Facade Retention

  1. Valid Engineering option for

    • Historic/ Listed Buildings
      • Conservation Areas
        • Public face/ Townscape value
  2. Detaching facade from structure

    • Can it support its own weight?
    • Surgeons cuts. taking out cross walls
    • Temporary retention located externally or internally
  3. Four Phases

    • Erection of support frame
      • Raking shores- triangulated braced supports
    • Connections to wall
      • Horizontal bracing
      • Internal cross bracing
    • Demolition of existing structure
    • Construction of new structure
  4. Issues with retention

    • Differential settlement
      • Connections need to allow for some movement as the new construction takes time to settle causing issues
    • Access for construction severely restricted with internal retention system
    • Problems installing the system before demolition can occur
  5. External retention

    • Much better option
    • Encroach on pavement/ road
    • Health and safety of public
    • Can be reduced if frames allow walking underneath
    • Proprietary system
      • Easy to install
  6. What to check for

    • Appraisal
      • Are there defects internally/externally
      • Is the facade loadbearing or is it the main support for the building a structure frame
      • Have remedial works been undertaken previously
    • New frame will have to be designed accordingly if facade bows or tilts
  7. Structural issues

    • 3 sides can be removed without effecting stability of remaining facade
    • In older buildings external walls are often loadbearing and are tied together by the floors
    • If you remove the floors the walls are liable to collapse as loads are transmitted to foundations from the floor and roof via the external walls
      • The new frame must take the structural loads from the building, independant of the facade
  8. Types of retention

    • Scaffolding- Used for low level facades 3-4 storeys
    • Proprietary- higher facades, props, ties, braces
    • Fabricated steelwork- Used when cost of proprietary is too much

Informações

Descrição
Mapa Mental sobre Facade Retention, criado por Luke McKenna em 02-01-2017.
Criado por
Luke McKenna
Visualizações
0
Avaliação

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?