1What is the maximum amount of time that the team should spend in the daily scrum?
- AAs long as it takes
- B1 hour
- C45 minutes
- D15 minutes
- E15 minutes, proportionally less for shorter Sprints
2Please select which statement is the most accurate:
- AAgile Development is an implementation of Scrum
- BScrum is an implementation of Agile Development
- CAgile Development and Scrum are synonyms for the same methodology
- DAgile Development and Scrum are contrasting methodologies
3Which of the following is not a Product Owner responsibility?
- ARunning the daily scrum meeting
- BTeam communication
- CGathering requirements for Product Backlog items
- DInspecting work at Sprint Review
4How should items in the Product Backlog be ordered?
- AAlphabetically first and then by list order in the Product Backlog
- BGrouped by business features first and then chronologically by date of original business request
- CPrioritized by business importance first. The items that result in biggest ROI, must be priorized
first; - DChronologically by date of original business request first and then by list order in the Product
Backlog
5Which of the following is a role in the Scrum framework?
- ADatabase Admin
- BDevelopment Team
- CQA Tester
- DSenior Developer
6The Scrum Framework encompasses rules or guidelines for documentation?
- ATrue
- BFalse
7The individual, detailed pieces of work that are needed to convert a product backlog item into a
working software component or solution are called:- AUser Stories
- BUse cases
- CLine items
- DTasks
8Why does Scrum prevent Product Owners from changing Product Backlog items that are being
worked on during the Sprint?- AThe development team cannot meet their Sprint commitment to complete work if requirements are
changing - BA Sprint cycle is not enough time for senior management review and approve changes
- CThis forces Product Owners to focus on what is really important for the team to develop.
- DThe development team must be able to limit the Product Owner authority
- AThe development team cannot meet their Sprint commitment to complete work if requirements are
9Which of the following is not a Scrum artifact?
- AUser Stories
- BSprint Backlog
- CProduct Backlog
- DSoftware Increment
10You are the new Scrum Master at a company currently doing RUP in three month iterations. Your
current task in switching from RUP to Scrum is to define how long the Sprint cycle should be. In
what units of time should you define the sprint cycle?- AA fixed amount of months
- BA fixed amount of weeks, excluding holidays
- CA fixed amount of days
- DA fixed amount of hours
11Which of the following statements best explains what the term Sprint means in Scrum?
- AA sprint is a specific amount of days for a team to test and resolve any issues prior to product
release or shipment - BA sprint is a specific amount of days for a team to work at a sustainable pace to finish select work.
- CA sprint is an agreed upon period of time for team members to select individual items from the
product backlog to work on. - DA sprint is a specific amount of days for a team to work as many hours as needed to finish
assigned work
- AA sprint is a specific amount of days for a team to test and resolve any issues prior to product
12_____________ can change the priority of items in the _________ backlog at any time.
- AThe Team; Product
- BThe Product Owner(s); Sprint
- CThe Product Owner(s); Product
- DThe Scrum Master; Sprint
13Which of the following is not a Scrum cycle activity?
- ASprint retrospective
- BDaily scrum
- CWeekly inspection
- DSprint planning
14Which of the following statements best describes Product Backlog items?
- AUndefined or poorly defined Product Backlog items should be placed on the Product Backlog with
a low priority - BAll Product Backlog items are the result of a(n) analysis, requirements and/or design phase(s).
- CUndefined or poorly defined Product Backlog items should be kept out from the Product Backlog
until sufficient detail is known. - DEvery Product Backlog item, whether low priority or high priority, should possess sufficient detail
for the Team to complete in a Sprint.
- AUndefined or poorly defined Product Backlog items should be placed on the Product Backlog with
15________________ constitute the Sprint Backlog and are often estimated in hours?
- AUser Stories
- BUse Cases
- CFeatures
- DTasks
16Under what circumstances should separate Product Backlogs be maintained?
