MATERIAL REQUIREMENTS PLANNING
Conteúdo do mapa
MATERIAL REQUIREMENTS PLANNING
MRP
- A system used to plan and control
- Production
- Material flow
- Based on the fact that demand for materials, components, and parts depends on the demand of the final product
- Production
- MPS
- Specifies when a finish product must be assembled for delivery
- INVENTORY STATUS FILE
- Record of current inventory level of each part and item
- lead times
- BOM
- Information about parts (relationship with sub assemblies/finish product, quantity need per part)
- DRIVEN BY CHANGE
- MRP consider lead-time of each part
- Thanks to modern software it can be updated weekly/ daily as required
- Can correct data if it was wrong
- ADVANTAGES
- Keeping priorities straigh
- Frees up time and capacity for other jobs
- Prevents problems like the “hurry up and wait”
- Rescheduled deliveries for purchased parts
- Keeping inventory low
- Early warning
- Show us if we can produced for the promised date
- Allow to warn the customer for a delay
- Long-range planning
- Keeping priorities straigh
- A system used to plan and control
Informações
- Descrição
- Mapa Mental sobre MATERIAL REQUIREMENTS PLANNING, criado por Maria Magdalena Canseco em 13-10-2016.
- Criado por
- Maria Magdalena Canseco · out 2016
- Atualizado
- 14 out 2016
- Visualizações
- 1
- Avaliação
Mais sobre Material Requirements Planning