3DX7X Volume 2 URE

Questão 1 de 70

1

Which deployment planning process develops predetermined responses to potential crises, determines forces required to achieve objectives, prepares deployment plans, and continually evaluates selected courses of action (COA)?

Selecione uma das seguintes:

  • Deliberate planning.

  • Crisis action planning.

  • Mobilization planning.

  • Force rotational planning.

Explicação

Questão 2 de 70

1

Which War and Mobilization Plan (WMP) volume provides a consolidated reference source for general policies and guidance for mobilization planning and the support of combat forces in time of war?

Selecione uma das seguintes:

  • Volume 1.

  • Volume 2.

  • Volume 3.

  • Volume 4.

Explicação

Questão 3 de 70

1

Who initiates the requirements or deployment sourcing process?

Selecione uma das seguintes:

  • Air Force Personnel Center (AFPC) Aerospace Expeditionary Forces (AEF) Center.

  • Installation Deployment Officer (IDO).

  • Unit Deployment Monitor (UDM).

  • Joint Staff.

Explicação

Questão 4 de 70

1

Which type of Joint Expeditionary Tasking (JET) tasking is a service providing a force or capability in place of another service’s core mission?

Selecione uma das seguintes:

  • Standard unit type code (UTC).

  • Joint force/capability.

  • In-lieu-of (ILO).

  • Ad hoc.

Explicação

Questão 5 de 70

1

Which of these is not an area measured and reported by Status of Resources and Training System (SORTS)?

Selecione uma das seguintes:

  • Training.

  • Personnel.

  • Facility condition.

  • Equipment condition.

Explicação

Questão 6 de 70

1

Which of the following is not a readiness category measured by Air and Space Expeditionary Force Reporting Tool (ART)?

Selecione uma das seguintes:

  • Training.

  • Personnel.

  • Home station mission.

  • Equipment condition.

Explicação

Questão 7 de 70

1

The Governing guidance for Air and Space Expeditionary Force Reporting Tool (ART) reporting is AFI

Selecione uma das seguintes:

  • 10–201.

  • 10–244.

  • 10–401.

  • 10–403.

Explicação

Questão 8 de 70

1

Which document provides detailed information and instructions on Designated Operational Capability (DOC) statements?

Selecione uma das seguintes:

  • AFI 10–201.

  • AFI 10–244.

  • AFI 10–401.

  • AFI 10–403.

Explicação

Questão 9 de 70

1

Who develops logistics details (LOGDETS) to allow for 30 days of sustainment for unit type codes (UTC)?

Selecione uma das seguintes:

  • Pilot Units

  • Joint Planners.

  • Logistics Readiness Squadron.

  • Each unit is responsible for building its own LOGDET.

Explicação

Questão 10 de 70

1

Which is not an initial capability of the open the airbase force module?

Selecione uma das seguintes:

  • Force protection.

  • Airfield operations.

  • Force accountability.

  • Explosive Ordinance Disposal (EOD).

Explicação

Questão 11 de 70

1

The key capabilities for establishing control in the Command and Control module are

Selecione uma das seguintes:

  • force protection and logistics.

  • intelligence and force protection.

  • secure communications and intelligence.

  • secure communications and force accountability.

Explicação

Questão 12 de 70

1

Which force module facilitates integration of open the airbase and command and control force module capabilities to enable the airfield to generate air support to accomplish its assigned mission?

Selecione uma das seguintes:

  • Robust the airbase.

  • Operate the airbase.

  • Establish the airbase

  • Generate the mission.

Explicação

Questão 13 de 70

1

Within how many days after open the airbase does the operate the airbase force module arrive, and when is delivery estimated to be complete?

Selecione uma das seguintes:

  • 2 days, 7 days.

  • 2 days, 14 days

  • 7 days, 14 days.

  • 14 days, 30 days.

Explicação

Questão 14 de 70

1

Which force module contains support forces that would generally not arrive until 30 days after the deployed location is established?

Selecione uma das seguintes:

  • Generate the mission.

