Unit 203 Revision: Installation Technology Question Bank No.1

Usuário eliminado 40 perguntas Atualizado em 24 jan 2019

Fazer o quiz

Perguntas do quiz (40)

  1. 1A BS3036 protective device is aImagem da pergunta 1
    1. ARewireable fuse
    2. BCartridge fuse
    3. CType B MCB

    4. DType C MCB
  2. 2A circuit supplying kitchen appliances would be identified asImagem da pergunta 2
    1. AHeating
    2. BCooker
    3. CLighting
    4. DPower
  3. 3A circuit to supply hot water would be identified asImagem da pergunta 3
    1. AFloor warming installations
    2. BHeating
    3. CPower
    4. DMotor
  4. 4A common method of providing protection by fault protectionImagem da pergunta 4
    1. AADS (Automatic disconnection of supply)
    2. BEnclosures
    3. CPlacing out of reach
    4. DInsulation
  5. 5A method of protection against electric shock is provided in a cable by
    Imagem da pergunta 5
    1. ARCDs
    2. BBarriers
    3. CAutomatic Disconnection of Supply (ADS)
    4. DInsulation
  6. 6A work plan for new installations provides:Imagem da pergunta 6
    1. ACost of materials
    2. BEstimates of timescale
    3. CSafety information
    4. DInstructions for all workers
  7. 7A requirement for safety that all installations should have isImagem da pergunta 7
    1. AOvercurrent protection
    2. BEnergy meter
    3. CFire alarm
    4. DIndication of supply failure
  8. 8A short circuit occurs Imagem da pergunta 8
    1. ABetween two conductors on the same phase
    2. BBetween two conductors at different potential
    3. CBetween two conductors at the same potential
    4. DIn a circuit that is electrically sound
  9. 9A single pole switch breaks Imagem da pergunta 9
    1. AThe line and neutral conductors
    2. BThe neutral conductor
    3. CThe circuit protective conductor
    4. DThe line conductor
  10. 10A typical system application for fibre optic cable is:Imagem da pergunta 10
    1. AFire alarms
    2. BData communications
    3. CEmergency management
    4. DEnvironmental control

Informações

Descrição
C&G 2365 Level 2 Unit 203 Revision OB
Autor
Usuário eliminado
Idioma
English
Visualizações
168
Histórico
Criado em 24 jan 2019 · atualizado em 24 jan 2019

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?