O GoConqr está de visual novo! Conte para nós o que você achou.

Mapa mental

Top down v/s Bottom up budgeting

Shahid Musthafa ACCA F5: Performance Management Master Inglês

Conteúdo do mapa

Top down v/s Bottom up budgeting

  1. Top down Budgeting

    • A budget planning strategy where cost estimates are generated by working from the highest level downwards. In top-down budgeting, a cost is typically put on each unit of raw materials, services or labor required for the project, and the estimated number of units is then converted into a monetary sum to produce the overall cost estimate to be used by the business. Opposite of bottom-up budgeting.
      • A top down budget is a budget that is set without allowing the ultimate budget holder to have the opportunity to participate in the budgeting process.
  2. Bottom up budgeting / Participative

    • A bottom up budget is a system of budgeting in which budget holders have the opportunity to participate in setting their own budgets. Also called participative budgeting.
    • Advantages
      • Increased motivation due to ownership of the budget
      • Should contain better information since employees most familiar with the department set the budget thus the budget will be more technical and accurate
      • Increases manager's understanding and commitment.The line managers can improve thier budgeting and visionary skills
      • Better communication and coordination between departments thus it will lead to a sense of teamwork
      • saves time of high level executives so that Senior managers can concentrate on strategy and other productive functions
    • Disadvantages
      • Senior managers may resent loss of control
      • Dysfunctional behaviour: budgets may not be in line with corporate objectives as managers lack a strategic perspective and will focus on divisional performance
      • May lead Bad decisions from inexperienced managers
        • Operational managers may not have the knowledge and experience to set a budget. For example, in a small business only the owner may be involved in all aspects of the business and may therefore set the budget.
      • Budget preparation is slow and disputes can arise
        • In times of crisis there may be insufficient time to set a participative budget and targets may have to be imposed to ensure survival.
        • Pseudoparticipation, where senior managers seek the opinions of the ultimate budget holders but do not act on these views, may lead to demotivation.
      • high possibility of Budgetary slack: managers set targets that are too easy to achieve.

Informações

Descrição
Master ACCA F5: Performance Management (C:Budgeting) Mapa Mental sobre Top down v/s Bottom up budgeting, criado por Shahid Musthafa em 18-09-2013.
Criado por
Shahid Musthafa
Visualizações
188
Avaliação

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?