  • Establish the airbase.

  • Operate the airbase.

  • Robust the airbase

Explicação

Questão 15 de 70

1

The Contingency Response Wing headquarters is located at

Selecione uma das seguintes:

  • Scott AFB, IL.

  • Travis AFB, CA.

  • Peterson AFB, CO.

  • Joint Base McGuire-Dix-Lakehurst, NJ.

Explicação

Questão 16 de 70

1

What is the typical pay grade of the deployed Contingency Response Group commander?

Selecione uma das seguintes:

  • O–4

  • O–5.

  • O–6.

  • O–7.

Explicação

Questão 17 de 70

1

Which force module supported by Theater Deployable Communications (TDC) is established within 48 hours and supports 50 to150 users in a café environment?

Selecione uma das seguintes:

  • Command and control.

  • Operate the airbase.

  • Robust the airbase.

  • Open the airbase.

Explicação

Questão 18 de 70

1

In the operate the air base module, what is the maximum distance an extended site can be located from the base Network Control Center Deployed (NCC-D)?

Selecione uma das seguintes:

  • 2 kilometers (km).

  • 4 km.

  • 8 km.

  • 16 km

Explicação

Questão 19 de 70

1

Which is not a division of the Air and Space Operations Center?

Selecione uma das seguintes:

  • Strategy.

  • Combat plans.

  • Combat support.

  • Combat operations.

Explicação

Questão 20 de 70

1

Which of the following is categorized as a small unmanned aerial system (UAS)?

Selecione uma das seguintes:

  • MQ–9 Reaper.

  • RQ-11B Raven

  • MQ–1B Predator.

  • RQ–4B Global Hawk.

Explicação

Questão 21 de 70

1

Which of the following is not a career field assigned to engineering installation units?

Selecione uma das seguintes:

  • 3D0X3, Cyber Surety

  • 3D1X2, Cyber Transport Systems.

  • 3D1X3, RF Transmission Systems.

  • 3D1X7, Cable and Antenna Systems.

Explicação

Questão 22 de 70

1

Which Engineering Installation (EI) unit has the only flight assigned that supports a 72 hour rapid response force during crisis providing specialized engineering support in telecommunications and electromagnetic spectrum field analysis?

Selecione uma das seguintes:

  • 38 Engineering Squadron (ES).

  • 38 Contracting Squadron (CONS).

  • 38 Operations Support Squadron (OSS).

  • 85 Engineering Installation Squadron (EIS)

Explicação

Questão 23 de 70

1

All armed forces broadcasting affiliates merged under the American Forces Network (AFN) in

Selecione uma das seguintes:

  • 1942.

  • 1954.

  • 1988.

  • 1998.

Explicação

Questão 24 de 70

1

What Methods and Procedures Technical Order (MPTO) defines project management as the application of knowledge, skills, tools, and techniques to project activities to meet project objectives?

Selecione uma das seguintes:

  • MPTO 00–33A–1001.

  • MPTO 00–33A–1002.

  • MPTO 00–33A–2001.

  • MPTO 00–33A–2002.

Explicação

Questão 25 de 70

1

The five phases of Project Management are initiate,

Selecione uma das seguintes:

  • funding, execute, close, and control.

  • plan, execute, monitor, and control.

  • plan, execute, close, and control

  • plan, control, close, and support.

Explicação

Questão 26 de 70

1

What does the project manager provide in the Initiate Phase?

Selecione uma das seguintes:

  • Funding.

  • Technical solution.

  • Requirements management plan.

  • Answers, guidance, and education.

Explicação

Questão 27 de 70

1

What are the source documents that define a needed cyberspace infrastructure capability called?

Selecione uma das seguintes:

  • Processes.

  • Priorities.

  • Requirements.

  • Technical solutions.

Explicação

Questão 28 de 70

1

Which of these items is contained in the Project Plan?

Selecione uma das seguintes:

  • Cost management plan.

  • Allied support plan.

  • Technical plan.

  • Material plan.

