Project objectives
Success Criteria:
Project Title: Redesign and rebuild a network in 3500 Square feet building at Sheffield
Project Start Date: 01/02/2017
Projected Finish Date: 01/06/2017
Budget: £15000
Roles and Responsibilities
- Separate the trainers into categories which 10 team members move to Sheffield Branch
- Desktop needed to be transferred to the Sheffield office
- 3500 square empty office room need to be design, positioning furniture and IT equipment
- 13 program station needed to be set in which 10 for DLT, two for guest and visitors, one for manager
- Set up required for DLT to access Montrose LTD network, Wi-Fi and student registration system
- DLT’s personal laptops needed to be synchronized to their desktops and mobile phones.
- Equipment required web camera, photocopier, wiring, cabling, trunking
with a preplan all the equipment should be moved to new office. The 3500 square building will be Designed for office placing IT equipment and furniture. 13 workstations should be set up for DLT with accessing Montrose LTD network, Wi-Fi and student registration system as well as DLT’s personal laptops needed to be synchronized to their desktops and mobile phones. All the equipment’s required should be set
Name and Signature
Informações
- Descrição
- Notas sobre Project Charter - created from Mind Map, criado por Ahmed Rafi em 14-03-2017.
- Criado por
- Ahmed Rafi · mar 2017
- Atualizado
- 14 mar 2017
- Visualizações
- 0
- Histórico
-
- Criado por Ahmed Rafi · 14 mar 2017
- Copiado para Nota por Ahmed Rafi · 14 mar 2017
- Avaliação