O GoConqr está de visual novo! Conte para nós o que você achou.

Mapa mental

Partitions, Ceilings & Render

tmgammon Phase 3 Foundation Degree Inglês

Partitions, Ceilings & Render

Conteúdo do mapa

Partitions, Ceilings & Render

  1. Rendr Finishes

    • DPC
    • Openings
    • Expansion
  2. Internal Finish

    • Dry Lining
      • Advantages
        • Speed of erection
        • reduced water in construction
        • Increased thermal / acustic properties
        • reduced drying time for follow on trades
        • Reduced skill level
      • Dis advantages
        • carefull storage to protect materials from moisture
        • Heavey Large sheets require carefull handling
    • Wet Plaster
      • Advantages
        • Hygenic easy clean no dirt traps
        • Thermal sound and vapour insulation properties
        • decorative or can be decorated
      • Disadvantages
        • Requires skilled tradesman for good finish
        • Slow dry time / requires layers
        • requires water to mix
  3. Suspended ceiling

    • A ceiling hung at a distance from the floor or roof above and not bearing on the walls
      • Functional requirements
        • Appearance
        • weight
        • Accessibility
        • Thermal Insulation
        • Sound Control
        • Durability and Maintenance
        • Fire Precautions
      • Types
        • Jointless System
        • Frame Panel Systems
        • Linear Strip
        • Louvre & Open strip
        • Integrated Services
  4. Stud work

    • Timber
      • Advantages
        • Lightweight
        • Can be very strong
        • Adaptable
        • readily available materials
        • reasonably quick and easy to erect
        • services laid in cavities
      • Disadvantages
        • Good finish requires skilled labour
        • Not easily re - located
        • Specific design required to provide
          • Fire resistance
          • Sound resistance
          • thermal resistance
    • Metal
      • Advantages
        • Very lightweight
        • simple & quick to erect
        • very adaptable
        • services laid in cavities
        • easily adapted to give good
          • Thermal resistance
          • Fire resistance
          • Sound Resistance
      • Disadvantages
        • may Require skilled labour
        • non load bearing
        • Availability of materials
        • Not easily relocated
        • Increased weight when using layered system
  5. Render Process

    • Method Statement
      • 1 RAMS
      • 2 Scaffold / Access platform?
      • 3 Clean Down
      • 4 Suction Test
      • 5 Screed / Beeding
      • 6 Stipple Coat ?
      • 7 Test render mix
      • 8 Dubb out ?
      • 9 Under coat
        • Screed
        • Key
        • Cure
      • 10 Final Coat
        • Thrown
          • Tyrolean gun
          • Pebble dash
        • Trowel
          • Wooden
          • Metal

Imagens e arquivos do mapa

  • Partitions, Ceilings & Render
  • Partitions, Ceilings & Render
  • Partitions, Ceilings & Render
  • Partitions, Ceilings & Render
  • Partitions, Ceilings & Render

Informações

Descrição
Foundation Degree Phase 3 Mapa Mental sobre Partitions, Ceilings & Render, criado por tmgammon em 06-09-2015.
Criado por
tmgammon
Visualizações
1
Avaliação

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?