- AThere are several Product Owners for one product. Each Product Owner should have their own
Product Backlog - BThere are multiple teams working on independent products. Each unique combination of team and
product should have an independent Product Backlog - CThere are multiple product features being developed by the same team.
- DThere are multiple teams working on the components of the same product. Each team should an
independent Product Backlog
- AThere are several Product Owners for one product. Each Product Owner should have their own
17Who determines whether the development team has been assigned enough work in a Sprint?
- AThe Development Team
- BThe Product Owner
- CThe Product Owner and the Scrum Master
- DThe Scrum Master
18Which of the following is not a Product Owner responsibility?
- AMaintaining the Product Backlog with current information
- BWorking with stakeholders to determine and detail product features
- CAssigning tasks to team members
- DPrioritizing the Product Backlog
19Which of the following activities do not occur at the end of the Sprint? (Choose two)
- ASoftware development
- BRelease deployment
- CSprint review meeting
- DQuality assurance testing
20What does the Scrum Development Team attempt to develop at every Sprint?
- AA product that is ready for customer delivery
- BA completed Sprint Backlog
- CA product that is ready for QA and/or QC testing
- DA product increment that is potentially-ready for customer delivery
21A _____________________ is created during the first half of the Sprint planning meeting and a
_________________ is created during the second half of the Sprint planning meeting?- ASprint Backlog, collection of tasks
- BProduct Backlog, collection of tasks
- CSprint Goal, Sprint Backlog
- DProduct Backlog, Sprint Backlog
22The Sprint planning meeting is comprised of how many sections?
- A4
- B3
- C2
- D1
23What is the maximum duration of each Sprint planning meeting section?
- A1 hour
- B30 minutes
- C4 hours
- D2 hours
- E15 minutes
24From the activities given, which is the latest step in sequence of the Scrum framework?
- ADaily scrum
- BSprint retrospective
- CSprint review
- DSprint planning
25Which of the following is not a Scrum Master responsibility?
- AEstablish priorities together with product owner for Product Backlog items
- BPreventing Senior Management from shifting team priorities
- CEmpowering the team
- DSocializing scrum throughout the organization
26Which of the following is reflected in a Sprint Burn down Chart?
- ATeam Members Name
- BNumber of Product Backlog Items Completed
- CNumber of Tasks Remaining
- DWork Hours Remaining
27How many hours per day should a person on a Scrum team work?
- AA sustainable pace, usually from 7-8 hours per day.
- BAn "ideal day" measuring only when he or she is productive.
- CHowever many hours are needed to get the work done.
- D14 hours.
28According to Scrum, the amount of time for a team to plan Sprint activities is expressed in what
unit of time?- AWeeks
- BDays
- CHours
- DMinutes
29You are the Scrum Master and your Development Team of 6 members has completed six Sprints
with the following information:
Sprint 1: 10 pontos
Sprint 2: 11 pontos
Sprint 3: 15 pontos
Sprint 4: 14 pontos
Sprint 5: 15 pontos
Sprint 6: 10 pontos
The remaining story points for product development total 42. What is the approximate number of
Sprint required to complete product development?- A6
- B5
- C4
- D3
30Under what circumstances should the Product Backlog be reprioritized?
- AThe Scrum Master should reprioritize the Product Backlog only at the end of a new Sprint
- BThe Scrum Master should reprioritize the Product Backlog only at the beginning of a new Sprint
- CThe Team should reprioritize the Product Backlog only at the end of a new Sprint.
- DThe Product Owner should reprioritize the Product Backlog whenever new information is learned
31How could the team and other stakeholders know if a product backlog item is done?
- AThey should ask to the member's development team
- BThey should compare what was done, against the definition of Done established by the Scrum
Team - CAsk the Product Owner
- DAsk the Manager
32What is the primary objective of the daily scrum?
