1Completion of a product scope is measured against:
- AProduct Management Plan
- BProject Management Plan
- CWBS & WBS Dictionary
- DProduct Requirements
2Which of the following can be BEST described as a characteristic of Work Package?
- AMay or may not be cost estimated
- BCan be scheduled
- CCan be further decomposed into work packages
- DMay be monitored subject to nature of the project
3All of the below are inputs to Define Scope process EXCEPT:
- AProject Charter
- BRequirements Document
- COrganizational process assets
- DProject Management Plan
4Validated deliverables is an input to which of the following processes?
- ACollect Requirements
- BDefine Scope
- CCreate WBS
- DValidate Scope
5Work Performance Measurement is an output of which process:
- ADefine Scope
- BCreate WBS
- CValidate Scope
- DControl Scope
6If the project is terminated early, the level and extent of completion should be documented. This is done as a part of:
- ADefine Scope
- BCreate WBS
- CValidate Scope
- DControl Scope
7Validate Scope can be BEST described as the process of
- AValidating that the project quality requirements have been met
- BObtaining stakeholder's formal acceptance of the project deliverables
- CControlling changes to the scope of the project
- DValidating that all of the project's objectives have been met
8Project Charter is an input to all of the following processes EXCEPT:
- ACollect requirements
- BDefine Scope
- CCreate WBS
- DDevelop Project Management Plan
9Validated deliverables is an input to which of the following processes?
- ACollect Requirements
- BDefine Scope
- CCreate WBS
- DValidate Scope
Informações
- Descrição
- http://preparepm.com/pmp/scope.html
- Autor
- Yulia Meir
- Idioma
- English
- Visualizações
- 59
- Avaliação
- Ainda sem avaliações Avalie este quiz
Mais sobre Project Scope Management