O GoConqr está de visual novo! Conte para nós o que você achou.

Quiz

Unit No 208 Carrying out first fix frames , partitions and stairs

Brickwork management 20 perguntas 1.737 visualizações

Fazer o quiz

Perguntas do quiz (20)

  1. 1Door Frames with 25mm rebates are generally used for
    1. Afire doors
    2. Binternal flash doors
    3. Cexternal panel doors
    4. Dhardwood doors
  2. 2Door linings usually have:
    1. A20 mm rebates
    2. Ba loose door stop
    3. Cno door stop
    4. D25 mm rebates
  3. 3When fixing replacement windows into masonry a suitable method is to use:
    1. Amasonry nails
    2. Bgalvanised steel frame clamps
    3. Cscrews and plugs
    4. Dnails and battens
  4. 4A nylon- sleeved frame fixing anchor is used to fix a door frame when:
    1. Ait is fixed to a solid wall
    2. Bthe brickwork is going up
    3. Cthe brickwork is completed but green
    4. Dit is fixed to a timber frame construction
  5. 5To provide the strongest floor when fitting softwood boarding the heading joints are:
    1. Akept in line and fixed
    2. Bstaggered randomly and fixed
    3. Ckept in line and left loose
    4. Dstaggered randomly and left loose
  6. 6The best method of fixing chipboard flooring to joists is to:
    1. Aglue some joints and nail down
    2. Bglue all joints and screw down
    3. Cglue some joints and leave floating
    4. Dglue all joints and leave floating
  7. 7When fixing 18 mm softwood floor boards the most suitable length of nail is
    1. A38 mm
    2. B50 mm
    3. C63 mm
    4. D18 mm
  8. 8The purpose of a pitch board is to set out the
    1. A rise on the strings only
    2. Bgoing on the strings only
    3. Crise and going on the strings
    4. Dwedge room on the strings
  9. 9When housing out strings it is best to use a:
    1. Arouter and setting out rod
    2. Brouter and stair template jig
    3. Cstair template and chisels
    4. Dchisel and tenon saw
  10. 10To check the treads are level when fixing a stair case it is best to use:
    1. Aboat level
    2. Blaser level
    3. Cwater level
    4. DCowley level

Informações

Descrição
Quiz sobre Unit No 208 Carrying out first fix frames , partitions and stairs, criado por Brickwork management em 11-11-2014.
Idioma
English
Visualizações
1.737
Avaliação
Ainda sem avaliações
Avalie este quiz
Avalie este quiz

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?