  1. 1You are working in your Architectural design office when you receive an email from the Contractor on a project your firm completed the construction documents for. Attached to the email is the Contractor’s Schedule of Submittals. Why is the Contractor sending this to you?
    1. AContractor is an Over Achiever
    2. BSubmittal Schedule is to be completed by the Architect
    3. CSubmittal Schedule is required in AIA - A201
    4. DThis should be sent to the Owner
  2. 2
    You are in charge of Construction Administration for a complex airport expansion project that has taken multiple years to complete. You have received by fax a set of submittals from the Contractor. Under AIA 201, how long do you have to review
    1. A7 days
    2. BReasonable Promptness
    3. CThe Owner must review first
    4. D10 days
  3. 3You are in the construction phase on a project and you receive an email from the general Contractor. She informs you that the interior walls were not dimensioned correctly on the drawings and the plumbing drains were installed incorrectly and are not lining up with where the walls are supposed to go as many of them where to be embedded in the walls. You have completed a change order using AIA Contract Document G701. Who needs to sign this before any work in completed?
    1. AContractor, Architect
    2. BOwner, Contractor
    3. COwner, Architect, Contractor
    4. DArchitect, Owner
  4. 4You are assisting a client in choosing the best project delivery method for their adaptive reuse- live/work studio lofts. Which of the following would be the most appropriate delivery method for their project?
    1. ADesign-Build
    2. BCost Plus Fixed Fee
    3. CDesign-Bid-Build
    4. DMultiple-Prime
  5. 5You receive a call from a new client that is looking to hire a Contractor to manage the construction for a building your firm designed. They feel most comfortable with the AIA Contract Documents and they want their contract to include the cost of work plus a fee with a GMP. Which AIA contract would you recommend?
    1. AAIA A102
    2. BAIA A107
    3. CAIA A101
    4. DAIA A141
  6. 6An Owner responds to an ad on your website and is looking for a firm that can manage the design and construction services for their project. What type of project delivery method are they seeking?
    1. AFast-track
    2. BDesign-bid-Build
    3. CDesign-build
    4. DConstruction Manager at Risk
  7. 7Your firm is in the Construction Administration phase on a project. You are meeting on site with the general Contractor. You are running through a list of communication and documentation best practices that have been improved over the last several years. The Contractor looks at you with sleepy eyes and asks, “Look all this is great, but how do I get paid?” How do you respond?
    1. AComplete an Application for Payment
    2. BSubmit A201 to Architect by email
    3. CSubmit invoices with Change Order Summaries
    4. DMail the Owner the invoices
  8. 8You are preparing the bid packages to send out for a project you just completed the Construction Drawings for. Which AIA Contract Document would help with this process in communicating to bidders?
    1. AA221
    2. BA751
    3. CA107
    4. DA701
  9. 9Which of the following dispute resolution procedures is considered non-binding?
    1. AArbitration
    2. BLitigation
    3. CMeditation
    4. DMediation
  10. 10The Owner is out on the job site with the Contractor on a project. The Owner is not happy with the size of a landing on a staircase and wants it smaller. The Architect is not made aware of the change. Later during an inspection, the inspector measures the landing and states it is not to code so he can not pass the inspection until it is replaced. Who will have to pay for this?
    1. ASubContractor that built the stair, should have followed the Construction Documents
    2. BOwner, made the change without Architect approval
    3. CContractor, should have known the code
    4. DArchitect, should have informed the Owner of the code

Informações

Descrição
Practice Managment ARE
Autor
M. A.
Idioma
English
Visualizações
8
Histórico
Criado em 28 jan 2019 · atualizado em 3 fev 2019
Etiquetas
pcmarch
Avaliação
Ainda sem avaliações
Avalie este quiz
Avalie este quiz

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?