Plan Driven Approach:
Focus on maximizing control and minimizing risks
Ensures that the solution is fully developed before implementation
Most of the BA work occurs at the beginning of the project or any specific phase
Calls for significant amount of formality and detail
Requirements are captured in detailed and formal set of documents
Ensures that changes only occur when they are absolutely necessary and can be clearly justified; each change is a mini project in itself with complete elicitation of requirements, design and implementation. change requirements impact both the solution scope and the project scope.
relies on formal communication methods; needs signatory approvals and archived as part of project history
Preferred in situations where the risk of incorrect implementation is unacceptably high and managing stakeholder interaction pose significant challenges
Examples: waterfall method and business process re-engineering initiatives
Change Driven Approach:
Focus on rapid delivery of business value
To achieve this goal, they accept high degree of risk regarding the overall delivery of the project
incrementally develops the components of the project
Examples: agile method and continuous improvement methods
requirements are prioritized and reprioritized throughout the project
Focus more on frequency of communication than on formal documentation
Informações
- Descrição
- Notas sobre Business Analysis Approaches, criado por Garima Gupta em 11-03-2017.
- Criado por
- Garima Gupta · mar 2017
- Atualizado
- 11 mar 2017
- Visualizações
- 0
- Avaliação
Mais sobre Business analysis techniques and skills