Explicação

Questão 29 de 70

1

The desired outcome, product, or service of a project is referred to as

Selecione uma das seguintes:

  • the status.

  • a milestone.

  • a deliverable.

  • the final result.

Explicação

Questão 30 de 70

1

Which of the following is a type of change request used to correct a portion of the project not meeting requirement specifications?

Selecione uma das seguintes:

  • Status request.

  • Defect repairs.

  • Preventive action.

  • Corrective action.

Explicação

Questão 31 de 70

1

What document marks the end of a project and validates the successful installation of a communications system?

Selecione uma das seguintes:

  • AFTO Form 745.

  • AFTO Form 747

  • AFTO Form 749.

  • AF Form 1747.

Explicação

Questão 32 de 70

1

Exceptions that could prevent a system from meeting specified operational requirements are termed

Selecione uma das seguintes:

  • major.

  • minor.

  • major and minor.

  • major and critical.

Explicação

Questão 33 de 70

1

What is critical to controlling and ensuring the overall project progresses accordingly, regardless of the phase?

Selecione uma das seguintes:

  • Follow-up.

  • Controlling.

  • Organization.

  • Documenting.

Explicação

Questão 34 de 70

1

Changes are requested during a project using an

Selecione uma das seguintes:

  • AF Form 1146.

  • AF Form 1747.

  • AFTO Form 46.

  • AFTO Form 47.

Explicação

Questão 35 de 70

1

Who implements a technical solution for a base?

Selecione uma das seguintes:

  • Project monitor.

  • Project manager.

  • Communication squadron.

  • Implementing organization.

Explicação

Questão 36 de 70

1

What title is given to anyone assigned to assist the program manager in fulfilling program management duties?

Selecione uma das seguintes:

  • Project monitor.

  • Project manager.

  • Program action officer.

  • Program action monitor.

Explicação

Questão 37 de 70

1

The five key stages of the Information Technology Infrastructure Library (ITIL) service life cycle are service strategy,

Selecione uma das seguintes:

  • service design, service transition, service plan, and continual service improvement.

  • service plan, service transition, service operation, and continual service improvement.

  • service design, service transition, service operation, and continual service improvement.

  • service design, service disposition, service operation, and continual service improvement.

Explicação

Questão 38 de 70

1

In what Information Technology Infrastructure Library (ITIL) stage do you determine the underlying principles used for developing the policies, objectives, guidelines, and processes required throughout the Service Life Cycle?

Selecione uma das seguintes:

  • Service improvement.

  • Service transition.

  • Service strategy.

  • Service design.

Explicação

Questão 39 de 70

1

In what Information Technology Infrastructure Library (ITIL) stage do you create the framework to ensure the designed service is effectively and efficiently implemented in the live environment?

Selecione uma das seguintes:

  • Service design.

  • Service strategy.

  • Service transition.

  • Service operation.

Explicação

Questão 40 de 70

1

Engineering support for MAJCOMs is provided by Cyberspace Systems Integrator Tier

Selecione uma das seguintes:

  • 1.

  • 2.

  • 3.

  • 4.

Explicação

Questão 41 de 70

1

Which guidance directs the use of Cyberspace Infrastructure Planning System (CIPS)?

Selecione uma das seguintes:

  • AFI 33–115.

  • AFI 33-150

  • TO 00–33D–3001.

  • TO 00–33D–3004.

Explicação

Questão 42 de 70

1

Which Cyberspace Infrastructure Planning System (CIPS) functional area supports enhancements to current capabilities funded and accomplished at the base level generally in less than 30 days and in the form of a maintenance task order?

Selecione uma das seguintes:

  • Work orders.

  • Trouble tickets.

  • Infrastructure requirements.

  • Communications and Information Systems Installation Records (CSIR).

Explicação

Questão 43 de 70

1

Which of the following funding options does the local communications squadron implement using base level support and resources?

Selecione uma das seguintes:

  • Organic.

  • Contract.

  • Inorganic.

  • Self-Help.

