Quiz
Chapter 8 M/C Part 1
Crie uma conta grátis para terminar este quiz
Salve seu progresso e veja sua nota final.
Já tem uma conta? Inicie sessão
Perguntas do quiz (25)
119. _____ means the project’s processes and products meet written specifications.
- Aa. Conformance to requirements
- Bb. Fitness for use
- Cc. Project feasibility
- Dd. Benchmarking
220. _____ means that a product can be used as it was intended
- Aa. Conformance to requirements
- Bb. Fitness for use
- Cc. Critical chain scheduling
- Dd. Free slack
321. Process improvement plan, quality metrics, and quality checklists are the outputs of the _____ process of project
quality management.- Aa. controlling quality
- Bb. planning quality management
- Cc. quality certification
- Dd. performing quality assurance
422. A _____ is a standard of measurement in quality management.
- Aa. milestone
- Bb. metric
- Cc. merge
- Dd. matrix
523. The _____ process is often associated with the technical tools and techniques of quality management, such as Pareto
charts, quality control charts, and statistical sampling.- Aa. quality planning
- Bb. quality certification
- Cc. quality assurance
- Dd. quality control
624. Performing quality assurance is a subprocess of the _____ process of project quality management.
- Aa. initiating
- Bb. closing
- Cc. monitoring and controlling
- Dd. executing
725. Validated changes and validated deliverables are the outputs of the _____ subprocess of project quality management.
- Aa. initiating
- Bb. closing
- Cc. monitoring and controlling
- Dd. executing
826. _____ is a technique that helps identify which variables have the most influence on the overall outcome of a process.
- Aa. Design of experiments
- Bb. Backward pass
- Cc. Activity-on-arrow
- Dd. Crashing
927. _____ is the degree to which a system performs its intended function.
- Aa. Reliability
- Bb. Validity
- Cc. Maintainability
- Dd. Functionality
1028. _____ are the system’s special characteristics that appeal to users.
- A. Features
- Bb. Outputs
- Cc. Yields
- Dd. Metrics
1129. _____ addresses how well a product or service performs the customer’s intended use.
- Aa. Reliability
- Bb. Performance
- Cc. Maintainability
- Dd. Functionality
1230. _____ is the ability of a product or service to perform as expected under normal conditions.
- Aa. Reliability
- Bb. Performance
- Cc. Maintainability
- Dd. Functionality
1331. _____ addresses the ease of performing maintenance on a product.
- Aa. Reliability
- Bb. Performance
- Cc. Maintainability
- Dd. Functionality
1432. _____ generates ideas for quality improvements by comparing specific project practices or product characteristics to
those of other projects or products within or outside the performing organization.- Aa. Prototyping
- Bb. Systems thinking
- Cc. Mind mapping
- Dd. Benchmarking
1533. _____ refers to action taken to bring rejected items into compliance with product requirements or specifications or
other stakeholder expectations.- Aa. A process adjustment
- Bb. Rework
- Cc. An acceptance decision
- Dd. Validation
1634. _____ correct(s) or prevent(s) further quality problems based on quality control measurements.
- Aa. Process adjustments
- Bb. Rework
- Cc. Acceptance decisions
- Dd. Decomposition
1735. A _____ is a graphic display of data that illustrates the results of a process over time.
- Aa. statistical sampling chart
- Bb. Pareto chart
- Cc. Six Sigma chart
- Dd. control chart
1836. _____ help users to identify the vital few contributors that account for most quality problems in a system.
- Aa. Gantt charts
- Bb. Pareto charts
- Cc. Control charts
- Dd. Tracking Gantt charts
1937. _____ involves choosing part of a population of interest for inspection.
- Aa. Statistical sampling
- Bb. Conformance
- Cc. System testing
- Dd. Fitness for use
2038. Six Sigma’s target for perfection is the achievement of no more than _____ defects, errors, or mistakes per million
opportunities.- Aa. 1.34
- Bb. 3.4
- Cc. 34
- Dd. 13.4
2139. Projects that use Six Sigma principles for quality control normally follow a five-phase improvement process called
_____.- Aa. DMAIC
- Bb. weighted scoring model
- Cc. configuration management
- Dd. use case modeling
2240. Important tools used in the _____ phase of the DMAIC process include a project charter, a description of customer requirements, process maps, and Voice of the Customer (VOC) data
- Aa. define
- Bb. measure
- Cc. analyze
- Dd. improve
2341. An important tool used in the _____ phase of the DMAIC process is the fishbone or Ishikawa diagram.
- Aa. define
- Bb. measure
- Cc. analyze
- Dd. improve
2442. A ____ is a bell-shaped curve that is symmetrical regarding the average value of the population (the data being
analyzed).- Aa. skewed distribution
- Bb. normal distribution
- Cc. bimodal distribution
- Dd. degenerate distribution
2543. A(n) _____ is any instance where the product or service fails to meet customer requirements.
- Aa. defect
- Bb. yield
- Cc. deliverable
- Dd. variance
Informações
- Descrição
- CIS 4375 Quiz sobre Chapter 8 M/C Part 1, criado por . . em 04-10-2017.
- Autor
- . .
- Idioma
- English
- Visualizações
- 13
- Etiquetas
- Avaliação
- Ainda sem avaliações Avalie este quiz