  1. 1You are the project manager for the BBB Project. Stacy, a project team member, is confused about what QA is. Which of the following best describes QA?
    1. AA. QA is quality assurance for the overall project performance.
    2. BB. QA is quality acceptance according to scope verification.
    3. CC. QA is quality assurance for the project deliverable.
    4. DD. QA is quality assurance for the project stakeholders.
  2. 2You are the project manager for the Photo Scanning Project. This project is similar to another project you have completed. Your project is to electronically store thousands of photos for your city’s historical society. Quality is paramount on this project. Management approaches you and asks why you have devoted so much of the project time to planning. Your response is which of the following?
    1. AA. This is a first-time, first-use project, so more time is needed for planning.
    2. BB. Planning for a project of this size, with this amount of quality, is mandatory.
    3. CC. Quality is planned into a project, not inspected in.
    4. DD. Quality audits are part of the planning time.
  3. 3You are the project manager for the Floor Installation Project. Today you plan to meet with your project team to ensure that the project is completed with no deviations from the project requirements. This process is which of the following?
    1. AA. Quality planning
    2. BB. Quality management
    3. CC. Quality control
    4. DD. Quality assurance
  4. 4You are the project manager for the ASE Project, which must map to industry standards in order to be accepted by the customer. You and your team have studied the requirements and have created a plan to implement the deliverables with the appropriate level of quality. What is this process called?
    1. AA. Quality planning
    2. BB. Quality management
    3. CC. Quality control
    4. DD. Quality assurance
  5. 5Juan is the project manager for his organization and he’s asked Beth, a project team member, to help him create a fishbone diagram. Beth doesn’t know what this is and asks for your help. A fishbone diagram is the same as a(n) ______________________ diagram.
    1. AA. Ishikawa
    2. BB. Pareto
    3. CC. Flow
    4. DD. Control
  6. 6Management has asked you to define the correlation between quality and the project scope. Which of the following is the best answer?
    1. AA. The project scope includes metrics for quality.
    2. BB. Quality metrics are applied to the project scope.
    3. CC. Quality is the process of completing the scope to meet stated or implied needs.
    4. DD. Quality is the process of evaluating the project scope to ensure that quality exists.
  7. 7You are the project manager of the Condo IV Construction project and you’re working with your project team and the project sponsor to identify the quality metrics and develop the quality management plan for the project. In light of this planning event, which of the following is most true about quality?
    1. AA. It will cost more money to build quality into the project.
    2. BB. It will cost less money to build quality into the project process.
    3. CC. Quality is inspection driven.
    4. DD. Quality is prevention driven.
  8. 8You are the project manager for the KOY Project, which requires quality that maps to federal guidelines. To ensure that you can meet these standards, you have elected to put the project team through training specific to the federal guidelines your project must adhere to. The costs of these classes can be assigned to which of the following?
    1. AA. The cost of doing business
    2. BB. Cost of quality
    3. CC. Cost of adherence
    4. DD. Cost of nonconformance
  9. 9You are the project manager for the KOY Project, which requires quality that maps to federal guidelines. During a quality audit, you discover that a portion of the project work is faulty and must be done again. The requirement to do the work is an example of which of the following?
    1. AA. Cost of quality
    2. BB. Cost of adherence
    3. CC. Cost of nonconformance
    4. DD. The cost of doing business
  10. 10You are the project manager of the JKL Project, which currently has some production flaws. Which analysis tool will allow you to determine the cause and effect of the production faults?
    1. AA. A flowchart
    2. BB. A Pareto diagram
    3. CC. An Ishikawa diagram
    4. DD. A control chart

Informações

Descrição
Quality
Idioma
Español
Visualizações
17
Etiquetas
ingeniería
Avaliação
Ainda sem avaliações
Avalie este quiz
Avalie este quiz

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?