Explicação

Questão 44 de 70

1

Where can you find a list of lead commands or system program offices (SPOs) for each major program?

Selecione uma das seguintes:

  • TO 00–33A–1001.

  • TO 00-33D-3003

  • Integrated Maintenance Data System (IMDS).

  • Cyberspace Infrastructure Planning System (CIPS).

Explicação

Questão 45 de 70

1

As a minimum which of the following is not required to review and validate technical solutions?

Selecione uma das seguintes:

  • Base Communications Systems Officer.

  • Affected Work Center.

  • Base Civil Engineer.

  • Project Managers.

Explicação

Questão 46 de 70

1

Which of the following is not a cause for requirements to be considered special?

Selecione uma das seguintes:

  • Requires services from outside agencies.

  • Mobility (deployment) equipment.

  • Requires additional manpower.

  • Requires additional funding.

Explicação

Questão 47 de 70

1

In which type of plan do writers fully develop the mission, situation, and concept of operations for accomplishing assigned mission in the event of future situation, but only summarize the mobility and logistic requirements?

Selecione uma das seguintes:

  • Concept Plan.

  • Functional Plan.

  • Supporting Plan.

  • Operational Plan.

Explicação

Questão 48 de 70

1

When tasked by the supported combatant commander which type of plan is prepared in support of the contingency plans?

Selecione uma das seguintes:

  • Concept Plan.

  • Functional Plan.

  • Supporting Plan.

  • Operational Plan.

Explicação

Questão 49 de 70

1

If instructions are not detailed enough to warrant a separate annex, information on base functional area support is placed in the

Selecione uma das seguintes:

  • Programming Plan (PPLAN).

  • Program Action Directive (PAD).

  • Operations Plan (OPLAN) major paragraph.

  • Time Phased Force and Deployment Data (TPFDD).

Explicação

Questão 50 de 70

1

What area of the Annex K is used to detail wartime procedures for maintaining the communications systems under contract during peacetime?

Selecione uma das seguintes:

  • Special Measures.

  • Administration.

  • Assumptions.

  • Logistics.

Explicação

Questão 51 de 70

1

Which type of planning meeting identifies civil engineering projects including new construction, renovations, or demolitions of facilities, and relocations of organizations?

Selecione uma das seguintes:

  • Communications and Information (C&I) Systems Planning Forum.

  • Facilities Utilization Board.

  • Mission Briefings.

  • Informal Meeting.

Explicação

Questão 52 de 70

1

The AF Form 1067 is used for defining, validating, and approving requirements for

Selecione uma das seguintes:

  • safety modifications.

  • T–1 temporary modifications.

  • T–2 temporary modifications.

  • all temporary and permanent notifications.

Explicação

Questão 53 de 70

1

Which modification type evaluates, demonstrates, or exercises the technical performance, operational effectiveness, and/or the operational suitability of developmental and/or test materiel (hardware, firmware and software) capabilities?

Selecione uma das seguintes:

  • Safety modifications.

  • T–1 temporary modification.

  • T-2 temporary modifications.

  • All temporary and permanent modifications.

Explicação

Questão 54 de 70

1

Which of the following is not a step required in the modification proposal process?

Selecione uma das seguintes:

  • Request for action and organization validation

  • Using command and lead command validation.

  • Work center manager certification and approval.

  • Program manager review and approval of technical requirements and solution.

Explicação

Questão 55 de 70

1

Support agreements are documented on

Selecione uma das seguintes:

  • AF Form 1067.

  • DD Form 1067.

  • AF Form 1144.

  • DD Form 1144.

Explicação

Questão 56 de 70

1

As a minimum, a support agreement must be reviewed how soon after its effective date?

Selecione uma das seguintes:

  • 6 months.

  • 1 year.

  • 2 years.

  • 3 years.

Explicação

Questão 57 de 70

1

Which of the following is not an exception to the “full and open competition” stipulation of the Competition in Contracting Act?

Selecione uma das seguintes:

  • Unusual or compelling urgency.

