All of the following are true about reflected ceiling plans EXCEPT?
Responda
-
Shows a view of the ceiling as though it were reflected onto a mirror on the floor
-
Shows partitions that extend to the ceiling and those that extend through the ceiling
-
Shows power sources and outlets
-
Shows ceiling materials
Questão 2
Questão
When are mechanical, electrical, and plumbing details developed and coordinated with the interior drawings?
Responda
-
Preliminary design to prevent conflicts
-
For presentation to show the client that the design solution will "work"
-
During construction drawings
-
During design development
Questão 3
Questão
Specifications are made most concise by..
Responda
-
Using descriptive specs
-
Using reference standard specs
-
Using phrases instead of complete sentences
-
Avoiding the use of works like a, the, and all
Questão 4
Questão
According to standard drawing convention, how would a set of construction drawings produced by an interior designer be organized?
Responda
-
Title and index, fire protection drawings, mechanical, electrical, floor plans, reflected ceiling plans, elevations, details
-
title and index, architectural, electrical, fire protection, interiors, mechanical, plumbing, structural
-
Title and index, architectural, interiors, mechanical, electrical, structural, plumbing, fire protection
-
Title and index, floor plans, reflected ceiling plans, elevations, details, mechanical, electrical, fire protection
Questão 5
Questão
Which type of specification is a statement setting criteria and results required for the item being specified?
Questão 6
Questão
Which of the following is the best way to show finish placement for a project with spaces that have 2 finishes, such as paint and wallcovering?
Responda
-
Schedule a meeting to walk through the finishes with the general contractor
-
Use wall finish tag symbols that coordinate with the schedule
-
Use a finish schedule and label the finishes N, S, E, W on the plan
-
Use a combination of lines, symbols, and elevations on a finish plan
Questão 7
Questão
In which type of drawing would you NEVER find furniture?
Responda
-
Reflected ceiling plan
-
Parti drawing
-
Section
-
Elevation
Questão 8
Questão
Which plan is sometimes aligned with the electrical and power/communication plans, because the exact location of many of these outlets is directly related?
Responda
-
Accessories
-
Furniture
-
Furnishings
-
Finishes
Questão 9
Questão
Which type of schedule would be LEAST likely to be found in a set of interior design drawings?
Responda
-
Window schedule
-
Millwork schedule
-
Equipment schedule
-
Finish schedule
Questão 10
Questão
Which type of drawing meets the requirements of either design intent, constraints, function, or constructability?
Responda
-
RCP
-
Section
-
Detail drawing
-
Shop drawing
Questão 11
Questão
Which of the following would NOT typical be the responsibility of the interior designer to show on a Reflected Ceiling Plan?
Responda
-
Height of dados and ceiling finishes
-
Exit signs and sprinkler locations
-
Full height wall partitions extending through the plenum to the concrete slab above
-
Switching and circuiting for lighting fixtures
Questão 12
Questão
Which of the following would an interior designer put into a schedule?
Responda
-
Hardware
-
Door/Window
-
Finish
-
All of the above
Questão 13
Questão
Which is the best lighting system to use in a graphic designer's office if the designer's goal is to provide a flexible and cost effective lighting system that creates a pleasant work environment?
Responda
-
Direct/Indirect
-
Task/Ambient
-
Recessed
-
Indirect
Questão 14
Questão
All of the following are true about wood structural systems EXCEPT?
Responda
-
Typically not used in residential construction
-
Is strong in both compression and tension
-
Typically used in small commercial construction
-
Is inexpensive and plentiful
Questão 15
Questão
What is NOT allowed in a return-air plenum?
Responda
-
Water supply pipes
-
Wood blocking
-
Electrical cable
-
Fire dampers
Questão 16
Questão
Which would you use to separate a building into 2 different construction types?
Questão 17
Questão
___________ Loads in a building are the permanent material weights of the building components, equipment, and other fixed elements.
Responda
-
Gravity
-
Dead
-
Dynamic
-
Horizontal
Questão 18
Questão
Which ceiling system would you use to accommodate acoustic ceiling tile, light fixtures, supply and return air grilles, fire sprinklers, and partitions attached in a consistent, unified way?
Questão 19
Questão
Which of the following is true about solid-core doors?
Responda
-
Used as acoustical barriers
-
Are made with a variety of core types depending on the functional requirements of the door
-
All of these are true
-
Available with fire ratings of 20 minutes, 45 minutes, and 90 minutes
Questão 20
Questão
Which of the following would be used to improve the acoustical properties of a wall by isolating the wallboard from rigid attachment to framing?
Questão 21
Questão
Which Is the best method to minimize noise and acoustic problems when planning a space?
Responda
-
Maximize common wall contact between spaces
-
Use acoustic ceiling tile
-
Stagger the placement of doorways
-
Use white noise to mask unwanted sounds
Questão 22
Questão
Which of the following would you most likely find on a reflected ceiling plan?
Questão 23
Questão
Which scale would you typically draw small and complex construction details in?
Responda
-
1/2"=1'0"
-
3"=1'0"
-
3/16"=1'0"
-
1/8"=1'0"
Questão 24
Questão
The dotted line in the exhibit shown below allocates:
Questão 25
Questão
In the exhibit, the top number inside each symbol refers to what in a set of working construction documents?
Responda
-
Indicates the sequential drawing number
-
Indicates the drawing sheet
-
Indicates the amount of views are shown
-
Indicates the number of drawings included
Questão 26
Questão
In the following door schedule, the frame of door 108A is made of what material?
Responda
-
Steel
-
Existing
-
Aluminum
-
Hollow metal
Questão 27
Questão
What would be the best scale to use if you were drawing a very complex elevation?
Responda
-
1/4"=1:50
-
1/2"=1:20
-
1 1/2"=1:100
-
3"=1:5
Questão 28
Questão
Which of the following hatch patterns represent batt insulation in a wall type?
Questão 29
Questão
Which of the following scales should NEVER be used for interior design construction drawings?
Responda
-
1"=1'0"
-
3/16"=1'0"
-
1/8"=1'0"
-
3/4"=1'0"
Questão 30
Questão
Water conservation is a primary goal for the current project that you are working on. You could use all of the following to reach this goal EXCEPT..
Responda
-
Use high efficiency toilets
-
Appropriate plant selection
-
Increase the use of potable(drinkable) water
-
Use low flow shower heads and faucets
Questão 31
Questão
Choose all that are components of the programming report
Responda
-
Programming concepts
-
Appendices
-
Executive summary
-
Goals and objectives of report
-
Summary of space needs
-
Space adjacencies
-
Code requirements
-
Design concept
-
Analysis of existing space
-
Budget and schedule requirements