work break down structure
- break project into pieces PBS come before wbs it is about breaking product into outputs needs to complete project
why WBS ?
- 1-break project into managable piece 2-provide way to estimate cost make sure no important deliverables are forgotten
WBS Inputs
- project scope statment of requirements organizational process assest
wbs outputs
- glossary of terms
- wbs dictionary
Component of WBS
- WBS element
- Work Package
- too big package loose control in the project too small package conume alot of efforts
- WBS code number
- unique identifer for each element
- WBS dictionary
- defention of each work package
- level of effort
- upper levels
- major delverables
- lower level
- ganular level activities
- upper levels
- glossary of terms
wbs formats
- outline form hirachical structure table form graphical view
التغييرات اللى ممكن تحصل فى المشروع
- new technology requirement of new features unidentified assumption
Informações
- Descrição
- Mapa Mental sobre work break down structure, criado por bola.hanna55 em 31-12-2014.
- Criado por
- bola.hanna55
- Visualizações
- 5
- Avaliação
Mais sobre Work Breakdown Structure