  • Unit commander's interest.

  • National security interests.

  • Sole Source.

Explicação

Questão 58 de 70

1

Within how many days of the delivery date must a fully researched, completed requirement for a fixed-price and cost reimbursement contract with a monetary value of $100,000 be submitted to the Base Contracting Office?

Selecione uma das seguintes:

  • 10 calendar days.

  • 30 calendar days.

  • 35 calendar days.

  • 50 calendar days.

Explicação

Questão 59 de 70

1

Which type of contract acquires supplies or services based on direct labor hours at specified fixed hourly rates?

Selecione uma das seguintes:

  • Sole Source.

  • Firm Fixed Price.

  • Time and Material

  • Performance Based.

Explicação

Questão 60 de 70

1

Which type of contract should only be used when it is impossible to accurately estimate the extent or duration of the work or anticipate costs with any reasonable degree of accuracy?

Selecione uma das seguintes:

  • Sole Source.

  • Firm Fixed Price.

  • Time and Material.

  • Performance Based.

Explicação

Questão 61 de 70

1

Which type of contract is permissible when there is only one viable option to satisfy the requirement for supplies or services?

Selecione uma das seguintes:

  • Sole Source

  • Firm Fixed Price.

  • Time and Material.

  • Performance Based.

Explicação

Questão 62 de 70

1

Which of the following is a simplified method of filling anticipated repetitive needs for supplies or services by establishing “charge accounts” with qualified sources of supply?

Selecione uma das seguintes:

  • Sole Source.

  • Time and Material

  • Indefinite Delivery.

  • Blanket Purchase Agreement

Explicação

Questão 63 de 70

1

Who is responsible for establishing and maintaining the installation’s contract Quality Assurance Program?

Selecione uma das seguintes:

  • Contracting Officer Representative.

  • Functional Director/Commander.

  • Quality Assurance Evaluator.

  • Contracting Office

Explicação

Questão 64 de 70

1

Who is responsible for assigning competent and capable functional experts as primary and alternate Contract Officer Representatives (COR)?

Selecione uma das seguintes:

  • Contracting Officer Representative.

  • Functional Director/Commander.

  • Quality Assurance Evaluator.

  • Contracting Office.

Explicação

Questão 65 de 70

1

Who is responsible for providing training to Quality Assurance (QA) personnel and functional directors/commanders?

Selecione uma das seguintes:

  • Quality Assurance Program Coordinator

  • Contracting Officer Representative.

  • Quality Assurance Evaluator.

  • Unit Contract Monitor.

Explicação

Questão 66 de 70

1

Who acts as the unit focal point to provide design support to and/or obtain base Civil Engineering (CE) support?

Selecione uma das seguintes:

  • Facility Manager.

  • Quality Assurance Evaluator.

  • Functional Director/Commander.

  • Unit plans, planning, and agreements section.

Explicação

Questão 67 de 70

1

What must base Civil Engineering (CE) prepare and forward to MAJCOM for review and approval if major or minor construction is required?

Selecione uma das seguintes:

  • AF Form 332.

  • AF Form 1146.

  • DD Form 1144.

  • DD Form 1391.

Explicação

Questão 68 de 70

1

Secretary of Defense and House and Senate Armed Services Committees authorization and appropriation are required for what type of construction projects?

Selecione uma das seguintes:

  • Major Construction.

  • Minor Construction.

  • All military construction.

  • None, construction projects do not require authorization and appropriation.

Explicação

Questão 69 de 70

1

The cost threshold for a minor construction project not using Operation and Maintenance (O&M) funds is

Selecione uma das seguintes:

  • $750 thousand (K).

  • $1 million (M).

  • $1.5 M.

  • $5 M.

Explicação

Questão 70 de 70

1

Who is responsible for inspecting all “real property” on an installation to ensure it meets applicable standards?

Selecione uma das seguintes:

  • Base Civil Engineering.

  • Gaining Work Center.

  • Contracting Office.

  • Quality Assurance.

Explicação