1Bug triage meeting are project meetings in which open bugs are divided into categories
- AVerdadeiro
- BFalso
2Which of following are not key task for defect tracking
- Aa. Retest defects and repair open defects
- Bb. Analyze defect data
- Cc. Add defect and Review New defects
- Dd. None
3Which of the following is broken down individual task such as processes, decisions,& then connected
- Aa. Activity diagram
- Bb. Use case
- Cc. Requirement
- Dd. none
4checking if communication is proper b/w web server- Application server and Application server – database server and vice versa
- Aa. Server interface,
- Bb. internal interface,
- Cc. External interface
- Dd. all
5What comes just before test execution---
- ATest Development
- BTest Execution
6Select valid defect types
- Aa. Functional
- Bb. Integration
- Cc. Developmental
- Dd. Rational
- Ee. Network
7Which is not COQ
- Aa. Testing
- Bb. Production
- Cc. Prevention
- Dd. Appraisal
8 Frequent code check-in pushes developer to create modular, less complex code (T/F)--
- AVerdadeiro
- BFalso
9When annotation in Junit4 replaces the setup method in Junit3 (eLearning)—
- ABefore Class
- BAfter Class
10While designing test case very common mistakes we do
- Aa. Perform a through clean up
- Bb. Incomplete , incorrect or incoherent set up
- Cc. Write too short test cases
- Dd. Unclear about test result
- Ee. miss a step
11.”Action verb” used in Test scenario(check box)
- Aa. Verify
- Bb. Validate
- Cc. Evaluate
12Priority is criticality of test case
- AVerdadeiro
- BFalso
13Project repository is automaticaly created wen v create a project to store document
- AVerdadeiro
- BFalso
14Version control system is feasible for ____________
- Aa. Test plan and business modeling
- Bb. Test resource
- Cc. Requirement
- Dd. All listed
15Cannot generate various defect reports from QC defect tab
- AVerdadeiro
- BFalso
16Key task for running test (radio)
- Aa. Create test sets
- Bb. schedule runs
- Cc. run test and analyze test results
- Dd. all
17Who will generate defect report?
- Aa. PM
- Bb. TL
- Cc. TM
- Dd. Developer
- Ee. tester
18Is data validation & Verification distinct and how
- AValidation check is used to check the errors such as
Wrong type of data(entrnum instead of text Data values that are too bog or too small) - BVerification check is used to check
Data accuracy
- AValidation check is used to check the errors such as
19Tools of Automation (check box)
- Aa. Load runner
- Bb. Rational robot
- Cc. silk test
- Dd. QTP
20What is the need of Exit criteria??? Defines when the test case level is complete
- ADefines when the test case level is complete
- BDefines when the test case is completed
21What s d benefits of release modules(Release and cycle management) in QC?
- Aa. Manage projects and assests against release and cycles
- Bb. Track release progress
- Cc. Gain visibility into release readiness and release quality
- Dd. Compare releases and cycles for conti process impro
22What are the tools used for defect tracking??
- Aa. Excel
- Bb. QC
- Cc. QTP
23What does MCDC stand for?
- AModified Condition Decision Coverage
- BMain Condition Decision Coverage
24Abusive language should be used for Effective Defect logging
- AVerdadeiro
- BFalso
25What can be done if requirements are changing continuously?
- AThe RCA need to be known.
- BThe extent of deviation need to be analysed.
- CAccordingly the technical requirements need to be reviwed.
26Metrics porting b/w Prolite& C20 occurs
- Aa. Once in month
- Bb. Every 24 hour
- Cc. Every hour
- Dd. None
27Purpose of Use case modeling
- Aa. identify capsules to encapsulate data
- Bb. actor system interaction
- Cc. to identify prototype test cases
28How to create bug reports
- Aa. Single bug in multiple reports
- Bb. Multiple “ in single “
- Cc. single “ in single “
- Dd. All above
29C20 has provision to add Custom Metrics
- AVerdadeiro
- BFalso
30Forcing error conditions in System is
- Aa. Exception
- Bb. Negative
- Cc. Exception or negative
31It is important that defects encountered during test execution are created through test lab
- AVerdadeiro
- BFalso
32Benefits of requirement management
- AManage history of change, record argument behind changes and define requirements baselines
- BView and define requirements attributes and provide permissions to team members to change attributes
- CDefine and track links between requirements to analyze the impacts of future changes
- DProvide team members with access to collaborate on certain projects
- EEnables the re-use of requirements in as many projects as necessary.