- ATo share with the team what each member has completed in the Sprint, what each member will
work on next, and to report progress roadblocks - BTo give a status report to the Product Owner on what each member has completed in the Sprint,
what each member will work on next, and to report progress roadblocks. - CTo discuss work details with the team since every team member must attend the meeting
- DTo give a status report to the Scrum Master on what each member has completed in the Sprint,
what each member will work on next, and to report progress roadblocks.
- ATo share with the team what each member has completed in the Sprint, what each member will
33Which statement best describes what it means for an activity to be time-boxed?
- AThe activity must take place on a particular date
- BThe activity must start at a particular time
- CThere is a maximum time limit for the activity
- DThere is a recommended amount of time for the activity
34Which statement below best describes the primary objective of the Sprint Review?
- AThe primary objective of the Sprint Review is to demo the Sprint work for Senior Management
- BThe primary objective of the Sprint Review is to demo the Sprint work and to receive feedback
from the Product Owner(s) on the work completed in the Sprint - CThe primary objective of the Sprint Review is to demo the Sprint work and to receive feedback
from the Scrum Mater on the work completed in the Sprint - DThe primary objective of the Sprint Review is to demo the Sprint work and to recommend ways to
work better in the Sprint.
35You are the Scrum Master and the very first Sprint will complete in 5 days. You are creating a
meeting invite for the Sprint Review to demo the items completed in the Sprint. Who should you
invite as a required attendee to the Sprint Review?
1. Product Owner(s)
2. Development Team
3. Business Users- A1, 2, and 3
- B1 and 2 only
- CThe entire company
- D1 only
36You are the Scrum Master. The Sprint will complete in two days. Each day of the Sprint is
equivalent to 8 hours. The team has just enough time to complete all tasks in the remaining 16
hours with the exception of three tasks. Of these three tasks, two tasks (a total of 6 hours) are
required to complete one Product Backlog item and one task (an estimate of 2 hours) is required
to complete another Product Backlog item. How should the development team handle the
remaining three tasks?- AThe development team should negotiate with the Product Owner on the definition of "done".
- BThe development team should work the extra 8 hours to complete their commitment to the Product
Owner - CThe development team should place the two Product Backlog items back onto the Product
Backlog - DThe development team should keep the three tasks on the Sprint Backlog for the next Sprint and
complete those tasks first
37Which statement below best describes the primary objective of the Sprint Retrospective?
- AThe primary objective of the Sprint Retrospective is to identify what went wrong or hindered the
Sprint - BThe primary objective of the Sprint Retrospective is to provide feedback to the Product Owner(s).
- CThe primary objective of the Sprint Retrospective is to recommend ways to work better in the
Sprint - DThe primary objective of the Sprint Retrospective is to review the workcompleted by the Team
during the Sprint.
- AThe primary objective of the Sprint Retrospective is to identify what went wrong or hindered the
38Which of the following is not reflected in a Sprint Burn down Chart?
- ATotal Days in Sprint
- BNumber of Tasks Remaining
- CDay of Sprint
- DWork Hours Remaining
39What artifact shows actual versus planned progress?
- AWork Flow
- BBurn down Chart
- CTask Breakdown
- DStakeholders
40Which of the following is NOT part of the Sprint?
- AThe product is released to customers after each Sprint
- BThe principal goal for a Sprint is to produce release-quality increments in functionality
- CReleases usually incorporate the result of multiple Sprints
- DOccur at times dictated by customer and business needs
41What is the maximum amount of time a sprint retrospective should take?
- A1 hour
- B1 and half hour
- C3 hours for a 30 day Sprint
- D8 hours for a 30 day Sprint
42What happens when all committed items (requirements) are not completed at the end of the
Sprint?- AThe Sprint duration is extended
- BThe tasks are determined to be unnecessary
- CThey return to the product backlog
- DNone of the above
43The most encouraged time of day to hold a Scrum Daily Meeting is:
- AA beginning of the day
- BImmediately after lunch
- C4:30 PM
- D7:00 PM
44Is Scrum Master a "management" position?
- AYes
- BNo
45Who is on the Scrum Team?
