  1. Line base Time

    • schedule approved
    • defined as the costs will be incurred
    • resources and their durations
  2. Line base costs

    • Approved budgets for implementing and monitoring
    • not including the contingency reserve
  3. line base scope

    • project scope statement
      • Description of the product
      • Criteria of acceptance
      • assumptions and exceptions
    • wbs
      • relationship between components and deliverables
    • diccionario wbs
      • detailed information deliverables
      • job description of each component

Imagens e arquivos do mapa

  • SAB#71_Line_Base_Performance_Measurement
  • SAB#71_Line_Base_Performance_Measurement
  • SAB#71_Line_Base_Performance_Measurement

Informações

Descrição
Mapa Mental sobre SAB#71_Line_Base_Performance_Measurement, criado por jmedinapizano em 19-08-2015.
Criado por
jmedinapizano
Visualizações
23
Avaliação

Fale Conosco

Sobre o que é sua mensagem?

O que a gente deve adicionar?