constructive process of a dwelling

  1. step one

    • site preparation
      • ·a backhoe and an excavator are used to clean the site
        • ·the site is leveled and wooden forms are placed to serve as a template for the foundation and dig holes and trenches.
          • ·Footings are installed
            • ·Once the concrete is poured into the holes and ditches, it will take time to heal.
              • . Once the concrete is cured, it is installed drains, sewers, water taps and any plumbing that must enter the first floor slab
  2. step two

    • complete the approximate framing of the house
      • The floors, walls and roof systems are completed. The cladding is applied to the exterior walls and roof. doors and windows are installed, The coating is covered with a protective barrier
  3. step three

    • Complete the plumbing, electricity
      • Once the frame is finished, the coatings and ceilings can be installed
        • Sewer and ventilation lines are installed, as well as water supply lines for each accessory
          • HVAC ventilation pipes are installed through the roof
            • Then, an electrician installs receptacles for electrical outlets, lights and switches,
              • Keep in mind that HVAC ducts and plumbing are usually installed before wiring
  4. Step four

    • install insulation a more confortable consistent indoo climate, are insulated in all exterior walls,attic,and any floors that are located above
  5. step five

    • Complete with drywall and interior textures
      • complete dryall start exterior finished start exterior finished drywall is hung and taped and drywall texturing is completed the primer coat of paint is also applied
  6. step six

    • Complete the interior trim
      • install exterior driveways and walkways interior doors base boards, door casings, window sills, walk ways and patios are formed at this stage
  7. step seven

    • Ceramic tiles, vinyl and wooden floors are installed
  8. step eight

    • installation of bathroom accessories luminaires, electrical outlets and switches and the electrical panel is completed. Washbasins, toilets and faucets are placed.
  9. step nine

    • installation mirrors, shower doors and carpets. Trees, shrubs and grass are planted and other exterior gardens are completed.
  10. step ten

    • the builder will guide you through your new home to familiarize you with its features and the operation of various systems and components

Informações

Descrição
Mapa Mental sobre constructive process of a dwelling, criado por erika niampira em 04-12-2018.
Criado por
erika niampira
Visualizações
0
Avaliação

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?