Unit 205: Cold water systems - practice test

Description

A cold water practice exam
Stuart Lawless
Quiz by Stuart Lawless, updated 13 days ago More Less
james crowley
Created by james crowley over 7 years ago
Stuart Lawless
Copied by Stuart Lawless 13 days ago
0
0

Resource summary

Question 1

Question
When installing a new indirect cold water system, which of the following should happen, according to the Water Regulations?
Answer
  • a. One tap, normally the kitchen sink, should be drawn directly from the supply pipe
  • b. One tap, normally the kitchen sink, should have a dedicated distribution pipe from the storage cistern
  • c. Mixer taps will require double check valves
  • d. Mixer taps should never be installed due to the pressure differences

Question 2

Question
When installing a new indirect cold water system, which of the following should happen, according to the Water Regulations?
Answer
  • a. One tap, normally the kitchen sink, should be drawn directly from the supply pipe
  • b. One tap, normally the kitchen sink, should have a dedicated distribution pipe from the storage cistern
  • c. Mixer taps will require double check valves
  • d. Mixer taps should never be installed due to the pressure differences

Question 3

Question
According to BS6700 and the Water Regulations, a drain off valve should be installed:
Answer
  • a. At every draw off point
  • b. At every high point in the system
  • c. At every low point in the system
  • d. Above the cold water storage cistern.

Question 4

Question
According to BS6700 and the Water Regulations, a drain off valve should be installed:
Answer
  • a. At every draw off point
  • b. At every high point in the system
  • c. At every low point in the system
  • d. Above the cold water storage cistern.

Question 5

Question
Pin holing in copper pipework is commonly caused by:
Answer
  • a. Hard water
  • b. Acidic water
  • c. Alkaline water
  • d. Pure water.

Question 6

Question
Pin holing in copper pipework is commonly caused by:
Answer
  • a. Hard water
  • b. Acidic water
  • c. Alkaline water
  • d. Pure water.

Question 7

Question
While installing pipework in a property, you are called off site to another job. What would be the correct course of action with any open-ended pipework?
Answer
  • a. Place a warning label on every open end
  • b. Cap off with a push fit fitting
  • c. Warn the customer not to interfere with any pipework
  • d. Be as quick as you can to return.

Question 8

Question
While installing pipework in a property, you are called off site to another job. What would be the correct course of action with any open-ended pipework?
Answer
  • a. Place a warning label on every open end
  • b. Cap off with a push fit fitting
  • c. Warn the customer not to interfere with any pipework
  • d. Be as quick as you can to return.

Question 9

Question
One of the major problems when leaving a dead leg in a cold water pipe is:
Answer
  • a. Electrolytic corrosion
  • b. Pitting of pipework
  • c. Reduction in water flow
  • d. Possible bacterial growth.

Question 10

Question
One of the major problems when leaving a dead leg in a cold water pipe is:
Answer
  • a. Electrolytic corrosion
  • b. Pitting of pipework
  • c. Reduction in water flow
  • d. Possible bacterial growth.

Question 11

Question
The use of WRAS approved fittings when installing cold water pipework is:
Answer
  • a. A legal requirement
  • b. To be corrosion resistant
  • c. To avoid contamination
  • d. All of the above.

Question 12

Question
The use of WRAS approved fittings when installing cold water pipework is:
Answer
  • a. A legal requirement
  • b. To be corrosion resistant
  • c. To avoid contamination
  • d. All of the above.

Question 13

Question
On the completion of a new cold water installation, the system has been proven sound. What would the next course of action be?
Answer
  • a. Visual inspection with the customer
  • b. Flush the pipework out then hand over to the customer
  • c. Prepare the benchmark certificate
  • d. Hand over to the customer.

Question 14

Question
On the completion of a new cold water installation, the system has been proven sound. What would the next course of action be?
Answer
  • a. Visual inspection with the customer
  • b. Flush the pipework out then hand over to the customer
  • c. Prepare the benchmark certificate
  • d. Hand over to the customer.

Question 15

Question
What is the most cost effective way to repair a stop valve that has the head gear jammed open?
Answer
  • a. Replace the head gear only
  • b. Replace the whole valve
  • c. Leave in position, and install a new stop valve upstream
  • d. Repack the glands around the spindle.

Question 16

Question
What is the most cost effective way to repair a stop valve that has the head gear jammed open?
Answer
  • a. Replace the head gear only
  • b. Replace the whole valve
  • c. Leave in position, and install a new stop valve upstream
  • d. Repack the glands around the spindle.

Question 17

Question
What is the most cost effective way to repair a stop valve that has the head gear jammed open?
Answer
  • a. Replace the head gear only
  • b. Replace the whole valve
  • c. Leave in position, and install a new stop valve upstream
  • d. Repack the glands around the spindle.

Question 18

Question
What is the most cost effective way to repair a stop valve that has the head gear jammed open?
Answer
  • a. Replace the head gear only
  • b. Replace the whole valve
  • c. Leave in position, and install a new stop valve upstream
  • d. Repack the glands around the spindle.

Question 19

Question
When decommissioning a system, the correct procedure is to:
Answer
  • a. Turn off the water quickly to save any wasted water
  • b. Drain the system down then inform the customer
  • c. Inform the customer first then drain the system
  • d. Use a pump to drain down quickly.

Question 20

Question
When decommissioning a system, the correct procedure is to:
Answer
  • a. Turn off the water quickly to save any wasted water
  • b. Drain the system down then inform the customer
  • c. Inform the customer first then drain the system
  • d. Use a pump to drain down quickly.