- AProject Manager
- BProject Owner
- CProduct Owner
- DDevelopment Team
- EManager
- FCEO
- GScrum Master
46What is the recommended size for a Development Team?
- A6, +3 or -3
- B9
- C6
- D7, +2 or -2
47Who is required to attend the Daily Scrum?
- AScrum Master
- BDevelopment Team
- CDevelopment Team and Product Owner
- DDevelopment Team and Scrum Master
48On a new Scrum Team, the Development Team tell the Scrum Master that they don’t feel the need
for retrospectives. Which answer is correct?- ADiscuss with product owner
- BStart doing retrospectives
- CNone of above
49The Product Backlog is maintained by:
- AThe Scrum Master
- BThe Development Team
- CThe Product Owner
- DThe Product Owner and Scrum Master
50What is the Scrum?
- AA framework within which people can address complex adaptive problems, while productively and
creatively delivering products of the highest possible value - BIt's not a Agile Framework
- CScrum is a complete process to develop software
- DNone of above
- AA framework within which people can address complex adaptive problems, while productively and
51The correct sequence of events in using Scrum framework is as follows:
- ASprint Planning, Sprint, Sprint Retrospective, Daily Scrum, and Sprint Review
- BSprint Planning, Sprint, Daily Scrum, Sprint Review, and Sprint Retrospective
- CSprint Planning, Sprint, Sprint Retrospective, Daily Scrum, and Sprint Review.
- DSprint Planning, Daily Scrum, Sprint, Sprint Review, and Sprint Retrospective
52Who has the authority to cancel a Sprint?
- AThe team members
- BThe Scrum Master
- CThe Product Owner
- DThe Project Manager
53Who defines the Sprint Backlog scope?
- AProduct Owner
- BDevelopment Team
- CScrum Master
- DStakeholders
54What is the major difference between Product Backlog and Sprint Backlog?
- AThe Product Backlog is equal to the Sprint Backlog
- BThe Product Backlog is a subset of the Sprint Backlog
- CThe Sprint Backlog is a subset of the Product Backlog
- DThe Sprint Backlog is owned by the Product Owner
55As the Sprint planning progresses, the workload has grown beyond the development team's
capacity. Which action makes most sense for the Team?- AWork overtime for the Sprint
- BCollaborate with the Product Owner and potentially remove or change items
- CCancel the Sprint
- DStar the Sprint and recruit additional team members
56What does the Sprint Backlog consist of?
- AUser Stories, only.
- BUse Cases
- CSelected Backlog Items and Tasks
- DTest cases
57What happens when the Sprint is cancelled?
- AThe Scrum Team disbands immediately
- BThe complete Sprint Backlog is put back to the Product Backlog
- CThe completed Sprint Backlog items are evaluated for a release and incomplete items are ignored.
- DThe completed Sprint Backlog items are evaluated for a release and incomplete items are put
back to the Product Backlog
58What is the Release Burn down?
- AA graph indicating what has been completed by the Scrum Team
- BA measure of the remaining Product Backlog across the time of a release plan
- CWhat has been completed by the Scrum Team to date
- DThe work remaining to be completed by the Product Owner
59Who is ultimate responsible for the Product Backlog item estimates?
- AThe Development Team
- BScrum Master
- CStakeholders
- DProject Owner
60More than one Scrum Team is working on a single project or release. How should the Product
Backlog be arranged?- AA separate Product Backlog is constructed for each Scrum Team. All of the increments are
integrated at the end in an integration Sprint - BAll Scrum Teams work from a common Product Backlog and integrate their work every sprint
- COnly one Scrum Team should work on Scrum project
- DScrum Teams should have their separate Product Backlogs
- AA separate Product Backlog is constructed for each Scrum Team. All of the increments are
61When many Scrum Teams are working on a project, what best describes the definition of "done"?
