  1. 1What capacity is established by averaging the actual output produced in standard hours in previous periods?
    1. ARated Capacity
    2. BDemonstrated Capacity
    3. CLogical Capacity
    4. DTheoretical Capacity
  2. 2How many days of slack is there in the path A->B->C->D->I using the below network diagram? Image for question 2
    1. A95 days
    2. B25 days
    3. C30 days
    4. D0 days
  3. 3Which of the following are lot sizing methods?
    I. Fixed Order Quantity
    II. Kanban Quantity
    III. Agreed Order Quantity
    IV. Time Period Ordering
    1. AI & IV Only
    2. BI, II, & III Only
    3. CI, III, & IV Only
    4. DI, II, & IV Only
  4. 4What is a tool that links customer desires through product design to manufacturing performance and process variables?
    1. AQuality Function deployment (QFD)
    2. Bp chart
    3. CPoka Yoke
    4. DControl Plan
  5. 5Which of the following is counted during periodic physical inventory?
    I. Raw Material
    II. Sub Assemblies
    III. Finished Goods
    IV. Material Received Not in Stock
    1. AI, II & III Only
    2. BIII Only
    3. CI, II, III, & IV
    4. DIII & IV Only
  6. 6In order to have a Kaizan event you must have
    I. Small multi - disciplined team
    II. Team trained in problem solving
    III. Upper Management on the team
    1. AII & III Only
    2. BI & III Only
    3. CI & II Only
    4. DI, II, & III
  7. 7Using the following table, calculate the Mean Absolute Deviation (MAD) Image for question 7
    1. A40
    2. B1400
    3. C140
    4. D400
  8. 8Stock that production workers can draw from without requisitions is called what?
    1. AQuarantined Stock
    2. BFloor Stock
    3. CCritical Stock
    4. DFree Stock
  9. 9A "order to be released" would be what type of MRP Message?
    1. AAction Message
    2. BOrder Message
    3. CManufacturing message
    4. DException Message
  10. 10Inventory that has no known forecast requirement is called
    1. APerishable Inventory
    2. BInactive Inventory
    3. CExcess Inventory
    4. DObsolete inventory

Information

Description
Quiz on DSP_01, created by Jesus De Los Santos on 08/12/2018.
Language
Español
Views
0
Rating
No ratings yet
Rate this quiz
Rate this quiz

Feedback

What is it about?

What do you think of the new look?

How do you like it?