      • Witnesses
    • 2. Specification (qualitative)
    • 3. Schedules or Bills of Quantities (quantative)
    • 4. Drawings (illustrative)
    • 5. Conditions of Contract
  4. Forms of Agreement

    • JCLI
      • Works
      • Maintenance Works
      • Home Owners and Occupiers
      • Works and Maintenance combined
      • Works with Contractor's Design
    • JCT (Joint Council of Tribunals)
      • Standard Building Contract (SBC)
      • Design and Build
      • Intermediate (IC)
      • Minor Works (MW)
      • Major Projects (MP)
      • Framework Agreements (FA)
      • Measured Term Contract (MTC) - Maintenance
    • GC Works (Government Contracts)
      • Government/Local authorities now prefer NEC
    • NEC (New Engineering Contract)
      • Non-adversarial approach to contracts
      • Encourages the team to work together
    • Infrastructure Conditions of Contract 2011 (ICC formerly ICE)
      • Predominantly used for civil engineering projects
    • Engineering and Construction Short Contract (ECSS)
  5. Why are standard forms important?

    • 1. Certainty: required performance is known and clearly stated
    • 2. Standardisation: enables contractors and professionals to be familiar with the rules laid down and therefore saves time and avoids confusion
    • 3. Suited for Purpose: each form of agreement has been designed for particular types of project

Informações

Descrição
Tendering and Contracts Mapa Mental sobre Contracts, criado por katedesilva em 01-09-2014.
Criado por
katedesilva
Visualizações
12
Avaliação

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?