- AAll teams must use the same definition
- BEach Team defines and uses its own
- CEach Team uses its own but must make it clear to all other Teams
- DIt depends
62When many Scrum Teams are working on the same product, should all of their increments be
integrated every Sprint?- ANo, that is far too hard
- BNo, each Scrum Team stands alone
- CYes, but only the Scrum's Teams whose work has dependencies
- DYes, otherwise Product Owners may not be able to inspect what is done accurately
63What is the primary responsibility of the Scrum Master?
- ATo Prioritize the Product Backlog
- BTo remove any impediments the Development Team encounters during their work
- CTo work with the Product Owner to develop the Product Backlog
- DTo manage the Development Team
64When should the Product Owner ship or implement a Sprint increment?
- AAt the end of every Sprint
- BWhen the Team feels is done with every Sprint
- CWhenever the increment is free of defects
- DWhen it makes sense
65The Sprint Backlog is owned by?
- AThe Scrum Master
- BThe Product Owner
- CThe Development Team
- DThe Scrum Master and Development Team
66Which objectives are covered as part of Sprint Planning?
- AUnderstanding what functionality the Product Owner desires within the next Sprint and figuring out
how to do it. - BUpdating the scope of the release with all Sprints, end dates, and costs
- CReviewing current functionality that binds the software solution
- DRecalculating empirical velocity, adjusting team capacity accordingly, and projecting end dates
- AUnderstanding what functionality the Product Owner desires within the next Sprint and figuring out
67The Development Team should have all the skills needed to:
- AComplete the project as estimated when the date and cost are committed to the Product Owner.
- BTurn the Product Backlog it selects into an increment of potentially shippable product functionality.
- CDo all of the development work, but not the types of testing that require specialized testing, tools,
and environments.
68Who determines when it is appropriate to update the Sprint Backlog during a Sprint?
- AThe Project Manager
- BThe Scrum Team
- CThe Development Team
- DThe Product Owner
69Which of these may a Development Team deliver at the end of a Sprint (choose 2)?
- AA single document, if that is what the Product Owner asked for
- BAn increment of software with minor known bugs in it
- CFailing unit tests, to identify acceptance tests for the next Sprint
- DAn increment of working software that is "done."
70Which three activities will a Product Owner likely engage in during a Sprint? (Choose 3)
- ARun the daily Scrum
- BAnswer questions from the Development Team about items in the current Sprint
- CUpdate the Sprint burndown chart
- DWork with the stakeholders
- EPrioritize the Development Team's activities.
- FProvide feedback
71Development Team members volunteer to own a Sprint Backlog item:
- ADuring the Daily Scrum
- BWhenever a team member can accommodate more work
- CNever. All Sprint Backlog Items are "owned" by the entire Development Team, even though each
one may be done by an individual team member - DAt the Sprint planning meeting
72Which two are properties of the Daily Scrum? (Choose 2)
- AIt is fifteen minutes or less in duration.
- BIt is facilitated by the team lead.
- CIt consists of the Scrum Master asking the Team members the three questions.
- DIts location and time should remain constant.
73What is the primary way a Scrum Master keeps a Development Team working at its highest level
of productivity?- ABy ensuring the meetings start and end at the proper time
- BBy facilitating Development Team decisions and removing impediments
- CBy preventing changes to the Backlog once the Sprint begins
- DBy keeping high value features high in the Product Backlog
74Which statement best describes Scrum?
- AA framework within which complex products in complex environments are developed
- BA defined and predictive process that conforms to the principles of Scientific Management
- CA cookbook that defines best practices for software development
- DA complete methodology that defines how to develop software
75Which of the following might the Scrum Team discuss during a Sprint Retrospective?
- AMethods of communication
- BThe way the Scrum Team does Sprint Planning
- CSkills needed to improve the Development Team's ability to deliver
- DIts Definition of Done
- EAll of the above
76Which three questions are answered by all Development Team members at the Daily Scrum?
(Choose three)- AWhat work am I going to do today?
- BWhy were you late?
- CWhat impediments are in the way of my accomplishing my work?
