Mapa mental
sabPMS#66_67_Planning_Cost_Management
Conteúdo do mapa
sabPMS#66_67_Planning_Cost_Management
- Process: Plan Cost Management Process Group: Plannig Knowledge Are: Cost Management
Life Cycle Costing
- Cost over the entire life of the product no just the cost over the project
Control account
- Level of WBS to estimate and control cost
- It´s higher than the work package level
Value Analysis (value engineering)
- Find de less cost way to do the same scope. "How can we decrease cost on the Project while maintening the same scope
Cost risk
- Involves risk, procurement and cost management
- Implies cost related risk
Cost Management Plan
- Busget plan or Budget Management Plan
Required thinking about how you will control cost
Analitical techniques
- Present Value
- Present discounted value, is the value of an expected income stream determined as of the date of valuation
- Payback Period
- The length of time required to recover the cost of an investment
- Internal rate of return
- Metric used in capital budgeting measuring the profitability of potential investments
- Return of investment (ROI)
- Mesure the potential profitability of an investment by calculating the benefits recived in relations of the cost
- Discounted cash flow
- To estimate the attractiveness of an investment by predicting how much money will be recived in the future and discounting it to its current value
- Present Value
Involve determining wheter the proyect will be paid with existing founds or wil be founded
Include decisions about how to finance Project resources
Project Charter
- Financial restrictions, Budget
Organizational process assets
- Exchange rate , market up´s
Project Management Plan
- schedulle and scope baseline
EEF´s
Expert Judgment
Meetings
Part of the Project Management Plan
May include:
OPÁ´s
- Financial costs procedures, historial info, financial DB
Imagens e arquivos do mapa
Informações
- Descrição
- Mapa Mental sobre sabPMS#66_67_Planning_Cost_Management, criado por Carmen Mota em 29-10-2016.
- Criado por
- Carmen Mota · out 2016
- Atualizado
- 12 jan 2017
- Visualizações
- 5
- Avaliação
Mais sobre Cost Management Planning