33Type of req which satisfies the needs of customer or the consumer directly interacts with
- Aa. operational req
- Bb. functional req
- Cc. technical req
- Dd. transitional req
34Status of the defect when it is logged
- Aa. new
- Bb. open
35Where is IDE score card available in the C20
- Aa. Process
- Bb. governance
- Cc. package
36Steps in test run
- A1. Create a test in Test Plan
- B2. Create a test set in Test Lab:
- C3. Go to Execution Grid tab.
Click on Select Tests. Test Plan Tree is now available: - D4. Select the test from Test Plan Tree and click on green arrow to create a Test Instance:
The Test Instance appears in the Excecution Grid tab: - E5. Click Run:
and click Begin Run:
You may add a step:
And Pass or Fail it:
Save the test run:
37Module to store test cases that are to be executed
- ATest lab
- Btest plan
38Process package in C20 can be modified according to project needs
- AVerdadeiro
- BFalso
39Which of the following is not a test execution metrics?
- Aa. test design coverage
- Bb. test effectiveness
- Cc. no of defects
40Steps in load testing (stress) –CB
- Aa. identify scenarios
- Bb. ‘’ load
- Cc. Simulate load
- Dd. Identify TC
- Ee. Calculate metrics
41Type of testing good for automation
- Aa. Regression testing
- Bb. Retesting
42Select the purpose of use case modeling –CB
- Aa. identify capsules to encapsulate data
- Bb. actor system interaction
- Cc. to identify prototype test cases
43Select the type of testing which can be automated CB
- Aa. regression
- Bb. functional
- Cc. load
- Dd. stress
- Ee. performance
44How many steps on root cause analysis
- A5
- B7
45Best defect prevention technique for long time
- Aa. 5 why analysis
- Bb. Pareto analysis
- Cc. Cause effect
- Dd. RCA
46Type of dynamic technique
- Aa. BVA
- Bb. Error guessing
- Cc. Reviews
47All the defects are not process defects?—
- AVerdadeiro
- BFalso
48In testing phase all the defects are application defects.
- AVerdadeiro
- BFalso
49Expansion of BDD – behavior driven development
- Abehavior driven development
- Bnone
50risk based technique is a technique of test execution?
- AVerdadeiro
- BFalso
51Defects found should be tracked on test lab ---
- AVerdadeiro
- BFalso
52Passive Voice should be used to reproduce defects
- AVerdadeiro
- BFalso
53is a structure for documenting the function required for a system, usually involving software whether that is new or being changed
- Aa. Use case
- Bb. Prototype
- Cc. User Story
- Dd. Test Case
54Data validation -----check box
- Aa. Provides Message to define what the input you expect for cell is
- Bb. Can be applied to cells even when data exists in old
- Cc. Provides ability to set error message when user enter an invalid data
- Dd. Useful even when the workbook is protected and shared
- Ee. Restricts types of data entry in cell by using validation criteria
55Baseline is a snapshot of library at a specific point of time
- AVerdadeiro
- BFalso
56Advantage of unit testing
- Aa. Faster debugging
- Bb. Faster development
- Cc. Better design
- Dd. Regression tool
57Defect aging is the different b/w the date when object fixed and the detection date
- AVerdadeiro
- BFalso
58Best environment to test
- APre-production environment
- BPost-production environment
59 Pre-requisite means
- AInitial set up
- BAfter set up
60Continuous integration means applying quality controlled after Dev.
- AVerdadeiro
- BFalso
Informações
- Descrição
- Dovetail Manual Testing
- Autor
- rabi kr shaw
- Idioma
- English
- Visualizações
- 369
- Histórico
- Criado em 22 jan 2017 · atualizado em 25 fev 2017
- Etiquetas
- Avaliação
- 4,0 de 5 · 3 avaliações Avalie este quiz