IA- static methods

  1. Cost comparison method

    • answers to: 1. which project should be realized & 2. what is the optimal replacement time for an already realized asset
    • choose the one with lowest costs!!!
    • calculate total costs: variable costs + fixed costs
    • depreciation: initial outlay/economic life
    • Average tied-up capital: initial outlay/2 (for calculating interest)
    • fixed costs= capital costs
    • if investment sold after the economic life- liquidation!!!
      • depreciation: (initial outlay - liquidation value)/ economic life
      • ATC: (initial outlay + liquidation value)/ 2
    • critical quantity =volume of production which leads to equal costs
      • fixed c + variab/unit *x = fixed c. + variab/unit *x
      • lower fixed costs = lower costs before critical quantity
      • higher fixed costs = lower costs after critical quantity
  2. basics

    • values represented through costs and revenues
    • average value of a representative period (not the whole economic life
    • time value of money not considered
  3. profit comparison method

    • target measure: average annual profit (profit/period)
      • average annual profit: annual revenue - annual total costs
    • absolute profitability = profit greater than zero
    • relative profitable = the one with the higher profit
    • critical quantity of output
      • leads an equal profit of both alternative investment projects
      • (revenue/unit- variable cost/unit)* x - fixed costs = (rev./u-var.cost/u)* x -fixed cost)
    • evaluation of the model
      • acknowledges the fact of different revenues
      • allows individual project evaluations
      • impossible to allocate revenues to the projects
      • usage of average values is questionable
      • investment assessed only according to the realized profit
  4. average rate of return

    • target measure is the average rate of return
      • = ((average profit + average interest)/ ATC) *100
    • can be used for a single investment or to compare
    • absolute profitability= average rate of return higher than a given %
    • relative profitability= investment leads to a higher ARR than alternative investment project
    • risk premium!! add to the fixed interest
  5. static payback period method

    • target measure is the time it takes to recover the capital invested to the project
    • payback period = initial outlay + (if so) liquidation value/ average annual cash flow
    • absolute profitability= payback period is shorter than the target length of time
    • relative profitability= investment project has a shorter payback period than alternative investment project
    • result in years!!
    • equity financed--> add interest!!!
      • profit + depreciation + interest = average annual cash flow)
    • debt financed: average annual cash flow = profit + depreciation
    • evaluation of the model
      • advantage: provides some indication of the risk
      • disadvantage: excludes profits and cash flows after the payback beriod
      • disadvantage: can't be used for evaluation of long-term assets, difficult to determine an objective acceptable payback period