- DWhat work did I do yesterday?
- EHow is the Sprint proceeding?
77When is the Sprint Backlog created?
- AAt the beginning of the project
- BPrior to the Sprint Planning meeting
- CDuring the Sprint
- DDuring the Sprint Planning meeting
78The Sprint Goal is selected before the Sprint Backlog is created.
- ATrue
- BFalse
79Who should know the most about the progress toward a business objective or a release, and be
able to explain the alternatives most clearly?- AThe Product Owner
- BThe Scrum Master
- CThe Project Manager
- DThe Development Team
80Upon what type of process control is Scrum based?
- AHybrid
- BDefined
- CComplex
- DEmpirical
81What is the maximum time that Scrum recommends the team spend in the daily scrum (daily
standup)?- AFifteen minutes
- BThirty minutes
- COne hour
- DFour hours
- EAs long as it takes
82Which topics should be discussed in the Sprint Review?
- Athe process
- Bcoding practices
- Call of the above
- DSprint results
83During the sprint review the project is assessed against the ____________
- ASprint goal
- BSprint Planning
- CSprint review
- DSprint retrospective
84How many principles form the foundation of the Manifesto for Agile Software Development?
- A10
- B9
- C12
- D15
85How should the Product Backlog be arranged?
- AProduct Backlog items should be sorted by level of effort or complexity in descending order.
- BProduct Backlog items should be sorted by business priority in descending order.
- CProduct Backlog items should be date sorted in ascending order.
- DProduct Backlog items should be grouped by business category or feature.
86Which two of the following are reasons for considering Agile? (Choose two.)
- AEvaluating Data for Agile Marketing
- BFocus on Customers
- CFocus on Employees
- DEvaluating Data based on Current trends
87The _____________ control model requires that every piece of work be completely understood.
- ADefined process
- BEmpirical Process
- CIncremental Process
- DSix Sigma. Process)
88The _____________ Team is responsible for delivering potentially shippable product increments
at the end of each Sprint.- ADevelopment Team
- BScrum Team
- CCross-Functional Team
- DSelf-Managing Team
89True or False: Scrum Team is self-empowered to do whatever is necessary to achieve sprint goal
within organization guidelines.- ATrue
- BFlase
90Select which of the following statements is the most accurate.
- AThe Scrum Master is responsible for documenting the Sprint Retrospective discussion.
- BThe Scrum Master is responsible for summarizing the Sprint Retrospective discussion
and reporting the discussions to Senior Management. - CThe Product Owner is responsible for summarizing the Sprint Retrospective discussion
and reporting the discussions to Senior Management. - DThe Scrum Master is responsible for facilitating and participating in the Sprint
Retrospective
91Select which option best completes the following statement: _____________ is all about response
to change.- AChange management
- BPlanning
- CCustomer satisfaction
- DAgile
92________________ constitute the Sprint Backlog and are often estimated in hours.
- AStories
- BUse Cases
- CFeatures
- DTasks
93True or False: The Scrum Framework encompasses rules or guidelines for architecture?
- ATrue
- BFalse
94The term Agile Development was first introduced in:
- AAn addendum called Project Management Principles
- BThe Agile Manifesto
- CLean Process Improvement
- DThe Scrum Framework
95What is an ideal size for a Scrum team?
- A13
- B4
- C7
- D10
96True or False: Story Points are for sizing, not for time estimation?
- ATrue
- BFalse
97Which of the following are activities found in the Scrum framework?
- AScrum planning
- BDaily standup
- CScrum review
- DDaily planning
98In an Agile environment, planning happens at which two levels? (Choose two.)
- Arelease planning
- Bbacklog planning
- Csprint planning
- Dproduct planning
99Which of the following are artifacts associated with Scrum?
- AProduct specification
- BEffort chart
- CSprint backlog
- DProduct owner list
100What are the four stages of team development?