Question 21

Question
When decommissioning a system, the correct procedure is to:
Answer
  • a. Turn off the water quickly to save any wasted water
  • b. Drain the system down then inform the customer
  • c. Inform the customer first then drain the system
  • d. Use a pump to drain down quickly.

Question 22

Question
When decommissioning a system, the correct procedure is to:
Answer
  • a. Turn off the water quickly to save any wasted water
  • b. Drain the system down then inform the customer
  • c. Inform the customer first then drain the system
  • d. Use a pump to drain down quickly.

Question 23

Question
What is this item?
Answer
  • a. Fullway gate valve
  • b. Drain off valve
  • c. Stop valve
  • d. Spherical ball valve.

Question 24

Question
What is this item?
Answer
  • a. Fullway gate valve
  • b. Drain off valve
  • c. Stop valve
  • d. Spherical ball valve.

Question 25

Question
What is this item?
Answer
  • a. Fullway gate valve
  • b. Drain off valve
  • c. Stop valve
  • d. Spherical ball valve.

Question 26

Question
What is this item?
Answer
  • a. Fullway gate valve
  • b. Drain off valve
  • c. Stop valve
  • d. Spherical ball valve.

Question 27

Question
What type of valve is shown in this diagram?
Answer
  • a. Spherical ball valve
  • b. Fullway gate valve
  • c. Stop valve
  • d. Drain off valve.

Question 28

Question
What type of valve is shown in this diagram?
Answer
  • a. Spherical ball valve
  • b. Fullway gate valve
  • c. Stop valve
  • d. Drain off valve.

Question 29

Question
What type of valve is shown in this diagram?
Answer
  • a. Spherical ball valve
  • b. Fullway gate valve
  • c. Stop valve
  • d. Drain off valve.

Question 30

Question
What type of valve is shown in this diagram?
Answer
  • a. Spherical ball valve
  • b. Fullway gate valve
  • c. Stop valve
  • d. Drain off valve.

Question 31

Question
When installing a new water service pipe to a property, it should normally be buried between what depths?
Answer
  • a. 135mm to 1,750mm
  • b. 350mm to 750mm
  • c. 1,350mm to 1,750mm
  • d. 750mm to 1,350mm.

Question 32

Question
When installing a new water service pipe to a property, it should normally be buried between what depths?
Answer
  • a. 135mm to 1,750mm
  • b. 350mm to 750mm
  • c. 1,350mm to 1,750mm
  • d. 750mm to 1,350mm.

Question 33

Question
When installing a new water service pipe to a property, it should normally be buried between what depths?
Answer
  • a. 135mm to 1,750mm
  • b. 350mm to 750mm
  • c. 1,350mm to 1,750mm
  • d. 750mm to 1,350mm.

Question 34

Question
When installing a new water service pipe to a property, it should normally be buried between what depths?
Answer
  • a. 135mm to 1,750mm
  • b. 350mm to 750mm
  • c. 1,350mm to 1,750mm
  • d. 750mm to 1,350mm.

Question 35

Question
Identify item C in the diagram.
Answer
  • a. Warning pipe
  • b. Grommet for open vent
  • c. Screened vent
  • d. Inspection flap.

Question 36

Question
Identify item C in the diagram.
Answer
  • a. Warning pipe
  • b. Grommet for open vent
  • c. Screened vent
  • d. Inspection flap.

Question 37

Question
Identify item C in the diagram.
Answer
  • a. Warning pipe
  • b. Grommet for open vent
  • c. Screened vent
  • d. Inspection flap.

Question 38

Question
Which of the following materials is not allowed to be installed on new cold water systems?
Answer
  • a. Copper
  • b. Stainless steel
  • c. MDPE
  • d. Lead.

Question 39

Question
Which of the following materials is not allowed to be installed on new cold water systems?
Answer
  • a. Copper
  • b. Stainless steel
  • c. MDPE
  • d. Lead.

Question 40

Question
What type of valve is designed to shut off the supply of water in a cistern at a predetermined level?
Answer
  • a. Stop valve
  • b. Fullway gate valve
  • c. Float operated valve
  • d. Isolation valve.

Question 41

Question
The fluid category that offers a slight health risk to a customer is:
Answer
  • a. 1
  • b. 2
  • c. 3
  • d. 4.

Question 42

Question
The correct back flow protection device that would be installed prior to a shower mixer valve would be:
Answer
  • a. Single check valve
  • b. Double check valve
  • c. RPZ valve
  • d. Type AG air gap.

Question 43

Question
To protect category 1 water from category 3 water, what would need to be installed, according to the Water Regulations?
Answer
  • a. Single check valve
  • b. Double check valve
  • c. RPZ valve
  • d. Type AG air gap.

Question 44

Question
What would this item be used to test?
Answer
  • a. Pressure
  • b. Category of water
  • c. Flow rate
  • d. pH valve.

Question 45

Question
If a customer’s tap is dripping, what tool can be used to correct the situation?
Answer
  • a. Club hammer
  • b. Stillsons
  • c. Bradawl
  • d. Re-seating tool.
Show full summary Hide full summary

Similar

Unit 202: Electrical principles and processes for building
james crowley
Common Plumbing Principles practice test
james crowley
Unit 203 Revision Question Bank No.2
Oliver Balay
Unit 205: Cold water systems - practice test
Veres alpar
Unit 201: Health and safety in building services engineering
james crowley
Unit 206: Domestic hot water systems practice test
james crowley
Colour theory quiz
james crowley
Unit 108 Above Ground Drainage
james crowley
Structure of the construction industry
james crowley
Applying paper to walls and ceilings level 1
james crowley
Producing specialist decorative finishes quiz
james crowley