- AForming, Storming, Norming, Performing
- BLow, Medium, High, Critical
- CDeveloping, Shaping, Finishing, Completion
- DGathering, Building, Developing, Educating
101It's come to your attention that some team members feel that Carlos is a negative influence on the
team. You can certainly understand why — he believes that everything is doomed. What should
you do?- ARemove Carlos from the team.
- BUse Carlos as an asset, particularly during risk identification
- CIgnore him and hope it goes away
- DEscalate the issue with the higher authorities
102Andrea is a very productive team member, but she’s always poking around for information and
asking for details, especially in areas of the project that she isn’t involved in. What should you do?- ATell her to stop being so nosy
- BThink about why she's asking questions and try to address the root of the problem
- CIgnore her and hope it goes away
- DTell her to contact a Subject Matter Expert
103A classification for any development methodology based on iterative and incremental
development, where requirements and solutions evolve through collaboration between selforganizing,
cross-functional teams is called:- AScrum
- BApplication Development
- CWaterfall Development
- DAgile Development
104A __________ chart is a graphical representation of work left to do versus time.
- Aburn down
- Bflow
- Cpie
- Dgantt
105True or False: Scrum teams may include cross-functional teams?
- ATrue
- BFalse
106Which system provides evolutionary framework for incremental process improvement?
- AKanban
- BAgile
- CPoke-Yoke
- DService Management
107Which of the following is a role in the Scrum framework?
- ATeam
- BSystem Administrator
- CSoftware Tester
- DScrum Developer
108Which type of testing defines, end-to-end testing done to ensure that nothing is broken in the
integrating modules?- AUser acceptance testing
- BIntegration Testing
- CRegression Testing
- DExploratory testing
109Which two of the following are Seven Waste’s of Software Development? (Choose two.)
- AExtra features
- BTask Switching
- CPath Analysis
- DProcess Integration
- EScope Change
110True or False: Scrum is a collaborative effort involving developers and customers in an ongoing
dialog?- ATrue
- BFalse
111Which of the following are the two features of the Scrum Teams? (Choose two.)
- ARules of Etiquette
- BCross-functional
- CProcess Oriented
- DCan have multiple Product Owner’s
112True or False: The sprint planning is a one-day time boxed meeting divided into two 4-hour
sessions?- ATrue
- BFalse
113_______________ is a neologistic metaphor referring to the eventual consequences of poor or
evolving software architecture and software development within a codebase.- AQuality Analysis
- BSoftware Analysis
- CBusiness Dept
- DTechnical Debt
114A line in the Agile Manifesto reads, "____________ over following a plan". Please select which
option best completes the statement.- ASoliciting input
- BAsking the customer
- CResponding to change
- DCompleting requirements
115Which level of planning concentrates on the future of the product and its ultimate goal with the
possible changes to them and their likelihood?- AProduct Roadmap Planning
- BRelease Planning
- CIteration Planning
- DProduct Vision Planning
116Agile software development also promotes industry best practices that _______________ and
___________________- AEmphasize teamwork; customer involvement
- BEmphasize managers; stakeholder involvement
- CEmphasize team members; partner involvement
- DEmphasize software developers; manager involvement
117A line in the Agile Manifesto reads, "____________ and _____________ over processes and
tools". Please select which option best completes the statement.- ACustomer; Individuals
- BPeople; Relationships
- CCustomers; Employees
- DIndividuals; Interactions
118According to Scrum, the amount of time for a team to plan Sprint activities is expressed in what
unit of time?- AWeeks
- BMonths
- CHours
- DMinutes
119___________________is responsible for the Scrum process, facilitate the team and protect the
team from outside noise.- AScrum Master
- BScrum Owner
- CProduct Owner
- DStakeholder
Information
- Description
- Quiz on Certified Scrum Master (CSM), created by Alvaro Plagges on 13/03/2019.
- Author
- Alvaro Plagges
- Language
- Español
- Views
- 12
- Tags
- Rating
- No ratings yet Rate this quiz
More on Scrum Framework and Principles